ROW2026-04-2414
205 E Kirkwood
April 6, 2026 to April 8, 2026
lane and sidewalk closures for scaffolding pick up
Engineering
LINESTRING(-86.53233576481117 39.16660845365905,-86.53232858037055 39.166572247427496,-86.53172867957974 39.1665611070448,-86.53174304846095 39.16660845365905,-86.53233217259086 39.166611238753035)