closed #166860
Scooters, Bike-share and Related Issues
3450 N Russell RD
- Case Date:
- 12/17/2018
I saw these scooters blocking access to an ADA automibile at Kirkwood and Dunn on Saturday.
I saw these scooters blocking access to an ADA automibile at Kirkwood and Dunn on Saturday.
Re: Case 184904 Attn. John Hewitt, Anna Killion-Hanson Update: The enclosure fences have been constructed just this week. The pooling water continues to be an issue. Thanks -
MISSED PICK-UP/TRASH TRASH IS PROPERLY TAGGED
This stop has been missed often and citizen is very upset. Please pick up ASAP and make sure it is collected each week.
faxed ddh/missed pick-up/yard waste
exceeds 35 gal
Hello - (Joe VanDeventer) Bringing to your attention the need to repave E. Longview Ave. Your department repaved a section of E. Longview in 2020 but the repaving stopped short of the Park Ridge residential neighborhood. This road needs repaving badly and I ask that you consider it on your repaving schedule ASAP. The photo above is an example granted from a water pooling issue that is still being resolved after some drain work, thanks! But the full length of E. Longview needs repaving. It is part of the E-W bike corridor, no sidewalks so lots of pedestrian traffic and bike traffic and a cut through by many avoiding Third St., and we have traffic calming bumps that will need reinstallation like you completed on Morningside Drive in 2020. Thank you for your consideration on this item. Steve Akers, living on E. Longview Ave. (32 years) Park Ridge Neighborhood Association, Secretary
Good Street Dept. staff - bringing your attention to a street in the Park Ridge neighborhood: East Longview Ave. The photo shows some deterioration of pavement. Granted a water issue that is slowly being corrected by City staff though still an issue due to pooling water. You can see two layers of pavement coming up. WE were hoping the repaving on Longview would extend into the neighborhood but it stopped along the entry by the apartments. Please address this issue with patching or even better, milling and repaving. We would really appreciate the attention. We respect your huge responsibility all over the City and also our little corner. Thank you for considering this item - it is a well traveled road by neighbors, a bike path route so many bikers, walkers, etc. And those avoiding Pete Ellis and Third St. to travel east.
Park Ridge neighborhood: Partnered with the traffic calming bumps are stakes with reflectors to bring driver's attention to the speed bumps. Nearly all of the stakes are missing the reflectors or the reflectors are damaged. Some of the pairs of stakes have one of the stakes missing like in front of my house. (A lawn service damaged it and removed it). So please survey and replace the missing reflectors and a couple of the missing stakes. The stakes with no reflectors appear dangerous. Like "Games of Thrones" dangerous. It was odd at the conclusion of the 2022 Morningside repaving, that the new version of traffic calming bumps was installed (thanks), but the stakes were ignored in terms of reflectors. We appreciate your attention on this item.
Street repaving request for East Longview Ave. Looking for the 2024 paving schedule, may not be released yet. East Longview needs paving through its full length within Park Ridge, from N. Glenwood West through to N. Glenwood east cross streets. This would accomplish: -Repaving needed overall - Install updated traffic calming bump design replacing current full width bumps. -Stripe the bike path lane stripe as it's part of the E-W bike greenway. And thanks! for placing the stop stripes at the 4-way stop E. Longview and N. Glenwood west by the park. We have a significant issue with motorists running that stop sign by the park entering the neighboorhood. We appreciate your good work.