Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53517957550848 39.155618114825785,-86.53479233158195 39.15561291513657)
Construction for 115 E Kirkwood Lofts 115 E Kirkwood Ave January 28, 2026 to July 28, 2027
Genesis Construction is requesting a pedestrian diversion and intermittent closures, traffic lane shifts and intermittent lane closures, alley closures, and metered parking reservations associated with the project at 115 E Kirkwood Avenue. The request impacts the northern sidewalk on E Kirkwood, the north–south and east–west alleys surrounding 115 E Kirkwood, the east–west travel lanes on E Kirkwood, and the metered parking spaces along the north and south side of E Kirkwood.
External Project
LINESTRING(-86.53245771844563 39.16705931743067,-86.53296069631311 39.16706282003534,-86.53295467260338 39.16667869420775)
Poplar Redevelopment 400 E 7th St February 23, 2026 to July 27, 2026
Sidewalk closures, metered parking reservations, and alley closures surrounding the former Poplars Building located at 400 E 7th Street. The request includes the eastern sidewalk and adjacent parking lanes on N Dunn Street, the southern sidewalk on E 7th Street, and the east/west alley between E 6th Street and E 7th Street.
The requested closures are to accommodate completion of exterior façade work, including masonry cleaning and sealing, followed by sidewalk reconstruction and perimeter landscaping along the east side of the Poplars Building on Dunn Street.
Traffic control on N Dunn Street is proposed to be in place from February 23, 2026, through July 17, 2026. Traffic control on E 7th Street and within the east/west alley between E 6th Street and E 7th Street will remain in place through July 27, 2026, to support final site concrete work and landscaping associated with project completion. F.A. Wilhelm has supplied maintenance of traffic plans for all prop
External Project
LINESTRING(-86.52934633192137 39.168023490778666,-86.52876028302248 39.16801791578442)
Patterson, Grimes and Rogers pavement improvement project South Patterson Drive; Rogers to 3rd West Patterson Drive; Rogers to Morton West Grimes Lane; Morton to Walnut South Rogers Street; west Patterson to1st Street South Rogers Street; W 2nd Street to W 3rd Street May 11, 2026 to October 31, 2026
Intermittent lane Closures throughout the project area
Road closures on South Rogers Street
FINAL DATES TO BE DETERMINED and InRoads to be updated at that time
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53869085287643 39.16149370607707,-86.53864511829607 39.16450784174452),LINESTRING(-86.53867560801629 39.15934236163693,-86.53870609773645 39.15389278273034),LINESTRING(-86.53869085287634 39.153786387618425,-86.53806581361148 39.153786387618425,-86.53785238556985 39.153739100850316,-86.53695293882285 39.153408092584215,-86.53675475564131 39.153384449077066,-86.53385823221883 39.153348983801436),LINESTRING(-86.53884330147753 39.153786387618425,-86.54129772395659 39.153845496033796,-86.54169409031965 39.15389278273034,-86.54195325294167 39.15405828591804,-86.5422276604238 39.15431836156938,-86.5424868230458 39.15468483017386,-86.5431423520309 39.155122225687194,-86.5432948006321 39.15527590454636,-86.54334053521245 39.155630546786654,-86.54337102493268 39.15589061662678,-86.54660293527776 39.158881350697726,-86.54840182877173 39.16067809422458,-86.5486305016735 39.16089086344556,-86.54914882691754 39.161399142868646,-86.55049037460795 39.16268755565065,-86.55123737275376 39.163455863967755,-86.55195388117932 39.164235983826586),LINESTRING(-86.55193863631918 39.16433054322158,-86.5516947185573 39.164342363136996))
W Club House Dr Closure W Club House Dr, west of N Old SR 37 May 16, 2026 to December 31, 2030
W Club House Dr east of the Sycamore Shelter and to the intersection at N Old SR 37 has been closed. The Sycamore Shelter can still be accessed from the west via Kinser Pike and Club House Dr. A date for re-opening will be contingent upon necessary bridge repairs and is currently not known.
Engineering
LINESTRING(-86.53707976211632 39.19811710429795,-86.53700130750263 39.19812645808193)
West 2nd Street Modernization and Safety Improvements 2nd Street between Walker Street and Morton Street June 1, 2026 to November 1, 2026
Intermittent lane restrictions and traffic switches will be implemented.
