Back

Lane Restriction

ROW2025-06-1672

1730 S Walnut ST

July 10, 2025 to July 12, 2025
Real America intends to replace the entrance to the parking lot of The Retreat at the Switchyard and the Meineke Car Care Center with new concrete. The concrete entrance/approach will be poured over the course of 3 days. The existing sidewalk will be cut with a clean edge on both sides of the approach and replaced with new concrete. The work will require a lane closure on the southbound side of S Walnut St and a sidewalk closure on either side of the driveway entrance. The closure is planned between July 10th, 2025 and July 12th, 2025.
Engineering
LINESTRING(-86.53301584884403 39.14805191824351,-86.53269818272106 39.14699056727642,-86.53267420784894 39.1469952155353,-86.53299586978393 39.14804727002249,-86.53301584884403 39.14805501705379)

Please enable Javascript

To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.

This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.