uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (120599)

closed #132957

Trails

Clear Creek Trail

Case Date:
7/23/2013

water overflowing a trail

closed #153600

Biking & Walking

Clear Creek Trail

Case Date:
6/18/2016

On the bicycle sidepath bridge, where Tapp Rd goes over Clear Creek, some sheet metal has pealed loose and sticks up. Here is a Google Maps Satellite view showing its location: https://goo.gl/maps/uyK2Pq3j1h12

closed #144788

Trails

Clear Creek Trail

Case Date:
4/26/2015

porta potty has no toilet paper and desperately needs to be pumped.

closed #201128

Trails

Clear Creek Trail

Case Date:
2/24/2025

Porta Potty's on both ends of these trails need cleaned. From Tapp to That rd.

closed #203340

Trails

Clear Creek Trail

Case Date:
6/11/2025

The entire length of the Clear Creek Trail from Tapp Road to Church Lane needs serious tree trimming work. The number of branches obstructing the path is quite high all throughout the trail. It's dangerous as people dodge branches.

closed #204365

Trails

Clear Creek Trail

Case Date:
7/21/2025

Hi! I was wondering if there might be any plans, long-term or short-term, for devising a somewhat less death-defying way for the Bloomington Rail Trail to cross Rogers Road (between Gordon Pike and That Road). Especially if you are on the Trail traveling south, because of the angle at which the Trail crosses Rogers, it is nearly impossible to see oncoming north-bound traffic. I am a long-time user of the trail (for more than 15 years), and have crossed Rogers at that point countless times, on foot and on my bicycle, as there really was no other option. Lately, however, I have been using the new “spur” trail, and crossing through to That Road using the construction staging area for the “SOMO” development, so that I can then cross Rogers at a 90° angle, with a clear view of traffic. That is a less-harrowing way to cross Rogers, of course. But it is not clear to me that the spur trail will continue to access That Road after the “SOMO” development is fully built out. And, using this method does mean that I have to use the traffic lane over the narrow bridge where That Road crosses over Clear Creek before I can re-join the Rail Trail headed south. It seems to me likely that traffic on this part of Rogers will increase when the Gordon-Fullerton connector is completed next month, exacerbating the situation. So, this is not an emergency of any kind. But just a query to see if the City has any plans to address the issue. Thank you for your time, and for all the good work that you do.

closed #182984

Trails

Clear Creek Trail, Bloomington, IN 47403, USA

Case Date:
2/28/2023

Just wanted to thank you for cleaning the trail today. It was much appreciated!

closed #183190

Parks & Playgrounds

Clear Creek Trail, Bloomington, IN 47403, USA

Case Date:
3/21/2023

I am wondering why all the bird houses have been removed from the trail stretching from That Road Trailhead north for about a mile. I have watched these nest boxes being used by native house wrens and tree swallows for years. Thanks!

closed #184968

Trails

Clear Creek Trail, Bloomington, IN 47403, USA

Case Date:
8/9/2023

Hello, There's a tree down here at clear creek trail. Thanks, Brandon

closed #184969

Trails

Clear Creek Trail, Bloomington, IN 47403, USA

Case Date:
8/9/2023

Sorry, that last issue was supposed to include more detail. The large tree is down here is at the roundabout sign on the Rockport Rd side of the Clear Creek trail. Thanks!