Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
Poplars Redevelopment 400 E 7th St November 22, 2025 to June 18, 2026
Phase 3 of 4 of the Poplars redevelopment. Closures to be used for construction deliveries and material movement.
This phase includes:
Single day closure on the east side of Grant for scaffolding installation (11/13/25) and single day (TBD) for removal.
Bike lane closure from 11/22/25 to 3/2/26.
Closures of the southern sidewalk along E 7th and the east/west alley on the southern side of the property from 11/22/25 to June 18th, 2026.
External Project
LINESTRING(-86.52972234187298 39.16804160976628,-86.52835108743676 39.168028076294235)
Construction for 115 E Kirkwood Lofts 115 E Kirkwood Ave January 28, 2026 to July 28, 2027
Genesis Construction is requesting a pedestrian diversion and intermittent closures, traffic lane shifts and intermittent lane closures, alley closures, and metered parking reservations associated with the project at 115 E Kirkwood Avenue. The request impacts the northern sidewalk on E Kirkwood, the north–south and east–west alleys surrounding 115 E Kirkwood, the east–west travel lanes on E Kirkwood, and the metered parking spaces along the north and south side of E Kirkwood.
External Project
LINESTRING(-86.53245771844563 39.16705931743067,-86.53296069631311 39.16706282003534,-86.53295467260338 39.16667869420775)
Bloomington Convention Center Project Lane Restriction 302 S College Ave February 13, 2026 to June 26, 2026
Immediately following phase 2 completion, a lane closure of the eastern southbound lane of College Ave is being requested. This request is to accommodate placement of pedestrian diversion for curb and sidewalk demolition and reconstruction. The traffic control would be in place from February 13th, 2026 through June 26th, 2026
External Project
LINESTRING(-86.53487655624961 39.164488185161105,-86.53489244558577 39.16354881125994)
Poplar Redevelopment 400 E 7th St February 23, 2026 to July 27, 2026
Sidewalk closures, metered parking reservations, and alley closures surrounding the former Poplars Building located at 400 E 7th Street. The request includes the eastern sidewalk and adjacent parking lanes on N Dunn Street, the southern sidewalk on E 7th Street, and the east/west alley between E 6th Street and E 7th Street.
The requested closures are to accommodate completion of exterior façade work, including masonry cleaning and sealing, followed by sidewalk reconstruction and perimeter landscaping along the east side of the Poplars Building on Dunn Street.
Traffic control on N Dunn Street is proposed to be in place from February 23, 2026, through July 17, 2026. Traffic control on E 7th Street and within the east/west alley between E 6th Street and E 7th Street will remain in place through July 27, 2026, to support final site concrete work and landscaping associated with project completion. F.A. Wilhelm has supplied maintenance of traffic plans for all prop
External Project
LINESTRING(-86.52934633192137 39.168023490778666,-86.52876028302248 39.16801791578442)
Arlington Multifamily Project Lane Closures 1210 W Arlington Rd March 2, 2026 to June 16, 2026
Mayer Najem is requesting lane shifts on W Arlington Rd adjacent to as part of the project located at 1320 W Arlington Rd. This request is for Sanitary sewer and storm upgrades, tapping water for the site, and transportation infrastructure updates totaling 7012 sq ft of non pavement and 7670 sq ft of pavement excavations. The traffic control is planned to be in place starting in early spring, currently estimated to be from March 2nd, 2026 through June 16th, 2025.
Mayer Najem has supplied maintenance of traffic plans for all work. As a condition of the issuance of the ROW permit they will also be required to post signage notifying the public about the lane shifts at least 3 weeks prior to closure implementation.
External Project
LINESTRING(-86.547514919906 39.17939904581016,-86.54805384529433 39.179662415790176,-86.54835845521869 39.179889457965004,-86.54879193846948 39.1802981323784,-86.5490848327994 39.18073404869537,-86.54922542261407 39.180897515881156)
Arlington Multifamily Utility Work 1210 W Arlington March 9, 2026 to June 16, 2026
Mayer Najem is requesting lane shifts on W Arlington Rd adjacent to as part of the project located at 1320 W Arlington Rd. This request is for Sanitary sewer and storm upgrades, tapping water for the site, and transportation infrastructure updates totaling 7012 sq ft of non pavement and 7670 sq ft of pavement excavations. The traffic control is planned to be in place starting in early spring, currently estimated to be from March 2nd, 2026 through June 16th, 2025.
Engineering
LINESTRING(-86.54747272130943 39.179383055603836,-86.54803768028326 39.179662430757844,-86.54853445455336 39.18009281733603,-86.54874874933653 39.180289133145806)
2026 Downtown Alley Project Portions of the alley between College and Walnut spanning from 7th to 11th April 27, 2026 to May 31, 2026
Portions of the alley between College and Walnut spanning from 7th to 11th will be closed intermittently for resurfacing as well as other improvements
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53422310435563 39.16908908812425,-86.53423469094652 39.16945976364744),LINESTRING(-86.53422303305354 39.169575269400724,-86.53421354987455 39.17045008319752),LINESTRING(-86.5341873463536 39.17176251841758,-86.53418330106125 39.1721072951365,-86.53417890158747 39.17248225650823,-86.53417022127073 39.17322206263546),LINESTRING(-86.53418950989536 39.17210733891983,-86.53470880295583 39.17209943374658),LINESTRING(-86.534181307079 39.17248228190087,-86.5347171620767 39.17247842355172))
North Jefferson Street North Jefferson Street; 8th to 10th April 27, 2026 to June 30, 2026
Intermittent lane closures will take place for the duration of the project to accommodate storm water improvements and Sidewalk installation.
