Duke Energy Conduit Boring
1210 W Arlington RD
February 6, 2026 to February 18, 2026
-Install pole on the west side of W Arlington Rd, bore in cable in conduit under W Arlington Rd.
-Close south bound lane of W Arlington Rd. Use guided pedestrian walk through on sidewalk on the west side of W Arlington Rd
-Work will take two non-consecutive days between 1/13-1/30 and one day between 2/3-2/17.