Biking & Walking
801 S High ST
- Case Date:
- 9/8/2025
Twice now over the past 4 days, I have been walking in the middle of this crosswalk across High St, and a car coming the other way does not stop and drives around me, once when I had two children behind me. Both were white female drivers in their 60s/70s. Perhaps their vision does not see the white painted crosswalk area OR the yellow signs, but I'm thinking they are choosing to break the law. Mateo is a wonderful crossing guard, but he was not there either of these two times. This area needs to be repainted with high visibility/reflective paint, a blinking light on the signs, or at the very minimum, monitored by police for a while. Someone is going to get killed.
Biking & Walking
Washington St & Kirkwood Ave
- Case Date:
- 9/8/2025
Mounting bolts on north most bicycle rack have rusted through
Biking & Walking
101 W Kirkwood Ave # 104
- Case Date:
- 9/10/2025
West info sign on sidewalk needs repair - exposed nail/ sheet metal on south side of sign +/- 12” above sidewalk
Biking & Walking
Walnut & Grimes
- Case Date:
- 9/10/2025
The walk signal never shows a “safe to cross” signal on the NW corner (by Bloomington Pt and Wallpaper). Also, the “safe to walk”
Signal doesn’t work on the SW corner.
This is very dangerous at this high speed level intersection.
Biking & Walking
1101 E Miller DR
- Case Date:
- 8/30/2025
The north-west Conner of the metal plate sticks up enough that I could cause a bike rider a problem if they didn’t spot it…say at night.
Biking & Walking
3801 S Bainbridge DR
- Case Date:
- 9/1/2025
The sidewalk between these two houses has one step up and one step down. This increases the walking distance to the park if one is using a stroller, wheel chair, or bike, by a quarter mile if they live in the southern section of Sherwood oaks 2. Why not 2 ramps????
Biking & Walking
3609 E 3rd ST
- Case Date:
- 9/10/2025
There are uneven pavements and metal plates leftover on the bike lane after recent roadwork (possibly drilling) in the last two weeks between 3609 and 3617 E 3rd St (north side/westbound). This creates two big bumps on the bike lane. Not sure if the roadwork has been finished or it will resume soon.
Biking & Walking
320 W 8th St #113
- Case Date:
- 9/14/2025
The post for the bike/ped counter by the bike tunnel has broken off.
- Case Date:
- 9/21/2025
on the 7-line, between walnut and washington, theres gravel in the bike lane that came from the median strip landscaping. two separate properties on this block pose this problem. the landscapers recently refreshed the gravel, and when they did, they dropped some directly in the bike lane, and they also overflowed the planters that are continuing to drain into the bike lane. the gravel is largely hidden by leaves at the moment, which only exacerbates the danger. i must emphasize that this is a transportation safety issue, and if planning cannot resolve it, then engineering or PW must solve it. thanks! - greg
- Case Date:
- 9/21/2025
on the 7-line, between walnut and washington, theres gravel in the bike lane that came from the median strip landscaping. two separate properties on this block pose this problem. the landscapers recently refreshed the gravel, and when they did, they dropped some directly in the bike lane, and they also overflowed the planters that are continuing to drain into the bike lane. the gravel is largely hidden by leaves at the moment, which only exacerbates the danger. i must emphasize that this is a transportation safety issue, and if planning cannot resolve it, then engineering or PW must solve it. thanks! - greg