ROW2025-09-1971
3 days maximum lane closure on 10th for sewer and water connection.
October 1, 2025 to October 3, 2025
Single lane closure with flaggers
Engineering
LINESTRING(-86.52913418723938 39.171703511180425,-86.52913579658116 39.17167481547912,-86.52896198930603 39.17167855837525,-86.52896198930603 39.17170475883316,-86.52913096847396 39.171703511180425)