Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
Crown Castle Small Cell Tower Work 1314 N Eagleson Ave September 8, 2025 to March 8, 2026
SC-IN E 17th St 523288_0167
Location: In the ROW at the corner of E 17th St and the private driveway.
Type of Work: Replace existing 33'-6" AGL metal pole with new 39'-1" AGLE (38'-9" total) Valmont metal pole, installing new telecommunications equipment. See attached drawing for more details and scope of work.
Extent of closure: Partial lane closure, partial sidewalk closure. See page 19 of submitted drawing. Areas will be reopened for the evening once the crew completes for the day.
Expected date and/or duration: 9/8/2025-3/8/2026
Work is expected to take about 3 days to complete.
External Project
LINESTRING(-86.51215945787904 39.178809908271745,-86.51141249889902 39.17880550505484)
Poplars Redevelopment 400 E 7th St November 22, 2025 to March 2, 2026
Phase 3 of 4 of the Poplars redevelopment. Closures to be used for construction deliveries and material movement.
This phase includes:
Single day closure on the east side of Grant for scaffolding installation (11/13/25) and single day (TBD) for removal.
Bike lane closure from 11/22/25 to 3/2/26.
Closures of the southern sidewalk along E 7th and the east/west alley on the southern side of the property from 11/22/25 to June 18th, 2026.
External Project
LINESTRING(-86.52971250992954 39.16849483132833,-86.5288075170272 39.16849314470889,-86.52871179662408 39.1684779651323,-86.52855733870085 39.16847627851246,-86.5284289863421 39.168498204567044,-86.5283463187212 39.168498204567044)
Poplars Redevelopment 400 E 7th St November 22, 2025 to June 18, 2026
Phase 3 of 4 of the Poplars redevelopment. Closures to be used for construction deliveries and material movement.
This phase includes:
Single day closure on the east side of Grant for scaffolding installation (11/13/25) and single day (TBD) for removal.
Bike lane closure from 11/22/25 to 3/2/26.
Closures of the southern sidewalk along E 7th and the east/west alley on the southern side of the property from 11/22/25 to June 18th, 2026.
External Project
LINESTRING(-86.52972234187298 39.16804160976628,-86.52835108743676 39.168028076294235)
ROW2025-11-2135 Indiana AVE from Cottage Grove to 13th January 24, 2026 to February 12, 2026
Closures on Indiana Ave for work on poles
Engineering
LINESTRING(-86.52693332190438 39.172647363872784,-86.5269547795765 39.17339177516254,-86.52695299154631 39.173440293305134,-86.5269470823199 39.17387264720841,-86.52694350609578 39.1743342582989,-86.52695244673798 39.174963597001295,-86.52698820947028 39.174962210819984,-86.5269917856125 39.17353228770159,-86.5269917856125 39.173390892032586,-86.5269703279404 39.172642321988945,-86.52693277701418 39.17264370821596)
ROW2026-01-2204 717 S Henderson January 26, 2026 to February 9, 2026
Alley closures for electric work
Engineering
LINESTRING(-86.52651812657633 39.15992603556103,-86.52651812657633 39.15980125055415,-86.52664150819105 39.159802637066036,-86.52663971999712 39.15977213398895,-86.52651991460655 39.15977352053315,-86.52651991460655 39.15969587636536,-86.52648594006817 39.15969587636536,-86.52648594006817 39.15977629352619,-86.52636792287151 39.15977213398895,-86.52637149909563 39.159802637066036,-86.52648772809836 39.159802637066036,-86.52648772809836 39.15992326257387,-86.52651633838244 39.15992326257387)
Bloomington Convention Center Skywalk Installation 302 S College Ave January 26, 2026 to February 9, 2026
Phase 2:
Sidewalk and road closures on S College, south of 3rd St as part of the project located at location. This request is to accommodate installation of the connector or “skybridge” . The traffic control would be in place from January 26th, 2026 through February 12, 2026 with a detour for vehicular traffic to Rogers St and a pedestrian detour to Walnut St and 2nd St
Phase 3:
Immediately following phase 2 completion, a lane closure of the eastern southbound lane of College Ave is being requested. This request is to accommodate placement of pedestrian diversion for curb and sidewalk demolition and reconstruction. The traffic control would be in place from February 13th, 2026 through June 26th, 2026
External Project
LINESTRING(-86.53488292459176 39.1635679969427,-86.53488292459176 39.164478104245234)
ROW2025-11-2138 1000 S. Ballantine Rd January 29, 2026 to February 2, 2026
Duke- pole work and boring
Engineering
LINESTRING(-86.51909622323824 39.16421599146372,-86.51911946910427 39.16421876428171,-86.51911946910427 39.164048235091514,-86.51908728259612 39.164048235091514,-86.51909443504434 39.16421737785686)