Water Service Install on N Washington St south of E 17th St
N Washington St south of W 17th St (204 E 17th St)
April 2, 2025 to April 7, 2025
Taycon will be installing a new water line for 204 E 17th St that will run behind the property into the E/W alleyway south of E 17th St and then run west into N Washington St where the service will attach to the water main. The eastern side of N Washington St at the alley entrance will be under a lane closure during the daytime hours and the alleyway will also be closed.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53221745859939 39.17868120541152,-86.53221855457495 39.17857925598861,-86.5322194524276 39.17849573617056),LINESTRING(-86.53220948328648 39.17857919738955,-86.53101518018082 39.17857301508042))