closed #198819
Potholes, Other Street Repair
622 W 6th ST
- Case Date:
- 10/14/2024
This hole next to the street is about 3’ deep and has been there for at least three months. It needs to be fill
This hole next to the street is about 3’ deep and has been there for at least three months. It needs to be fill
Trash and recycling bins left out, after 24 hours post collections
Trash bins and recycling left out, aswell as the apartments across Dunn
Overflowing trash, two mattresses just thrown out
Recycling and trash bins left out post 24 hour collections
There is a new big pothole made by Gigabit on Eagleson at 2nd street. They didn’t come close to adequately filling the large hole they made. It is especially problematic at night as it can’t be seen.
Bloomington's traffic signal timing is, in general, inadequate. Traffic patterns in the city are highly variable, changing drastically as students arrive and leave with the university schedule and as new student housing is constructed. It would be wonderful if the city were to invest in a system which changes traffic signals in real time as a function of data collected from sensors at intersections. Surely there will be graduate students, postdocs, and faculty in the Luddy School eager to help out with a cool "smart city" project...
Vehicle has been left on the street with flat tires, 2 years out of registration, and the POS has not moved in over 2 years. License is SMURF 22.
There is a dangerous intersection that needs a crosswalk and a stop sign. Cars zoom past the intersection and it’s hard for students to feel safe going between the luddy building and the Ai building
Regarding case #198826: Google Maps for "015F" has the address listed as 622 E. 11th. Easy enough to find.