Back

Lane Restriction

Lane and Sidewalk Closures for Duke Energy Work

E Hillside Dr

January 1, 2025 to March 31, 2025
WO# 42365068. Replacing 9 poles, Replacing overhead equipment on 36 poles, removing equipment from 1 pole, and installing equipment on 2 poles along B-Line Trail/S Walnut Street, E Hillside Drive/S Henderson Street, and S High Street in Bloomington, IN 47403 Permitted closures include: - 1 day of lane and sidewalk closures along the south side of E Hillside Dr between S Henderson St and S High St. - 1 day of lane and sidewalk closures along the east side of S High St between E Hillside Dr and E Southdowns Dr. - 1 day of lane and sidewalk closures along the east side of S Henderson St between E Hillside Dr and E Thornton Dr. Closures will occur in the date range of 01/01/2025 03/31/2025
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.50857144679036 39.150400530436286,-86.52699265985356 39.150509224305694),LINESTRING(-86.52699265985356 39.150509224305694,-86.53350015359871 39.15044711354375))

Please enable Javascript

To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.

This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.