closed #23098
Blocked Street
2903 N Browncliff LN
- Case Date:
- 6/4/2007
Shrubs are growing out into the street again.
Shrubs are growing out into the street again.
There is a large tree branch hanging over the sidewalk in front of 2956 E. Amy Lane. Please call Jay Liebenow @332-1294 for an update.
Tree has fallen into the east west alley behind this property.
During the last storm part of a tree on this property fell across the sidewalk and has not been moved. Students are having to walk out in the street to get around it.
Cars parked in a no parking anytime zone halfway in the road
Down tree blocking road
There is a car that has been parking for the last six months on the North side of the street on Morningside Dr. at Smith Rd. It is a danger and menace to traffic entering and leaving Park Ridge East. Can this section of road be posted "No Parking"?
A tree limb and vines around a couple of wires leading to a phone pole. The vines are pulling the wires down. I am on home dialysis and my supplies come on a semi every other week. The truck almost pulled them down, since they are so low. Acutally that whole south side of the tree needs cut back, the City normally does that but hasn't this year. Thank you for your time.
There is a white sedan, Indiana license plate AEK322, illegally parked on West 4th & Waldron, partially blocking alley between two houses. It happens often.
This morning at approximately 8:05AM on October 18, 2018 a guy driving a delivery truck bed full of materials decides to stop at 10th and Rogers with no indication and causes a full stop for myself and a city block full of cars stuck. Rogers is a one way street at this point and because of the height of the truck, we cannot see if traffic is coming down the other way to pass around the truck. After sitting in my car for over 5 minutes and watching the truck driver run out to the construction site with no indication of when he's coming back, I rolled down my window to ask a nearby construction driver if someone can come direct traffic. I realize that's not his job but he didn't even dignify my question with a response. This is frustrating because despite all the delayed construction projects at the city, county and state level, the City has usually been pretty good about these types of things. If this is going to happen again, someone needs to be directing one way traffic flow. Also, I thought this 10th street corridor between Rogers and Morton was also supposed to be open by October 15th but now I see the information is gone from the city website.