Hub 2 sidewalk, curb, and drive apron reconstruction
E 19th and N Lincoln
July 20, 2026 to July 25, 2026
Concrete curb, driveway apron, and sidewalk repairs will be completed at the following locations:
North Lincoln Street
1306–1308 N. Lincoln Street:
Between 1306 and 1310 N. Lincoln
1400 N. Lincoln Street: Remove and replace the driveway apron and sidewalk as necessary to match the asphalt street grade.
East 19th and 20th Streets
Remove and replace damaged curb along E. 19th Street.
203 E. 19th Street: Remove and replace the driveway apron and curb.
202 E. 20th Street: Remove and replace the sidewalk, driveway apron, and curb.
Maintenance of Traffic
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53232884294823 39.18142146254013,-86.53228764079233 39.1814193333517,-86.53228764079233 39.18138313713854,-86.53097191861362 39.18119576820797),LINESTRING(-86.53090640873748 39.1797004620409,-86.5309036619271 39.18033284363099),LINESTRING(-86.5308954214959 39.18039033258435,-86.53087232539454 39.18106910615168))