Strong Dr Crosswalk Painting and Ramp Installation
Strong Drive approximately 900 LF South of Allen Street
July 15, 2024 to August 2, 2024
Closure of the East and West sidewalks and lanes of Strong Dr to paint crosswalk and install ramp on the East side. Only one sidewalk and one lane closure will occur at a time. Closures will occur over 2 days in the date range of 7/15/24-8/2/24 with each sidewalk closure occurring for no more than 24 cumulative hours.
Engineering
LINESTRING(-86.54429562577047 39.15558346905749,-86.54408851999843 39.154312072955406)