Street Snow Removal
2442 S Woolery Mill DR
- Case Date:
- 1/15/2010
Address is not exact--location is sidewalk near int. of Woolery Mill Drive and Adams Hill Circle. Snow has been plowed onto sidewalk 2 or 3 feet high, has not been removed.
Potholes, Other Street Repair
245 W Patterson Dr, Bloomington, IN 47403, USA
- Case Date:
- 9/29/2022
Would love an update to case 180880
Sidewalk & Curb Complaints
2453-2499 South Henderson Street
- Case Date:
- 9/25/2017
Damaged guardrail on culvert side of street. Can be seen from google maps. I first reported this situation last summer (2016) and was advised city was awaiting contract and materials. I reported it because I feel it could become a safety hazard during the winter months with slick and icy streets.
Potholes, Other Street Repair
2455 E Rogers RD
- Case Date:
- 7/9/2020
A precarious and unsafe situation on Rogers Road. I reported this same issue a few days ago. The situation has obviously become worse. Photo is self explanatory.
Traffic Signals
2483-2499 East 3rd Street
- Case Date:
- 7/6/2015
To whom it may concern:
I'm writing today about the intersection of S. Hillsdale Dr and E 3rd St in Bloomington, Indiana. Specifically, I'm concerned with the functioning of the traffic signal at that intersection. In short, because the stop line is set pretty far back on Westbound lane of E 3rd St, Westbound drivers rushing through the yellow light have to go a very long way, much longer than those of us using the yellow to make a left turn northbound onto Hillsdale (when there is traffic, there is no choice except making left on the yellow). I'm not doing a great job explaining it here but given the long set-back, it seems odd that both of those lights turn yellow at the same time. I'd be happy to explain better via phone and/or someone could easily observe this dynamic at said intersection. Thanks
Sidewalk & Curb Complaints
2487 S Brittany LN
- Case Date:
- 9/1/2020
The sidewalk contruction on E Winslow Rd has been going on since winter. The project has more says with no one working on it than working on it. today I saw only 4 men on the whole project and none of them were doing any work at 11 AM. Lots of road projects in Bloomington are started and then left abandoned for months. As a resident I don't like this. If they start something they ought to work on it till finished then move on. Im frustrated with the disruption that has been going on for 7 months for a very small project.
Sidewalk Requests
2495 S Walnut Street PIKE
- Case Date:
- 10/5/2018
The sidewalk ends abruptly in a very dangerous intersection. This turn needs to be improved for pedestrian safety. The sidewalk should not be on only one side of the road, particularly in such a dangerous location for pedestrians to cross the road, just to have the sidewalk reappear only meters away.
Trash
250-298 North Lincoln Street
- Case Date:
- 5/18/2015
Mountain of garbage piled up along Lincoln, just south of 7th street.
Excessive Growth
2500 E 3rd ST
- Case Date:
- 8/16/2023
Bushes and weeds between Hot Pot and Smoke Time partially blocking the sidewalk along the south side of 3rd street.
Blocked Sidewalk
2500 E 3rd ST
- Case Date:
- 7/6/2024
South side of 3rd St, between Woodscrest and Overhill, there's a construction sign and posts laying down across the sidewalk and completely blocking it. Thank you!