East Pepperridge Drive Water Project
East Pepperridge Drive, between East Heather Drive and East Heather Drive
August 27, 2018 07:30 am to 15:30 pm October 12, 2018
The City of Bloomington Utilities has scheduled a water line project, weather permitting. Signage will be in place.
Utilities
LINESTRING(-86.52501917779351 39.12419560255995,-86.52441836297417 39.12383770334023,-86.52379609048272 39.12387515799492,-86.52271784245873 39.124595115820114,-86.52254081666374 39.1248364873168,-86.52250863015557 39.1253774893911,-86.52266419827843 39.1256854425622,-86.52295924127006 39.12598090987973)