Choose types
Weddle Brothers IU Fine Arts Project E. 13th Street between Fess & Woodlawn November 27, 2018 to February 28, 2019
IU Fine Arts Project Weddle Brothers Construction Group
Public Works
LINESTRING(-86.52470521402921 39.1752171129763,-86.52361087275115 39.17519528036328)
West Arlington Road Water Line Installation Project West Arlington Road, between North Prow Road and West 17th Street January 2, 2019 08:30 am to 16:00 pm January 11, 2019
E&B Paving, working on behalf of the City of Bloomington Utilities, has scheduled a water line installation project, weather permitting. To facilitate this work, it will be necessary to reduce traffic on West Arlington Road, between North Prow Road and West 17th Street, to one lane of two-way traffic during the hours work is underway (8:30 a.m.-4:00 p.m.), Monday through Friday. Signage and traffic control personnel will be in place.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.54795191956187 39.179583834577414,-86.54884241295481 39.18041965475231,-86.54939494801187 39.18125962322512,-86.54953442288065 39.18144674354767,-86.54950656949065 39.18140888188262,-86.54934935045861 39.18119517055425),LINESTRING(-86.54951564741738 39.18143634798727,-86.54991261435158 39.18215987532173,-86.55014328432688 39.18355285238022,-86.55022911501506 39.18442604780418,-86.55070654821971 39.18559860745273,-86.55118934584237 39.18660483098819,-86.55177406740722 39.18817650669561,-86.55183844042358 39.18910369572228,-86.55181698275146 39.190026714800524,-86.55188135576782 39.190779257420076,-86.55204765272657 39.19143616648938,-86.55235342455427 39.19202239028371,-86.55261628103773 39.19237578524388))
Range Road/14th Street Closure (Phase II) Range Road/14th Street will be closed at the intersection with the Indiana State Road 45/46 Bypass January 7, 2019 to March 8, 2019
Range Road/14th Street will be closed at the intersection with the Indiana State Road 45/46 Bypass starting on or about Jan. 7 through Mar. 8, 2019, for installation of underground utilities. No thru traffic will be allowed on Range Road. Schedule is subject to change.
Indiana University
LINESTRING(-86.50416815120448 39.17523555569335,-86.50324010688533 39.175652453228366,-86.50295445162524 39.17525634864643)
Single lane access to Data Center west parking lot The access road for the Data Center west parking lot will be reduced to one lane January 21, 2019 to February 8, 2019
The access road for the Data Center west parking lot will be reduced to one lane starting on or about Jan. 21 through Feb. 8, 2019, for work on underground utilities. Schedule is subject to change.
Indiana University
GEOMETRYCOLLECTION(LINESTRING(-86.50354972255066 39.174892658423715,-86.50360873114899 39.1746930447878,-86.50357118022278 39.174497589220294,-86.50338879000977 39.174160738988405,-86.50313501829265 39.17377252147131,-86.50298645865753 39.17354525538451),LINESTRING(-86.50298645865753 39.17354525538451,-86.50313129794435 39.1737739830285,-86.5029971874936 39.17356189014731))
South Mitchell Street Water Line Installation Project South Mitchell Street, between East Maxwell Lane and East Southdowns Drive February 6, 2019 07:30 am to 17:00 pm April 5, 2019
The City of Bloomington Utilities has scheduled a water line installation project, weather permitting. Signage will be in place. South Mitchell Street, between East Maxwell Lane and East Southdowns Drive, will be restricted to local traffic only for the duration of the project.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.51435054612732 39.155552354977885,-86.51413596940613 39.155727064476,-86.51395357919311 39.15592673194263,-86.51381410432435 39.15620127378412,-86.51373900247192 39.15647581455437,-86.51372827363588 39.15670043802416,-86.51372827363588 39.15690842207903,-86.51370681596374 39.157174640772126,-86.51372827363588 39.15744085845793,-86.5137175447998 39.15764884032413,-86.5137175447998 39.1577902676419),LINESTRING(-86.5137175447998 39.1577902676419,-86.5137175447998 39.1577902676419))
1607 S Rogers St S Rogers St between W Cherokee Dr and Hillside Dr February 7, 2019 to February 8, 2019
S Rogers St will be closed to thru traffic between W Cherokee Dr and Hillside Dr. Detour signs will be in place to direct traffic to S Walnut St. The closure will be during the hours of 7 pm-6 am both evenings of 2/7 and 2/8. This closure is to facilitate the water main tap for the Switchyard Park Project.
