Choose types

Allen St. Bridge

Bridge between S Morton and S Walnut (150-156 W Allen St)

January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53517957550848 39.155618114825785,-86.53479233158195 39.15561291513657)

Construction for 115 E Kirkwood Lofts

115 E Kirkwood Ave

January 28, 2026 to July 28, 2027
Genesis Construction is requesting a pedestrian diversion and intermittent closures, traffic lane shifts and intermittent lane closures, alley closures, and metered parking reservations associated with the project at 115 E Kirkwood Avenue. The request impacts the northern sidewalk on E Kirkwood, the north–south and east–west alleys surrounding 115 E Kirkwood, the east–west travel lanes on E Kirkwood, and the metered parking spaces along the north and south side of E Kirkwood.
External Project
LINESTRING(-86.53245771844563 39.16705931743067,-86.53296069631311 39.16706282003534,-86.53295467260338 39.16667869420775)

W Club House Dr Closure

W Club House Dr, west of N Old SR 37

May 16, 2026 to December 31, 2031
W Club House Dr east of the Sycamore Shelter and to the intersection at N Old SR 37 has been closed. The Sycamore Shelter can still be accessed from the west via Kinser Pike and Club House Dr. Monroe County has accepted ownership of the bridge but does not currently have funding for repairs as of 8/3/26. A date for re-opening will be contingent upon necessary bridge repairs and is currently not known.
Engineering
LINESTRING(-86.53707976211632 39.19811710429795,-86.53700130750263 39.19812645808193)

West 2nd Street Modernization and Safety Improvements

2nd Street between Walker Street and Morton Street

June 1, 2026 to November 1, 2026
Intermittent lane restrictions and traffic switches will be implemented.
Engineering
LINESTRING(-86.54614342649008 39.161438835305034,-86.53498313659308 39.16139200980018)

ROW2026-03-2393

1009 W Allen Street

July 1, 2026 to September 11, 2026
Lane restrictions for 2 days between listed dates
Engineering
LINESTRING(-86.54432382616537 39.15558113016192,-86.54404882695962 39.154052551758724,-86.54403876867582 39.15391995661321,-86.54404547419836 39.15381206037901,-86.54410414752057 39.153678164822196,-86.54414773341706 39.153611866927946)

Rhorer Road Bridge Replacement.

East Rhorer Road from South Jamie Lane to South Sare Road.

July 6, 2026 to October 2, 2026
Full closure of Road Road between South Jamie Lane to South Sare Road. Detour on South Walnut Street Pike to East Winslow Road to East Rogers Road to South Sare Road.
Monroe County Highway Department
GEOMETRYCOLLECTION(LINESTRING(-86.51390771909678 39.12145622576017,-86.5135500912827 39.1214569193462),LINESTRING(-86.51354919726761 39.12145761299567,-86.51354919726761 39.1214569193462))

ROW2026-03-2391

1405 N College

July 15, 2026 to March 25, 2027
LANE CLOSURE Work Site: Approx. 308 ft. north of the intersection of W. 17th St. & N. College Ave. Type of Work: replacing equipment only on existing Pole 174-150
Engineering
LINESTRING(-86.53471862482918 39.179533124853975,-86.53473531011427 39.17904001681751,-86.5347144535079 39.17952989136995)

ROW2026-08-2680

1455 W Bloomfield Road

August 11, 2026 to September 4, 2026
Lane closures for street cuts associated with gas line work.
Engineering
LINESTRING(-86.55757770438115 39.158068628057634,-86.55720860858987 39.15822159653399,-86.55639617360107 39.158626221222875,-86.5552294915024 39.159351579169254,-86.55526767382565 39.15928743216932,-86.55638344616015 39.15859003536977,-86.55719800238911 39.15818705529415,-86.55748012733301 39.158076852177714,-86.5575734619009 39.15806698323348)

ROW2026-08-2688

134 East 7th Street

August 17, 2026 to September 11, 2026
Lane closures- Short term.
Engineering
LINESTRING(-86.50773129680023 39.16821038694164,-86.50827276774513 39.16820778756244)

Milling and Paving on E Miller Dr

E Miller Dr from S Walnut St to the first speed hump just east of S Henderson St

August 17, 2026 06:00 am to 16:00 pm September 3, 2026
Lane Restrictions on E Miller Dr from S Walnut St to the first speed hump just east of S Henderson St for milling and resurfacing.
Street
LINESTRING(-86.53258330540066 39.1468946555928,-86.53062585180277 39.14691505967471,-86.52859473059635 39.14691097885881,-86.52707402067757 39.14690689804266,-86.52693194743256 39.14691914049038,-86.52686354179608 39.14693954456513,-86.52666358685865 39.146984433508834,-86.52655308544588 39.147012999185336,-86.52614265162697 39.14702116080508,-86.52585850513695 39.14700483756468,-86.52559014456304 39.14698851432047,-86.52549542906637 39.14698035269694)

