uReport

City of Bloomington, Indiana

Slide

Search

Fields to display

Search Results: (3099)

closed #201442

Utility Construction Projects

823 N Dunn ST

Case Date:
3/11/2025

Cylindrical hole about 4" radius drilled into street by fiber-optic workers and left unfilled. Dangerous area because there are no sidewalks along at that location, so people are forced to walk on the street. Hole is closest to SW corner of intersection. Ankle-breaker!

closed #201500

Utility Construction Projects

2919 N Bankers DR

Case Date:
3/13/2025

Duke Energy has refused to remove a large orange cable that is down on the length of my property (3/4 of an acre). They say someone else needs to take care of it, like maybe a cable company. I am concerned that it is dangerous to kids in my neighborhood and I cannot do yard work around it. Moreover, it is in the utility easement. They said to pick it up and see if it is attached to the utility line and I am unwilling to do that because it seems risky. In any case, no utility should be leaving their waste on my property and they should take responsibility for removing it safely.

closed #202158

Utility Construction Projects

Case Date:
4/18/2025

This is the mess still behind my home from the fiber optics people…

closed #202463

Utility Construction Projects

720 W 3rd ST

Case Date:
5/4/2025

Gigabtye Contracted companies placed these while laying lines but have not returned to address their lack of filling in the side. This one just a great example but many if not all are this bad. Easy to fall into or wreck your bike if you don’t see the ruts on all sides. Especially for those of us who walk/ride at night. Where’s the oversight if any? Please fix these.

closed #202606

Utility Construction Projects

3365 E Longview Ave

Case Date:
5/12/2025

This huge break in the road was not properly marked - the cone was well over a foot from the edge - and I hadn't realized how far in it went until it was too late to avoid it. Two of my tires popped, and my car had to be towed. I'd like the city to reimburse me for replacing them, but more importantly, I'd like for them to make sure these holes are properly marked.

open #204424

Utility Construction Projects

2591 S Walnut Street Pike

Case Date:
7/23/2025

The contractor doing underground work (fiber?) left a bunch of loose soil along the west side of Walnut St Pike. They came back and seeded and strawed some mother areas but not this.

closed #185315

Utilities Yardwork

Case Date:
8/29/2023

My neighborhood located between Sherwood Oaks church and Jackson Creek middle school is currently undergoing placement of fiberoptic cables. I strongly prefer to not have this done in my yard. My neighbors seem to feel the same. It's already been done recently with Smithville (last year). They nearly hit a gas line in my neighbor's yard two houses over in our cul de sac. They did hit a water line in the yard across the street from us in the cul de sac. They seem to dig without much regard for our approval and preferences as homeowners. Do we have rights as homeowners to decline placement of these fiberoptic cables? I appreciate any correspondence. Ryan Niehaus 2515 E Caray Ct Bloomington IN

closed #187414

Utilities Yardwork

3617 E Post RD

Case Date:
2/23/2024

I would like to know who installed this on my property. It’s leaking e. coli and that needs to be fixed.

closed #200739

Utilities Yardwork

900 E 1st ST

Case Date:
2/4/2025

Should this be corrected to avoid falls or other problems?

closed #203468

Utilities Yardwork

Arden Drive and Windsor

Case Date:
6/17/2025

waste of city water