uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (115302)

closed #167464

Potholes, Other Street Repair

412 W 16th St, Bloomington, Indiana, 47404

Case Date:
2/14/2019

pothole in street

closed #167465

Biking & Walking

1606 S Rogers ST

Case Date:
2/14/2019

The multi-use path on South Rogers street, specifically between The Warehouse and Cherokee drive, is covered in debris from recent road work / Switchyard Park work trucks. The debris is concerning because it could be hiding glass or other things detrimental to bike tires. Commuters in that area will be grateful if this could be cleaned. Thanks.

closed #167466

Potholes, Other Street Repair

401-499 S Ballantine Rd, Bloomington, Indiana, 47401

Case Date:
2/14/2019

Huge pothole in right hand lane of Ballantine immediately before the intersection w E Third St.

closed #167467

Potholes, Other Street Repair

501 N Morton ST

Case Date:
2/14/2019

Two potholes at the intersection of E Third and Pete Ellis, when you turn off E Third onto Pete ellis.

closed #167468

Blocked Street

Case Date:
2/14/2019

Bike lane blocked. West side of N College just south of train bridge. Ticketing has been ineffective. I first reported this particular vehicle in this particular location in ticket #167325 on feb 6.

closed #167470

Potholes, Other Street Repair

116 E 3rd St, Bloomington, Indiana, 47401

Case Date:
2/14/2019

pot hole in the right lane east bound by the intersection

closed #167471

Potholes, Other Street Repair

601 S Woodlawn AVE

Case Date:
2/14/2019

Second Street and Woodlawn Streets intersection: there are several potholes in the northbound lane which are very hard to avoid.

closed #167472

Trash

1306 S Madison ST

Case Date:
2/14/2019

closed #167473

Traffic Signals

2701-2799 S Rogers St, Bloomington, Indiana, 47403

Case Date:
2/14/2019

Rogers & Country Club light: 2 situations affect me and 1 doesn't. I don't know what's going on on the sides of the intersection I'm not on, so maybe it's more than these 3 issues. I'm there around 7:50 am on weekdays. There is a long line of backed up eastbound traffic, probably 3-4 light cycles to get through. It doesn't affect me. These next two affect me. Around 7:45 - 8:00 am (maybe earlier) there has begun to be long backed up northbound traffic. I'm guessing it's related to Gordon Pike closure as the back-up just restarted this week with this new closure of Gordon (it was an issue with the former closure but has been MUCH better with Gordon Pike opening). I'd guess it's 3-4 light cycles to get through but I'm turning west so I can get into the left-turn lane within 1 - 2 cycles. Third situation is how backed up eastbound is at 5:15-5:30 pm (maybe later, too) on weekdays. It takes about 4 light cycles to get to the green light.

closed #167474

Potholes, Other Street Repair

Case Date:
2/14/2019

Pothole in front of 512 S Jordan Ave. Grows every time the city bus passes.