closed #206699

City Construction Projects

1600 W Bloomfield RD

Case Date:
11/7/2025

Employees or others were in Bloomfield rd by the block wall with no cones or hazard lights Only 1 person with a safety vest holding a slow sign. Only 2 of the 4 had orange on. 1145 today

closed #206740

City Construction Projects

Heather Dr/ Peppergrass entrance

Case Date:
11/11/2025

Ground has been dug up and left unfinished for quite awhile. I’m not sure what is supposed to be happening at the location but there is a big ditch just sitting there. Cones have fallen over. A mess on the other side of the sidewalk also.

closed #206697

City Construction Projects

1600 W Bloomfield RD

Case Date:
11/7/2025

Employees or others were in Bloomfield rd by the block wall with no cones or hazard lights Only 1 person with a safety vest holding a slow sign. Only 2 of the 4 had orange on. 1145 today

closed #206288

City Construction Projects

Downtown Bloomington Indiana

Case Date:
10/13/2025

The islands of trees surrounded by curbs that are being constructed in the roadways throughout the city. I’m wondering why the city is installing them since they’re already responsible for the death of a deputy sheriff who died from her injuries sustained during a traffic accident in which she was responding with lights and sirens to a call got hit going threw a red light and the ambulance was called but unable to get there for an extended period of time due to the trees and curbs constructed in the roadways throughout the city leaving no room for the ambulance to navigate around pulled over vehicles. I thought that when the city removed the brand new islands that they had constructed that they would find a better speed diversion, or would at least limit the construction of new islands but instead we now have many islands that make it nearly impossible to turn onto certain roads and streets due to the lack of room because of the brick filled curbed islands and trees. It seems ridiculous to me that the people are paying for obstacles in the roadway that make it nearly impossible to drive on the streets in Bloomington. They are wonderful for bicycling and walking however seeing as the city of Bloomington does not enforce no riding bikes on the sidewalks I don’t see much importance in having bicycle lanes in the roads since people on bicycles are allowed to ride their bikes on the sidewalks, which is extremely dangerous in my opinion but I’ve witnessed hundreds of bicyclist on the sidewalks in the downtown district and on Kirkwood, where there are police station within feet of them riding their bikes on the sidewalk and no attempt to stop them has been made.

open #205728

City Construction Projects

Heather Dr. front entrance to Peppergrass north side of street.

Case Date:
9/16/2025

There are 2 holes located in the grass area between the sidewalk and Heather on the north side of the street. I would like them to be filled in for safety. Both are before you get to Laurel Ct. Thank you, Kaye Beavers, Peppergrass HOA, landscaping

closed #206881

City Construction Projects

2nd and rogers

Case Date:
11/20/2025

When paving projects done by old hospital

closed #161401

City Performance

Case Date:
10/3/2017

a few weeks ago i wrote on ureport about the missing crosswalk button device at the intersection of west 3rd street & franklin. later when i looked at ureport again i could see that a city engineer had contacted the i-69 project to tell them it was their problem. it still didn't get fixed, so i called the phone # for 1-69 & left a voice message. a man from there called me back & said that their project doesn't go that far, so it's up to the city to fix that. his name is kirk roth so if there is still a dispute, please call him at the phone# on their website. this needs to get resolved please for pedestrian safety at a very busy intersection. people who live on yancy etc need to cross there to get to the bus-stop across the street to go to work. thanks

closed #161818

City Performance

Case Date:
11/14/2017

What used to be a 10 minute drive to work now takes close to 35. Why? Construction on Tapp, 37, Rodgers, Walnut, 10th Street, Dunn, Fee, and Gordon Pike closed. There is literally not any route left to get to work. Everyone on the south side is forced to sit in traffic for two to three times the normal length due to terrible planning by the city in the closing of streets and construction that has effectivity shut down part of the city and prevent us from going anywhere or doing anything.

closed #161950

City Performance

Case Date:
12/5/2017

To: Mayor Hamilton, if you could please look at ureport case #161401 from october 3. now it is 2 months later & that crosswalk button at a very busy intersection (west 3rd st & franklin) still isn't fixed. i see mr. cibor's note there from oct.18 but even if he has to coordinate with another agency, it still shouldn't take this long. i am afraid i am going to get hit by a big truck. i cannot walk very fast because of medical problems. also, there will be snow & ice soon, making crossing there even more difficult.

closed #148989

City Performance

612 N Washington ST

Case Date:
10/9/2015

Trash all over porch 612 n Washington