City Construction Projects
1116 S College Mall RD
- Case Date:
- 10/20/2003
Desires a cleanout for the slotted drain in the driveway.
Desires a tree well for the gum tree on north side of drive.
Desires drainage improvements on the southeast side.
Desires opening in the median.
City Construction Projects
1924 E Marilyn DR
- Case Date:
- 4/5/2011
Received email from Leland Rogers concerned about the timing of the Marilyn Drive Sidewalk Project.
City Construction Projects
317 E Allen ST
- Case Date:
- 5/19/2021
The bolts sticking out of the speed bump are a hazard.
City Construction Projects
409 E Allen ST
- Case Date:
- 5/19/2021
I think this sign says children at play but it's so faded and so blocked by honeysuckle that you can't see it. There are constantly kids in the street in the Greenway and several more of these signs would be appropriate.
City Construction Projects
1200 S Rogers ST
- Case Date:
- 7/28/2021
The drain in the back corner of the dermatologist parking lot. The drain is missing 2 rungs. My wife fell when she accidentally stepped in the hole.
City Construction Projects
1427 W Allen ST
- Case Date:
- 1/1/2022
Please have public streetlights installed at the entrance of Whittington Commons on Allen Street. It is very dark, and it is difficult to see entrance. I know this is a private road within WC, but Allen is a public street and it is a hazard to not have streetlights at entrance given the public sidewalk crosses the entrance. Light it up!
City Construction Projects
2225 S High ST
- Case Date:
- 4/23/2022
A new walkway and rail was installed in 2020 along Rogers Road to make it safer for children to walk to school. Shortly after it was completed a tree fell and damaged the railing for a bridge which is about 15 feet above Jackson Creek. The tree was removed but the railing was not repaired, it was simply wrapped with caution tape. This may have been adequate temporarily but it has been left this way for over a year. This is unsafe and an eyesore. Can you please arrange to have this properly repaired?
City Construction Projects
305 S Lincoln ST
- Case Date:
- 6/24/2022
East-West alley between Girls and Boys Club and the building to the north needs repaved. It is in really bad shape and dangerous.It was never repaired after work was done in it. Thank you.
City Construction Projects
300 E Smith AVE
- Case Date:
- 8/4/2022
A contractor (possibly PCT?) installing a utility pole at NW corner of Lincoln and Smith is blocking the alley and blocking parking on private property.
City Construction Projects
925 E Atwater AVE
- Case Date:
- 8/13/2022
East 914 Atwater utility cut needs filled in