Lane Restriction

GeoSolutions Inc. S High St Soil Borings

S High St between E Arden Dr and E 2nd St

October 7, 2024 to October 18, 2024
GeoSolutions Inc. will be performing 14 Soil Borings for the geotechnical investigation for a Multi-Use Path along S High Street on the east side of the road, signal poles at S High St & E Moores Pike and S High St and E 2nd St intersections and retaining walls. Lane closures will occur along S High St between E Arden Dr and E 2nd St and within the time period of 10/07/24-10/18/24 for a total of 4 days. Closures will occur between 9:30 AM and 3:15 PM.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.50838863680828 39.14984102986037,-86.50835764639136 39.151403061580055),LINESTRING(-86.50839563155559 39.148852648954175,-86.50839003602982 39.148075943579386),LINESTRING(-86.50837136095126 39.15347735442694,-86.5084364736762 39.15558357594509),LINESTRING(-86.50843961323062 39.157876353517565,-86.5084318807015 39.15911141711638),LINESTRING(-86.50843188070152 39.16052607023022,-86.5084009523547 39.16150928945581))

Please enable Javascript

To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.

This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.