Back

Lane Restriction

S Basswood Dr Lane Restriction - Boring 6" C900 Cert-a-lok pipe

S Basswood Dr

August 26, 2024 to October 3, 2024
Kokosing Industrial Inc will be completing work for the City of Bloomington Utilities boring 6" C900 Cert-a-lok pipe for a new lift station across S Basswood DR. The force main will tie into the existing manhole at the intersection of S Basswood DR and S Basswood Cir. A lane closure on S Basswood Dr will occur as there will be equipment utilizing the space. Work will occur within the period of 8/27/24 to 9/26/24. A lane closure will be required from 8/27/24-8/29/24, 9/3/24-9/5/24, 9/9/24-9/12/24 and 10/03/24 for a total of 11 days. The lane closures will occur during daytime hours and will be removed in the evening.
Engineering
LINESTRING(-86.57141000686134 39.15069010475435,-86.5710723750957 39.150393364030464)

Please enable Javascript

To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.

This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.