Hub 2 Sanitary Connection and Sidewalk remediation
E 19th St
July 20, 2026 to July 25, 2026
Lane and sidewalk closures for sidewalk, curb, driveway, and sanitary sewer work.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.53370923531362 39.18149718631409,-86.53236813080618 39.18135164843295),LINESTRING(-86.53232789767094 39.181343851752246,-86.53096332383461 39.1811411377503))