BSM Group Aerial and Boring Work
2750 E Buttonwood LN
July 24, 2025 to September 24, 2025
UG duct placement by directional bore place 1 - 2" duct and fiber optic cable at a minimum depth of 48". Boring along the roundabout of E Rogers Rd and S Sare Rd approx. 73' ( 24.33 ft²) and Overlash: (OL) existing strand with fiber optic cable. Work is located along S Sare Rd approx. 762'. Sidewalk closure and lane closure work for one 8 hour day. (SEE MOT)
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.496826008801 39.136021769120276,-86.49670584570615 39.136069702735654),LINESTRING(-86.49670241272744 39.13606703982137,-86.49664404783312 39.13613361429904,-86.4966234483238 39.1362401333578,-86.4966234483238 39.13638393378707,-86.49665434742404 39.136756748398824,-86.49666808032111 39.1370736391969))