City Construction Projects
3549 N Hackberry ST
- Case Date:
- 5/18/2025
Our neighborhood recently had our sidewalks updated to be ADA acceptable and with that our driveway and sidewalk by our house was tore up. The photo above is a spot in the sidewalk they did not fill with concrete and is a hazard to anyone walking. They also left big gaps in our yard where they fixed the sidewalks which is another hazard. If we could have someone come out and look and fix this issue so no one gets hurt.
City Construction Projects
414 E Cottage Grove AVE
- Case Date:
- 5/26/2025
Cavity forming alongside water meter in ROW close to SW corner of lot.
City Construction Projects
2012 E Hillside DR
- Case Date:
- 5/27/2025
The construction contractor has placed the Road Closed barricades in two of the three lanes on High St. at the Hillside intersection. This is impeding the flow of traffic and is going to cause an accident. Once three cars fill the left turn lane, High St. is effectively blocked to North/South travel. There is now only more traffic going North on High St. with the roundabout closure.
Please have the barricades removed or placed to the sides of the road. If someone cannot read the road closure signage properly, they will have to pay the price once they reach the closed roundabout.
City Construction Projects
2012 E Hillside DR
- Case Date:
- 5/27/2025
Since Roger Street is closed, all people who live off of high Street have to take high Street up to Morse Pike/Hillside. With these signs now up on both sides, it is down to one lane for no reason. There's no reason to have the northbound traffic on high Street blocked.
City Construction Projects
Liberty Dr
- Case Date:
- 7/11/2025
Why they doing road work on liberty drive
City Construction Projects
Liberty Dr
- Case Date:
- 7/14/2025
when liberty dr by aidi roadwork be done
City Construction Projects
2600 S Rogers ST
- Case Date:
- 7/16/2025
Wondering if you could tell me what the utility digging in the 2600 block of South Rogers is for. They are unmarked trucks and we received no notice of work in the area. Holes in several yards.
City Construction Projects
916 N Lindbergh DR
- Case Date:
- 7/19/2025
The courtyard at the 900 block of North Lindbergh drive has always flooded. The situation may have just been exacerbated even after construction is complete unless proper drainage is included before concrete is poured. I also don't really want motorcycles and motor scooters revving up all hours of the day and night outside of my apartment, and hope that this will only be for bicycles and non-motored vehicles. We now have what may become a huge mosquito breeding pool in our front yard.
City Construction Projects
916 N Lindbergh DR
- Case Date:
- 7/20/2025
I was told by Rhonda at Bloomington housing authority that the construction project taking place in our courtyard on Lindbergh will be a covered structure for bicycle parking. My concern is if motorized vehicles like scooters and motorcycles park there, the c shape created by the three tall apartment buildings surrounding the courtyard already create an amphitheater that echoes every sound. The noise from bikes that people built themselves around here are loud enough, but if they're revving them up in our courtyard and if there's an awning, and we're in this low level across the street from a hill, please consider how loud this will be in our apartments where there's gaps around our front door. I work full-time and need my sleep at night and to rest on the weekends. There are small children living here who need to be in bed at night. Please consider including signs that there will be no motorcycles or motor scooters parking here. I think bicycle parking is wonderful and I am enthusiastic about having bicycle parking. In a previous report, I mentioned the issue that has already been present of flooding before this construction began, and tomorrow, there is a flash flood warning for all of Central Indiana.
City Construction Projects
901 W 1st ST
- Case Date:
- 6/30/2025
Cable hanging down on sidewalk near corner of W. 1st and WylieEuclid. Duke came and said not theirs prob phone or internet cable. Checked with one internet company (Comcast) and 14 day wait. The cable is on the sidewalk and a hazard in many ways. It seems to be possible related to the movement and placement of construction poles during demos and renovations to the East.