Engineering
LINESTRING(-86.50719158491388 39.17130354710221,-86.507172758117 39.16955204365513)
ROW2026-02-2297 S Sare Road from E Rogers to Hunters Glen May 1, 2026 to June 30, 2026
Single lane restrictions and sidewalk closures
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.49652821687987 39.13627799335504,-86.49661600011642 39.13685674575609),LINESTRING(-86.49661600011643 39.13687376781348,-86.49663794592556 39.13771635451258,-86.49657210849817 39.138499355335256,-86.49659405430731 39.14008235213879),LINESTRING(-86.49659405430731 39.140065330857084,-86.49661600011645 39.14232912519927))
Patterson, Grimes and Rogers pavement improvement project South Patterson Drive; Rogers to 3rd West Patterson Drive; Rogers to Morton West Grimes Lane; Morton to Walnut South Rogers Street; west Patterson to1st Street South Rogers Street; W 2nd Street to W 3rd Street May 11, 2026 to October 31, 2026
Intermittent lane Closures throughout the project area
Road closures on South Rogers Street
FINAL DATES TO BE DETERMINED and InRoads to be updated at that time
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53869085287643 39.16149370607707,-86.53864511829607 39.16450784174452),LINESTRING(-86.53867560801629 39.15934236163693,-86.53870609773645 39.15389278273034),LINESTRING(-86.53869085287634 39.153786387618425,-86.53806581361148 39.153786387618425,-86.53785238556985 39.153739100850316,-86.53695293882285 39.153408092584215,-86.53675475564131 39.153384449077066,-86.53385823221883 39.153348983801436),LINESTRING(-86.53884330147753 39.153786387618425,-86.54129772395659 39.153845496033796,-86.54169409031965 39.15389278273034,-86.54195325294167 39.15405828591804,-86.5422276604238 39.15431836156938,-86.5424868230458 39.15468483017386,-86.5431423520309 39.155122225687194,-86.5432948006321 39.15527590454636,-86.54334053521245 39.155630546786654,-86.54337102493268 39.15589061662678,-86.54660293527776 39.158881350697726,-86.54840182877173 39.16067809422458,-86.5486305016735 39.16089086344556,-86.54914882691754 39.161399142868646,-86.55049037460795 39.16268755565065,-86.55123737275376 39.163455863967755,-86.55195388117932 39.164235983826586),LINESTRING(-86.55193863631918 39.16433054322158,-86.5516947185573 39.164342363136996))
2026 Kirkwood Brick Paver Repair Project Kirkwood b/t Indiana and Dunn May 11, 2026 to May 31, 2026
2026 Kirkwood Brick Paver Repair Project
Public Works
LINESTRING(-86.52700032039083 39.166520058681954,-86.52815935243942 39.166529424041414)
ROW2026-04-2450 910 South Adams Street May 11, 2026 to May 25, 2026
lane restriction, 2 days between listed dates
Engineering
LINESTRING(-86.55057763162391 39.15582934542621,-86.5505548328473 39.15582934542621,-86.5505575150563 39.155685834293166,-86.55058031383294 39.15568063460901,-86.5505789727284 39.1558283054915)
West Kirkwood Ave safety improvements West Kirkwood Avenue; North Pine street to South Rogers Street May 11, 2026 to October 31, 2026
West Kirkwood Avenue will have intermittent lane closures for the duration of the project as well as 10 days of closure FINAL DATES TO BE DETERMINED and InRoads to be updated at that time
Engineering
LINESTRING(-86.54941011754993 39.166728518060665,-86.54941011754993 39.166728518060665,-86.53889067543408 39.16661879811224)
ROW2026-02-2288 1347 E Bradshire Street May 15, 2026 to May 30, 2026
1-2 day Lane restriction
Engineering
LINESTRING(-86.51593333546191 39.135956936316205,-86.51654887604005 39.13596413396911,-86.51654887604005 39.13598692653184,-86.51593333546191 39.13597972888124,-86.51593333546191 39.135959335533926)
ROW2026-02-2266 Dunn Street Just South of the intersection with 6th Street May 18, 2026 to June 1, 2026
Lane Closure-Dunn Street Just South of the intersection with 6th Street
Engineering
LINESTRING(-86.52830445333508 39.167510316603284,-86.52829908891705 39.167312761541524,-86.52826422019986 39.16731068201162,-86.5282709257224 39.16751343588925,-86.5283071355441 39.16751135636531)
North Union Street 7th street to 10th street May 18, 2026 to June 1, 2026
A full Road closure for the installation of a raised crosswalk and new storm structure.
