closed #120942
City Construction Projects
S ADAMS ST
- Case Date:
- 11/7/1996
STREET CAVING IN WHERE WORK WAS DONE
STREET CAVING IN WHERE WORK WAS DONE
Ms. Borhan said the City tore up her driveway approximately a year ago and promised to return landscaping and everything back to "as was". She has not had any landscaping done and there is mud at the driveway.
Says promised traffic calming devices have not been installed. Were told they'd go in right away (6th St). Says City Landscaper told him no one discussed watering of greenery with him. Says City departments aren't coordinating and work isn't getting done.
Sidewalk on Maple from 5th to 6th was recently replaced. While it needed to be replaced, this was a historic sidewalk as are many on the west side. Policy should be developed to preserve historic sidewalks in original condition when repairing/replacing.
She's at Walnut & Wylie. Why hasn't anything been done about Wylie Street in a month or more? She's losing business and Wylie Street residents are using her parking lot.
Mr. Hoover called to complain about the recent construction on Tapp Road. He believes the construction caused his driveway to crack. I referred Mr. Hoover to Risk Management Department.
1200-1300 S.MADISON (FROM GRIMES TO HILLSIDE) REYNOLDS CONSTRUCTION DOING WORK FOR UTILITIES DEPT. EXCESS DIRT/SAND NEEDS TO BE SWEPT UP.
recent cut--cut repair is very rough and deteriorating
Wants information regarding proposed development at the intersection of S. Rogers and Rockport Road. Also, upset that these roads and sidewalks may be widened unnecssarily and the elderly do not need extra taxes. The speed limit on rogers should be lowered too.
Tree of Life has made a road cut to Knapp Road without the proper approvals. The cut was made last weekend.