Lane Restriction

Overhead Fiber Work along E Smith Ave

E Smith Ave from S College Ave to the alleyway east of S Walnut St and then down the alleyway

February 18, 2025 to April 12, 2025
QC Communication will be performing overhead fiber optic cable work along E Smith Ave between S College Ave and the alleyway east of S Walnut St and then down the alleyway to the parking lots in the south sometime between 2/18/2025 and 4/12/2025. The work once scheduled will take a max of 2 days and will not interfere with school pick up and drop off.
Engineering