ROW2025-09-1967
413 E 4th ST
October 27, 2025 to November 10, 2025
-413 E 4th St
-Replace guy wire on pole MNI-2013
-Close sections of the alleys to the north and to the west of 413 E 4th St
-Work will take three days between 10/27/25-11/10/25
-25 sqft of excavation
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52919521776353 39.16601182866978,-86.52916464059712 39.16601182866978,-86.52916464059712 39.165948193836755,-86.52919360833987 39.165948193836755,-86.52919521776353 39.16601557189904),LINESTRING(-86.5291244074619 39.16607546341345,-86.52912601680367 39.16604801313704,-86.5289892241439 39.16604426990949,-86.5289892241439 39.16607296793998,-86.5291244074619 39.16607296793998))