City Construction Projects
- Case Date:
- 4/13/2012
Hi, I ride my bike to work from Tamarron to North Walnut. Usually I take the bike route, including the Grimshaw Trail beside the train tracks, then cross the Bypass to Eastgate. Because of the construction on the Bypass, Eastgate is now closed, but there is no warning until you actually get there, which is very inconvenient. I also don't know how else I can get to my destination without either going all way down to 3rd, which would add about 10 minutes to my trip in each direction, or take my life into my hands by riding on 10th (I know, I know, the spandex brigade do this, but at 49 I've moved beyond the "live fast, die young, leave a good looking corpse" philosophy). What I would like to know, is how can I get to work safely if I can't go from the Grimshaw Trail over to Eastgate, and why do you not warn cyclists a little earlier (like say at Pete Ellis Drive and maybe Union Street on the other side) that Eastgate is closed so we don't waste even more time heading in that direction?
Thanks,
Gerry Matthews
City Construction Projects
500-520 S Walnut St
- Case Date:
- 4/18/2012
Regarding construction on South Walnut Street- at the intersection with second street, motorists are trying to go north from both lanes south of second into the single lane north of second street. These lanes need to be clearly marked during construction as typically the far left lane is for left turns only. Please make it easier for people to know where to go. Thanks.
City Construction Projects
1124 S College Mall RD
- Case Date:
- 10/16/2003
Ms. Black stated that she had heard the Weddle Bro's were only going to place sod on one side of the sidewalk. She was very concerned with this.
City Construction Projects
1101 N COLLEGE ST
- Case Date:
- 6/20/2003
Line torn out by contractor with backhoe.
City Construction Projects
2380 E Linden Hill DR
- Case Date:
- 6/17/2003
City Construction Projects
HARDY + FISCUS
- Case Date:
- 6/10/2003
new hydrant installed gravel needs to be repaired + backfield
City Construction Projects
401 N Morton ST
- Case Date:
- 6/10/2003
City Construction Projects
615 E Atwater AVE
- Case Date:
- 9/21/2001
Address approx. for entry. Street Dept. received a phone call from citizen regarding a street cut that has caved in on Atwater between fess and Henderson.
City Construction Projects
110 S Clark ST
- Case Date:
- 9/19/2001
Ms. Ritter stated that a street cut was done in front of her house and that the street cut has fallen in. She thought that the cut was made to repair a gas line, but said that the City made the cut?
City Construction Projects
2202 S Rockport RD
- Case Date:
- 4/18/2000
There is currently straw around the drainage ditch in front of 2202 S. Rockport. There is not any grass growing, it is all mud filled. There is now a cement stone on the property, left from the construction, and the complaintant can not mow around it. Please call Ms. Smith with any updates on the situation.