Cell Tower Equipment upgrade with bucket truck
2709 E 10th St WB right lane closure
March 25, 2026
Cell equipment upgrade with bucket truck and a west bound single right lane closure.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.50111714472098 39.17168988543071,-86.50111714472098 39.17168988543071,-86.50107415290879 39.17167625055632),LINESTRING(-86.50107415290879 39.17167625055632,-86.50107415290879 39.17167625055632))