Axis Fiber Solutions Lane Closure for Boring Work
113 E 15th St
July 21, 2025 to July 23, 2025
N Walnut and E 15th St, install 88' of UG Fiber Optic Cable by directional bore along/crossing E 15TH St. Fiber to service 1000 N Walnut.
Less than 3 days single lane closure.
Construction Dates 7/21/25 thru 7/23/25.
9 sq ft excavation (bore pit)
No sidewalk repair expected.