ROW2025-06-1672
1730 S walnut
July 10, 2025 to July 12, 2025
Real America intends to replace the entrance to the parking lot of The Retreat at the Switchyard and the Meineke Car Care Center with new concrete. The concrete entrance/approach will be poured over the course of 3 days. The existing sidewalk will be cut with a clean edge on both sides of the approach and replaced with new concrete. The work will require a lane closure on the southbound side of S Walnut St and a sidewalk closure on either side of the driveway entrance. The closure is planned between July 10th, 2025 and July 12th, 2025.
Engineering