CASE CONSTRUCTION
200 W 4TH ST
April 3, 2019
METERS 200A&B
Controller
GEOMETRYCOLLECTION(POINT(-86.53573311639406 39.16563123962317),POINT(-86.53573311639406 39.16563123962317),POINT(-86.53573311639406 39.16563123962317),LINESTRING(-86.5357760317383 39.16566451288895,-86.53663433862305 39.16566451288895),LINESTRING(-86.53663433862305 39.16566451288895,-86.53663433862305 39.16566451288895))