uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (2685)

closed #164196

Traffic Related Complaints

Case Date:
4/29/2018

Construction is ridiculous. You have every street tore up and the traffic lights are not letting traffic get through properly! Why not do one street at a time. Enough is enough! And stop bringing more people in!

closed #164198

Excessive Growth

379-411 South Henderson Street

Case Date:
4/29/2018

The bushes are overgrown and cover the sidewalk. It is hard to walk on the sidewalk without hitting ones head on the bushes.

closed #164248

Biking & Walking

Case Date:
5/2/2018

The Bloomington Bagel Company at 113 N. Dunn Street recently installed giant umbrellas on their outdoor patio tables. As a result, the tables and chairs are extending into the pedestrian right of way on the sidewalk. The umbrellas are also not tall enough to safely walk under. It appears to be presenting several hazards and blocking safe access for pedestrians and individuals who use wheelchairs.

closed #164478

Blocked Sidewalk

Case Date:
5/19/2018

Pedestrian bridge on E Second near Anita has overgrowing branches. Need a trim.

closed #164513

Traffic Related Complaints

Case Date:
5/22/2018

Trying to travel anywhere on the South side is deplorable. Finish a project before you close down more roads. There is no one working on W Gordon Pike anymore and you started E Rhorer. Then you have Country Club shut down and just put up signs that Grimes is going to be closing soon. What the hell? This is a shit show. You are making it impossible to travel from East to West and causing MASSIVE traffic backups. Please finish Country Club or Gordon before you close down Grimes too. Did you even bother to stop and think these decisions through? If so I would like to know who in what world decided all these closures was a good idea, on top of Tapp being closed and 37 being worked on, let alone other projects in Bloomington.

closed #164517

Traffic Signals

2755 West Bloomfield Road

Case Date:
5/22/2018

Backed up West bound traffic on Bloomfield Road is made a bit worse with the lights here off sensor during construction. The timing is providing more time than needed for cross traffic and turn lane, should be set much longer for E-W Bloomfield. The light further east at Twin Lakes has very sensitive sensor for cross traffic, also adding to the backup, could let the cross traffic wait longer and reset if they escape with a right turn on red to keep the E-W flow going if it can.

closed #164532

Blocked Sidewalk

1202 S Henderson ST

Case Date:
5/23/2018

Sidewalk is blocked from both sides - by a tree on the street side of the sidewalk and a bush on the other side.

closed #164553

Traffic Related Complaints

Case Date:
5/24/2018

There is an intersection on 3rd Street and South Park Ridge Road that is extremely dangerous. I had a friend get in an accident today making a left out of South Park Ridge Rd. onto 3rd street. Thankfully, no one was injured, however, both cars were totaled. This is the second person I know from my apartment complex that has gotten hit making that same left turn. I, myself, have almost gotten hit there. Upon speaking to the police officer at the scene today, I discovered that there have been numerous accidents at that intersection. There needs to be a traffic light there, or at least a blinking yellow since the speed limit raises to 40 a light before. I hope that other people have complained about this and that this complaint isn't taken lightly. The safety of the many students and permanent residents of Bloomington are more important than the flow of traffic.

closed #164616

Other

Case Date:
5/31/2018

Crossing needed at 7th and North Union. Or stop sign or something to allow bikes to safely Criss to campus. Is a bike lane and Greenway, need to be safe to actually bike

closed #164671

Blocked Sidewalk

Case Date:
6/4/2018

1017 E. First. Yew and Vines obstruct sidewalk at front walkway