uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (65258)

closed #48681

Blocked Street

413 E 10th ST

Case Date:
8/20/2001

Tree branches and shrubs blocking the sidewalk. Causing pedestrians to walk around the obstruction and into the streets.

closed #48683

Blocked Street

217 E 10th ST

Case Date:
8/20/2001

Tree limbs and shrubs blocking the sidewalk. Its causing pedestrians to go around the obstruction and into the streets.

open #156012

Bus Services (Bloomington Transit)

Case Date:
9/19/2016

I would like to make a suggestion for a bus stop at Bryan Park. I know many IU students who park at that location and walk to campus and it would be a convenience for them to be able to ride a bus in bad weather conditions, as well as a safety for them after dark. I appreciate the consideration!

closed #126801

Business

Case Date:
6/18/2012

I'm starting a new cleaning business & I was wondering if I need a licenses for passing out flyers in the city restrictions!

closed #121873

City Construction Projects

502 N INDIANA AVE

Case Date:
8/1/1995

WITH THE NEW SIDEWALK GOING IN ON 500 BLOCK OF INDIANA, MR. DEKALB IS CONCERNED ABOUT HIS RETAINING WALL.

closed #121928

City Construction Projects

3110 N DAVID DR

Case Date:
7/12/1995

closed #122099

City Construction Projects

1204 E Wylie ST

Case Date:
5/17/1995

A section of sidewalk was removed last fall and was never replaced.

closed #125024

City Construction Projects

Case Date:
2/7/2012

Wet cement through entire lane with no covering or cones or signage on 10th east of bypass heading east

closed #125721

City Construction Projects

Case Date:
4/13/2012

Hi, I ride my bike to work from Tamarron to North Walnut. Usually I take the bike route, including the Grimshaw Trail beside the train tracks, then cross the Bypass to Eastgate. Because of the construction on the Bypass, Eastgate is now closed, but there is no warning until you actually get there, which is very inconvenient. I also don't know how else I can get to my destination without either going all way down to 3rd, which would add about 10 minutes to my trip in each direction, or take my life into my hands by riding on 10th (I know, I know, the spandex brigade do this, but at 49 I've moved beyond the "live fast, die young, leave a good looking corpse" philosophy). What I would like to know, is how can I get to work safely if I can't go from the Grimshaw Trail over to Eastgate, and why do you not warn cyclists a little earlier (like say at Pete Ellis Drive and maybe Union Street on the other side) that Eastgate is closed so we don't waste even more time heading in that direction? Thanks, Gerry Matthews

closed #125782

City Construction Projects

500-520 S Walnut St

Case Date:
4/18/2012

Regarding construction on South Walnut Street- at the intersection with second street, motorists are trying to go north from both lanes south of second into the single lane north of second street. These lanes need to be clearly marked during construction as typically the far left lane is for left turns only. Please make it easier for people to know where to go. Thanks.