closed #205006
Potholes, Other Street Repair
Henderson & Graham
- Case Date:
- 8/18/2025
Deep pothole in westbound lane of Graham Dr near Henderson
Deep pothole in westbound lane of Graham Dr near Henderson
On the south east corner of the intersection of Henderson St. and Brenda Ln the sidewalks around the bus stop have some very low hanging tree branches that obstruct clear passage along the sidewalk. It would be great to see this get trimmed back.
Ground has been dug up and left unfinished for quite awhile. I’m not sure what is supposed to be happening at the location but there is a big ditch just sitting there. Cones have fallen over. A mess on the other side of the sidewalk also.
There are 2 holes located in the grass area between the sidewalk and Heather on the north side of the street. I would like them to be filled in for safety. Both are before you get to Laurel Ct. Thank you, Kaye Beavers, Peppergrass HOA, landscaping
Pothole
Crumbling curb at Kirkwood/Dunn on the Greetings side.
People's Park grass and weed overgrowth throughout the park.
When driving north on Harold St to 10th street there is a large shrub, on private property at 404 10th St , that blocks the view for the turn onto 10th. My family has now had several close traffic wrecks at that intersection. Can that shrub be cut back or removed by either owner or city? Thanks
The alley that runs north and south between Hunter and 2nd St and is between Woodlawn and Hawthorne is the main entry to Harmony School's parking lot. It only allowed me to attach one picture, or could be my lack of tech skills, lol. The one pic included is standing about halfway in the alley and looking south to the cross street, 2nd St. You can see a few potholes. Midway thru the alley is our parking lot entry point. There are some potholes in this middle area as well. Looking to the north to the cross street, Hunter, there are more potholes all of these are almost to Hunter. School ends this week but we have 5-6 nights a week of rental groups that use our school on a regular basis, even in the summer. Harmony staff will be going in and out all summer as well. During the summer we bring in numerous contractors and vendors to complete work that can't be done in the classroom areas during the school year. It will be a busy place. Any attention you could give this alleyway would be appreciated by anyone that drives into Harmony. Thank you and don't hesitate to contact me with any questions or heads up if a crew is coming.
The road needs repaved at the end of Habitat Street where it connects to Hopewell Street. Also, big ruts and ditches are being made on the east side of the road on Hopewell.