closed #171952
Utilities Construction
511 W Pargrave PL
- Case Date:
- 3/9/2020
Hole in utility lid with no meter. All other lids on this street have smart meters so I just want to make sure this one wasn’t vandalized
Hole in utility lid with no meter. All other lids on this street have smart meters so I just want to make sure this one wasn’t vandalized
Three very large pipes have been lying in my yard for over one week now. I believe that this is for a contracted public works project. I do not want to approach the workers during this public health crisis as they are not wearing face masks. I would like to be able to mow my lawn this weekend, and I do not feel that the lawn of an occupied house is the appropriate place to store construction equipment. I would like to request that the workers are instructed to remove the pipes from my lawn either today (Thursday, April 09, 2020) or tomorrow. In the event that this is not a water-related project, I would assume the city has permits on file to communicate with the appropriate party.
There is water coming up from the street here. It's actually been happening for months. Looks like either some sort of water main break.
There is a yellow plug in the concrete that is a tripping hazard.
metal culvert st entry to parking lot has rusted out and collapsed, leaving an 18 inch hole near a fire hydrant. I talked with Ed last week. my phone is 812 325 5968
I've recently had a plumber repair a water leak for me and he referred me to contact you guys. He said that I need to ask you guys to come out and replace my very old concrete water main area with the newer pipe/fittings and the composite circular area around the main.
Open manhole cover about half block south of Mortan and 11th, west side of road
Water meter covering busted. Looks like the ureport photo issue still hasn’t been fixed so email me for the photo
I was walking my dog today at 5:30 5:40 and walked on the yard in front of my house and I fell through the manhole cover in the water system the lid for the manhole where the water supply is located was obviously horrifically play inaccurately placed and is leading to it being removed and I stepped on it and fell through and hurt myself so this needs to be repaired as soon as possible
Hello, There has been utilities construction going on by our apartment for over a month now. We understand that there is a lot of noise that comes along with it, especially since they have to break through multiple feet of rock to be able to place new sewer lines. We have been understanding in the last few weeks as rock hammering began at 7AM and went on through 5PM Monday-Friday. Even as this construction extended to Saturdays as well. As of last night however, the construction went on all night long. I am guessing that since this is a city run construction project that the noise ordinance was overlooked, however with the continued rock hammering this is unacceptable. It is disruptive and prevented us from sleeping through the night (which is especially impressive given that we have grown accustomed to the street noise typical of living on Walnut Street). Again, we get that this is an important project and that there is a lot of noise that comes along with that. However work through the night cannot continue. Sincerely, Brandon Fricke