Detour will be East 7th street, North Jefferson Street and East 10th Street.
Engineering
LINESTRING(-86.50942855862212 39.1682802786076,-86.50944968575389 39.17150701419146)
Milling and Resurfacing on E Clover Ln E Clover Ln from E Blue Ridge Dr to N Dunn St May 18, 2026 06:00 am to 16:00 pm May 28, 2026
Lane Restrictions and No Parking on E Clover Ln from E Blue Ridge Dr to N Dunn St for milling and resurfacing.
Street
LINESTRING(-86.53184044531636 39.19585921376762,-86.53177266665799 39.19567244803119,-86.53172748088572 39.195462335984274,-86.53163710934119 39.195269732722664,-86.53145636625216 39.195223040943375,-86.53076351774415 39.19522887741749,-86.53011585500842 39.19533393386857,-86.52964140439967 39.195491518250606,-86.5290916441705 39.19575415810198,-86.52870003414424 39.195917577958454,-86.52857953875154 39.19594092362121)
Milling and Resurfacing on W 6th St W 6th St from N Rogers St to N College Ave May 18, 2026 06:00 am to 18:00 pm May 22, 2026
No Parking and Lane Restrictions for milling and resurfacing W 6th St from N Rogers St to N College Ave. This will be completed by E&B Paving.
Street
LINESTRING(-86.53867252858575 39.167608744444436,-86.5349179538741 39.16756667899753)
Milling and Resurfacing on W 7th St W 7th St from N Rogers St to N Morton St May 18, 2026 06:00 am to 18:00 pm May 22, 2026
No Parking and Lane Restrictions for milling and resurfacing W 7th St from N Rogers St to N Morton St. This will be completed by E&B Paving.
Street
LINESTRING(-86.53865085720875 39.16859424134472,-86.53616214458206 39.16857315417187)
Milling and Resurfacing on N Blue Ridge Ct N Blue Ridge Ct from E Clover Ln to the Dead End May 18, 2026 06:00 am to 16:00 pm May 28, 2026
Lane Restrictions and No Parking on N Blue Ridge Ct from E Ramble Rd to the Dead End for milling and resurfacing.
Street
LINESTRING(-86.53157243056752 39.19520161421653,-86.5318149047532 39.194663255722645,-86.5318607782478 39.19448549493674,-86.53184767153506 39.19430265480207,-86.53178213797136 39.1941858400225,-86.53167073091306 39.19411981419162,-86.53140204330191 39.19411473527899,-86.53115956911621 39.1941604454795,-86.53097607513786 39.19420615565025,-86.53087777479229 39.19422139236727,-86.53056321368653 39.19423662908102)
Axis Fiber Relocation Project S High Street from E 3rd St to Rock Creek Dr May 18, 2026 to June 12, 2026
Three weeks of lane and sidewalk closures along S High Street from E 3rd St to Rock Creek Dr to relocate approximately 4200 ln ft of fiber conduit and hand holes. This project will take us 10-15 days to complete.
External Project
LINESTRING(-86.50852322030218 39.16410991686445,-86.5083404197909 39.146856511235995)
Milling and Resurfacing on S Henderson St S Henderson St from E Hillside Dr to E 3rd St May 20, 2026 to May 29, 2026
No Parking and Lane Restrictions for milling and resurfacing S Henderson St from E Hillside Dr to E 3rd St. This will be completed by E&B Paving.
Street
LINESTRING(-86.52694883489212 39.15068296304716,-86.52701695875471 39.155582705659185,-86.52720429937683 39.16049531257252,-86.52728945420508 39.163241997025494,-86.52722133034248 39.163506095648074,-86.52696586585778 39.16388903688966,-86.52691477296084 39.16424556651634)
Centerpoint Energy Gas Main Relocation 2nd and Morton May 20, 2026 to May 27, 2026
Lane closures during normal construction hours and overnight road closures on West 2nd Street at South morton Street for gas main relocation. Trench cut running north/south on Morton across 2nd with a tap pit on each end that measures 3' x 115' x 5'. 1-3 days of overnight work to occur between May 20-27, 2026.
External Project
LINESTRING(-86.53666335108284 39.16140538881646,-86.53587977918097 39.16140175074344)
Centerpoint Energy Gas Main Relocation 2nd and Morton May 20, 2026 to May 27, 2026
Lane closures during normal construction hours and overnight road closures on West 2nd Street at South morton Street for gas main relocation. Trench cut running north/south on Morton across 2nd with a tap pit on each end that measures 3' x 115' x 5'. 1-3 days of overnight work to occur between May 20-27, 2026.
External Project
LINESTRING(-86.53641056281343 39.16140345591381,-86.53618973267234 39.16140130213918)
ROW2026-03-2393 1009 W Allen Street May 21, 2026 to June 11, 2026
10 days of lane closure between listed dates
Engineering
LINESTRING(-86.54422811005446 39.15344293428984,-86.54424889154733 39.15345367773625,-86.54434587184734 39.15339727462441,-86.54432162677234 39.153386531169474,-86.54423503721874 39.153441591358956)