Engineering
LINESTRING(-86.54614342649008 39.161438835305034,-86.53498313659308 39.16139200980018)
ROW2026-06-2540 3230 S Walnut June 4, 2026 to August 13, 2026
Lane closure for electric work
Engineering
LINESTRING(-86.53139824302374 39.12760036170292,-86.53141246531645 39.12667727495517)
ROW2026-04-2445 3108 E Kensington July 1, 2026 to July 31, 2026
Lane closures for DUKE
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52377876868866 39.12147233493138,-86.51759706206178 39.121453659579146),LINESTRING(-86.51142514858715 39.12147230267135,-86.50918756618826 39.1214641908073),LINESTRING(-86.4966328198572 39.14318153318331,-86.49661612728588 39.14296662473882,-86.4965894191718 39.14249019885966,-86.49657940362901 39.14218207388387),LINESTRING(-86.4965856533735 39.14085691567303,-86.49655754002136 39.13854313720762),LINESTRING(-86.49560844654047 39.13591188944821,-86.49547215998619 39.13593760288052,-86.49525115476307 39.13594045992798,-86.49489386298568 39.13594045992798,-86.49368938451963 39.135914746496695))
ROW2026-04-2431 3274 E Moores Pike July 1, 2026 to July 31, 2026
Lane closures for Duke
Engineering
LINESTRING(-86.49811144528441 39.150457070952484,-86.49709813604936 39.1504711033063,-86.49540627152295 39.150407957691925,-86.49356060113054 39.150351828209324,-86.49099113842736 39.15028868248788,-86.48686552225608 39.150183439492906,-86.48454337226009 39.15020881077777)
ROW2026-03-2393 1009 W Allen Street July 1, 2026 to July 31, 2026
Lane restrictions for 2 days between listed dates
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.54431996340989 39.15557049540237,-86.54429626215912 39.15556214141819,-86.54423593170274 39.155196235937694),LINESTRING(-86.54424239568021 39.15519957754887,-86.54425963295346 39.15519957754887,-86.544322118069 39.15556381221512))
Rhorer Road Bridge Replacement. East Rhorer Road from South Jamie Lane to South Sare Road. July 6, 2026 to October 2, 2026
Full closure of Road Road between South Jamie Lane to South Sare Road. Detour on South Walnut Street Pike to East Winslow Road to East Rogers Road to South Sare Road.
Monroe County Highway Department
GEOMETRYCOLLECTION(LINESTRING(-86.51390771909678 39.12145622576017,-86.5135500912827 39.1214569193462),LINESTRING(-86.51354919726761 39.12145761299567,-86.51354919726761 39.1214569193462))
ROW2026-06-2584 4395 E Moores Pike July 6, 2026 to August 13, 2026
Lane closure for pole installation and boring
Engineering
LINESTRING(-86.47569623355817 39.15023118451643,-86.47368728904725 39.15026720584359)
ROW2026-03-2391 1405 N College July 15, 2026 to March 25, 2027
LANE CLOSURE
Work Site: Approx. 308 ft. north of the intersection of W. 17th St. & N. College Ave.
Type of Work: replacing equipment only on existing Pole 174-150
Engineering
LINESTRING(-86.53471862482918 39.179533124853975,-86.53473531011427 39.17904001681751,-86.5347144535079 39.17952989136995)
ROW2026-06-2576 North Union Street July 15, 2026 to August 14, 2026
Lane closures, Full road closures and sidewalk diversions.
Road closure detour route is Jefferson and North Sunset Drive and N Jefferson Street.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.50942627906352 39.17146294151695,-86.50937095850257 39.17146294151695,-86.50936349123226 39.16934097157545,-86.50941384149044 39.16934357395394,-86.50940544978076 39.167761310068755,-86.50951118532292 39.16776391250565,-86.50952125537461 39.1693513810888,-86.50952629040043 39.16972612254301,-86.50952293371655 39.17024919581729,-86.50953132542627 39.17084382911773,-86.50954978718761 39.17141243437629,-86.50955146552955 39.17145667349425),LINESTRING(-86.50954978718761 39.1714605769445,-86.50942726822605 39.1714657815445))
ROW2026-04-2447 113 S Smith RD July 15, 2026 to August 31, 2026
lane closures
Engineering
LINESTRING(-86.48132271673016 39.16632563686514,-86.48125087291123 39.16632935030836,-86.48121554353493 39.164972820328785,-86.48128738735385 39.16497096357139,-86.48131612488133 39.166325946536375)
Hub 2 Sanitary Connection and Sidewalk remediation E 19th St July 20, 2026 to July 25, 2026
Lane and sidewalk closures for sidewalk, curb, driveway, and sanitary sewer work.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.53370923531362 39.18149718631409,-86.53236813080618 39.18135164843295),LINESTRING(-86.53232789767094 39.181343851752246,-86.53096332383461 39.1811411377503))
West Kirkwood Ave Safety improvements West Kirkwood Avenue; North Pine street to South Rogers Street will be closed to THRU traffic, Local Access only. The closure will not accept Thru traffic at Maple St. The Detour Route is: Patterson Drive to 2nd St to Rogers for east or west bound vehicles. July 20, 2026 to July 30, 2026
West Kirkwood Avenue will have intermittent lane closures for the duration of the project as well as 10 days of closure
Engineering
LINESTRING(-86.54941011754993 39.166728518060665,-86.54941011754993 39.166728518060665,-86.53889067543408 39.16661879811224)
Hub 2 sidewalk, curb, and drive apron reconstruction E 19th and N Lincoln July 20, 2026 to July 25, 2026
Concrete curb, driveway apron, and sidewalk repairs will be completed at the following locations:
North Lincoln Street
1306–1308 N. Lincoln Street:
Between 1306 and 1310 N. Lincoln
1400 N. Lincoln Street: Remove and replace the driveway apron and sidewalk as necessary to match the asphalt street grade.
