Back

Road Closed

South Baytree Lane Street Repair

South Baytree Lane, between East Pepperridge Drive and East Pepperridge Drive

October 1, 2018 07:30 am to 15:30 pm October 12, 2018
The City of Bloomington Utilities has scheduled a street repair project, weather permitting. Signage will be in place.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.52378119302354 39.12384788195564,-86.52353979421218 39.12367725496799,-86.52317501378614 39.12361483035707,-86.52274586034379 39.1236314769254,-86.52252055478652 39.123739679523624,-86.52248300386033 39.12393527610635,-86.52250446153245 39.12417248825449,-86.52254737687669 39.12435976043878,-86.52263320756514 39.12450957782775,-86.52269221616349 39.12457616323164),LINESTRING(-86.52271367383563 39.124592809572846,-86.52269221616349 39.12458032481729),LINESTRING(-86.52268685174545 39.12458448640274,-86.5226761229094 39.12457200164579))

Please enable Javascript

To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.

This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.