uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (120262)

closed #193199

Utility Construction Projects

3611 S Bainbridge DR

Case Date:
8/29/2024

ATT has not repaired downed utility lines since the storm several months ago. Who is responsible for making sure that ATT takes care of their lines? (I am not an ATT customer)

closed #193323

Utility Construction Projects

819 N Indiana Ave

Case Date:
9/3/2024

Fiber optic installation created some cylindrical holes in the concrete and asphalt about 6" in diameter in various locations. At this intersection, there is one that was apparently refilled with gravel, but another was left open and a stepping hazard. It is on the north part of the intersection, just north of where 11th crosses and closer to the east side of the street than the west. We found a concrete core by the side of the road that likely came out of the hole originally so we placed it back in the hole, but it sunk down a ways because it was unsupported beneath and now it needs to be topped off with gravel or the core should be removed and the entire hole filled with gravel.

closed #193442

Utility Construction Projects

3629 S Bainbridge DR

Case Date:
9/9/2024

Cable of some kind of down across out back yard and neighbors'. Has been down since the big storm a couple months ago. It is not a power line.

closed #198642

Utility Construction Projects

Spicewood Ln

Case Date:
10/4/2024

There is a utility project happening in the Spicewood subdivision. The yard repair after digging up holes is not up to standard. Instead of smoothing the yard out, big clumps of dirt are being left with straw thrown in them. Yards need to be left in the same or better condition than they were before the project began. The dirt should be smooth and tamped down, excavator tracks in the yards need to be repaired. Please make sure the remaining properties are repaired up to standard and left in the same or better condition prior to the project.

closed #198812

Utility Construction Projects

622 W 6th ST

Case Date:
10/14/2024

This hole next to the street is about 3’ deep and has been there for at least three months. It needs to be filled

closed #181002

Utility Construction Projects

3304 E Winston ST

Case Date:
8/12/2022

AT&T left large holes in ground after installing high speed internet.

closed #181095

Utility Construction Projects

2200 E Moores Pike, Bloomington, IN 47401, USA

Case Date:
8/18/2022

AT&T lines need to be resupported. They were sagging and a truck snagged them. It broke a power pole that Duke replaced but the AT&T lines are just temporarily tied up. The whole line is a mess from High Street east with broken poles and sagging lines.

closed #181345

Utility Construction Projects

Case Date:
9/4/2022

This pedestrian hazard has existed for quite a while in the tree plot at 1112 E First St. It doesn't look official but shouldn't someone have filled it in? Thanks!

closed #181786

Utility Construction Projects

1450 W Lockview ST

Case Date:
10/11/2022

A private utility company cut a large hole in my driveway without permission. After removing that portion of my driveway they dug out what appears to be an area 3 feet deep and at least 2-3 feet wide just underneath my driveway. A piece of plywood was placed on top and is not secure. I’m not only afraid that someone will fall I. The hole, but also that an entire portion of my driveway will collapse into the ground. I have attempted to contact the private company (AT&T) and while they have opened a claim, I have yet to hear back from them in regards to this public safety concern and also how they plan to fix my driveway. My home sits on a very busy and trafficked corner in The Highlands. Lots of pets, small children, families walking all day. In addition, I can already see that area has shifted and sunk.

closed #182014

Utility Construction Projects

2104 S Azalea LN

Case Date:
11/7/2022

As you may know, the cable installers are back at work in the Winslow Farms neighborhood (after leaving it uncompleted for well over a year), and they are inflicting significant damage on properties. We came home to find piles of dirt and rock, a new ground box not flush with the ground, and significant damage far up into our lawn from their boring machine--way beyond the utility easement. Further, their work is damaging sidewalks-both cracking the concrete and pushing it up to create tripping hazards. They were rude to our neighbor who confronted them about these issues. Further, they indicated that they were going to trench back between the houses on Azalea, across the conservancy area, to Bayberry. I would like to talk with someone from the city about this excessive damage, how far back onto our property they are allowed to bring their construction equipment before it becomes trespassing, what is an acceptable expectation/timeline for repairs to our lawn, and what sort of plans they may have for trenching back between our houses and across a conservancy area. They posted announcements of their work AFTER they began and a neighbor complained. Please contact me when you can to discuss the ongoing damage this company is doing to our properties and neighborhood.