South Walnut Street Pike
From East Winslow Road to East Heather Drive
October 5, 2022 to October 13, 2022
Paving, Monday through Thursday from 6:00 am till 4:00 pm, weather permitting.
Street
GEOMETRYCOLLECTION(LINESTRING(-86.52690524020282 39.135998311396264,-86.52684233629036 39.1325502999525,-86.52670604448 39.12519831561241,-86.52669549288903 39.1250708633259,-86.5266558220179 39.124591678241956,-86.52667459252376 39.12456392701574),LINESTRING(-86.52670867593864 39.12506997218344,-86.52671337879036 39.124001002491866))