ROW2026-08-2696

3115 S Walnut Street

August 24, 2026 to November 2, 2026
Lane closure
Engineering
LINESTRING(-86.53139870895787 39.12769739955425,-86.53140961008194 39.12672067237892)

Bloomington Convention Center 3rd Street Reconstruction

301 W 3rd St

August 25, 2026 to September 8, 2026
Closure of West 3rd Street between College and Walnut for median replacement, paving, sidewalk, and curb replacement.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.5347579372061 39.16455566132365,-86.53376586388922 39.16454885433669),LINESTRING(-86.53376293741924 39.164655497056714,-86.53476671661598 39.16466230403336))

Kirkwood between Rogers and Pine: lane restrictions, flagging through this corridor.

Kirkwood between Rogers and Pine

August 26, 2026 to October 30, 2026
There will be lane restrictions with flagging throughout the project duration. This will be for concrete work, milling and paving, and striping.
Engineering
LINESTRING(-86.53871888988866 39.16662737783176,-86.54842546717605 39.166689987041195)

Grimes between Walnut and Patterson: lane restrictions, flagging through this corridor.

Grimes between Walnut and Patterson

August 26, 2026 to October 30, 2026
There will be lane restrictions with flagging throughout the project duration. This will be for concrete work, milling and paving, and striping.
Engineering
LINESTRING(-86.5337353862689 39.153353907205144,-86.53684373653472 39.153348112847794)

Patterson between Grimes and 3rd St: lane restrictions, flagging through this corridor.

Patterson between Grimes and 3rd St

August 26, 2026 to October 30, 2026
There will be lane restrictions with flagging throughout the project duration. This will be for concrete work, milling and paving, and striping.
Engineering
LINESTRING(-86.53683370113019 39.153335691690245,-86.54181064011533 39.15394251541889,-86.54345396926207 39.155920722835276,-86.54825061004615 39.16056525193349)

Rogers St between Patterson and 1st St: lane restrictions, flagging through this corridor.

Rogers St between Patterson and 1st St

August 26, 2026 to October 30, 2026
There will be lane restrictions with flagging throughout the project duration. This will be for concrete work, milling and paving, and striping.
Engineering
LINESTRING(-86.53874184326119 39.15381014075365,-86.53864911379202 39.159143194572096)

ROW2026-07-2643

1001 S Liberty Drive

August 31, 2026 to September 11, 2026
lane closures for sidewalk project
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.57915239678817 39.162158120413295,-86.57915239678817 39.16199550944117),LINESTRING(-86.57915239678817 39.16199550944117,-86.57915239678817 39.16199550944117,-86.57915239678817 39.162155830120525))

CBU - Stormwater Maintenance

Intersection of South Fairview Street and West Fourth Street, along with a section of West Fourth Street

August 31, 2026 to September 11, 2026
Beginning August 31st, City of Bloomington Utilities (CBU) will begin a phased project in the area of South Fairview Street and West Fourth Street to allow crews to complete stormwater maintenance. Phase 1: The first phase will include the closure of the intersection of South Fairview Street and West Fourth Street, along with a section of West Fourth Street extending to the alleyway west of the intersection. This phase is expected to continue through September 11.
Utilities
LINESTRING(-86.5409069002318 39.16563534589187,-86.5416850383151 39.165645703121726)

Lane restrictions on Patterson Dr from south of 3rd St to Grimes Ln.

Lane restrictions on Patterson Dr from south of 3rd St to Grimes Ln. There will be flagging for sidewalk and curb ramp installation and for milling and re-paving.

August 31, 2026 to September 21, 2026
This is part of the Grimes, Kirkwood, Patterson, and Rogers Project. There will be lane restrictions on Patterson Dr from south of 3rd St to Grimes Ln. There will be flagging for sidewalk and curb ramp installation and for milling and re-paving.
Engineering
LINESTRING(-86.55182187657726 39.164185707317955,-86.54156797754104 39.15386356919683,-86.53832990370971 39.153776382533636,-86.5372055726374 39.15349738475152,-86.5340799301977 39.15330557321778)

ROW2026-05-2476

223 E 1st Street

August 31, 2026 to September 4, 2026
Lane closure
Engineering
LINESTRING(-86.5316821307051 39.15937250857485,-86.53134685457823 39.15937042881018)