East 19th and 20th Streets
Remove and replace damaged curb along E. 19th Street.
203 E. 19th Street: Remove and replace the driveway apron and curb.
202 E. 20th Street: Remove and replace the sidewalk, driveway apron, and curb.
Maintenance of Traffic
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53232884294823 39.18142146254013,-86.53228764079233 39.1814193333517,-86.53228764079233 39.18138313713854,-86.53097191861362 39.18119576820797),LINESTRING(-86.53090640873748 39.1797004620409,-86.5309036619271 39.18033284363099),LINESTRING(-86.5308954214959 39.18039033258435,-86.53087232539454 39.18106910615168))
Westbound 6th St Closed with Detour 200 block of 6th St in front of Graham Plaza July 21, 2026 to August 4, 2026
Lane and Parking Closure for crane placement at Graham Plaza. Sidewalks will have overhead protection and remain open.
Engineering
LINESTRING(-86.5349373623325 39.16758017701497,-86.53530454492062 39.167583340096996)
North Bound Lane Closure for Utility Boring Park St north of E 10th. July 21, 2026 08:00 am to 17:00 pm daily until July 24, 2026
Half block north bound lane closure with flaggers on N Park to allow for a fiberoptic boring project.
Engineering
LINESTRING(-86.52463226596788 39.17171031473353,-86.52464317523379 39.17206341358934)
Fiber Project Along W 3rd / Adams West and east bound lanes & bike lanes of W Adams and 3rd St from W Kirkwood Ave to I-69 July 23, 2026 07:00 am to 17:00 pm daily until July 24, 2026
Short term lane closures as fiber is pulled through a series of manholes in combination with some overlashing on existing poles.
Engineering
GEOMETRYCOLLECTION(POINT(-86.54965002018842 39.1666862511843),LINESTRING(-86.54965278767558 39.1666862511843,-86.54966662511134 39.16651674340079,-86.5496804625471 39.16642018815162,-86.54974134726446 39.16628715625785,-86.54993230387797 39.165988906420324,-86.55011772551705 39.16569709240568,-86.55037786930937 39.165276534784255,-86.55045535894965 39.16516924927416,-86.55059096582009 39.16501046641898,-86.55080959730515 39.16482593454231,-86.55103099627733 39.16468217100058,-86.5513188149412 39.16456201020296,-86.55157065627206 39.16449120106543,-86.55175331042412 39.16444399493409,-86.5519055222175 39.16442253759121,-86.55189721975604 39.164381768621666),LINESTRING(-86.55188338232027 39.16435816552328,-86.55200515175497 39.16435172831325,-86.55205496652373 39.16436889420535,-86.55244241472491 39.16437318567776,-86.55303188948837 39.16436889420541,-86.55357154948308 39.164371039941614,-86.55400327747887 39.164377477149884,-86.55503278269953 39.16439249730024,-86.55617298740631 39.16439893450658,-86.55618682484207 39.16445686933676,-86.55636117653268 39.16446759800377,-86.55648294596737 39.16449549253045,-86.55703921088501 39.16450622119157,-86.5576397555971 39.16450836692363,-86.5595188793735 39.164527678508904,-86.56285093390487 39.16455342728108,-86.56497636403786 39.16459419615106,-86.56696895478755 39.164592050421675,-86.56819495159607 39.164602779068076,-86.56948183312184 39.16461565344159,-86.56952888040342 39.164454723603114,-86.5700131906551 39.16445257786944,-86.57017923988423 39.16445043213571,-86.57025949701165 39.16444828640189))
2026 Bloomerang! Music Festival Alley Behind Blockhouse Bar and The Back Door between 4th to 3rd July 24, 2026 to July 26, 2026
2026 Bloomerang! Music Festival
Alley Behind Blockhouse Bar and The Back Door between 4th to 3rd
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53484322545145 39.165101538587294,-86.5342711288691 39.16510217840164),LINESTRING(-86.53426919515333 39.16557014852961,-86.53426545088841 39.16470522499122))
2026 Banneker Block Party Elm St b/t 7th and 8th July 24, 2026 12:00 pm to 21:00 pm
2026 Banneker Block Party
Public Works
LINESTRING(-86.54525298231178 39.16957997363241,-86.545271714319 39.16867867101223)