Planning & Transportation
LINESTRING(-86.53880180862849 39.15035605673319,-86.53886618164485 39.14714441535946)
Gordon Pike Between Rogers Street and Old SR 37 South February 11, 2019 to April 15, 2019
This segment of roadway will be closed for construction work for the Fullerton Pike project.
Monroe County Highway Department
POINT(-86.53736585017259 39.12146556928434)
2500 E 3rd St E 3rd St between College Mall Rd and Woodscrest Dr February 11, 2019 to February 12, 2019
east and westbound lane closures on E 3rd St between College Mall Rd and Woodscrest Dr
Planning & Transportation
LINESTRING(-86.50088585687254 39.164225949668605,-86.50210357976529 39.16423010891077)
East 2nd closed East 2nd Street closed between South Henderson Street to South Grant. February 13, 2019
Closed for tree removal
Street
LINESTRING(-86.52720340577362 39.161342144054714,-86.5298856146248 39.161361963651444)
West 4th Street Pavement Restoration Project West 4th Street, between Walnut Street and College Avenue February 13, 2019 07:30 am to 14:00 pm
The City of Bloomington Utilities has scheduled a street repair project, weather permitting. Signage will be in place.
Utilities
LINESTRING(-86.53485335183703 39.16562656056891,-86.53365172219836 39.16562656056891)
South Reisner Road South Reisner Road Closed between East Third to S Meadowbrook Dr. February 13, 2019
Closed for tree removal
Street
LINESTRING(-86.48797212973119 39.164234049687764,-86.48793994322301 39.162815733927744,-86.48783265486243 39.16251626184095,-86.4864593638468 39.161480577712325)
Range Road access to Data Center west parking lot Range Road February 18, 2019 to March 11, 2019
The access road for the Data Center west parking lot will be reduced to one lane starting on or about Feb. 18 through Mar. 11, 2019, for work on underground utilities. Schedule is subject to change.
Indiana University
GEOMETRYCOLLECTION(LINESTRING(-86.50358080573352 39.17475928421939,-86.50361299224168 39.174576304727765,-86.50346278853685 39.174263020553184,-86.50294780440599 39.17348950763122),LINESTRING(-86.50293707556992 39.17350614240726,-86.50293707556992 39.17349782501972))
S Walnut St S Walnut St between E 3rd St and E 4th St February 21, 2019 to February 22, 2019
There will be a one lane closure on S Walnut St in the eastern lane between E 3rd and E 4th St.
Planning & Transportation
LINESTRING(-86.53360344243617 39.16522416073798,-86.53360344243617 39.164662668754545)
S College Mall Rd S College Mall Rd between E 3rd St and E Buick Cadillac Dr February 22, 2019 to February 23, 2019
Mobile southbound one lane closure on S College Mall Rd (western lane) between E 3rd St and E Buick Cadillac Dr
Planning & Transportation
LINESTRING(-86.49830883976692 39.16414710116649,-86.49792260166878 39.162275415132314,-86.49770802494756 39.16093608922503,-86.49793333050484 39.1581741689611)
Intersection South Mitchell Street East Maxwell Lane Water Line Project The intersection of South Mitchell Street and East Maxwell Lane. February 26, 2019 07:30 am to 15:30 pm
The intersection of South Mitchell Street and East Maxwell Lane will be reduced to one lane of two-way traffic, weather permitting. Signage will be in place.
Utilities
POINT(-86.51263393235766 39.157806906131185)
West 17th Street Tree Clearing West 17th Street between Lismore Drive and Monroe Street. February 26, 2019 to March 15, 2019
Clearing trees from right of way on 17th Street for W. 17th Street Reconstruction Project. There will be lane restrictions during tree clearing. Flaggers will be in place.
Planning & Transportation
LINESTRING(-86.55485190225237 39.17910198596863,-86.54814637971515 39.17911861941687)
S High St South High St Closed from E Meadow Bluff Court to Greenbriar Lane February 27, 2019
Emergency removal of tree. Closed for approx. 2 hours
Street
LINESTRING(-86.50825519678128 39.14279734940271,-86.50829352565286 39.14409897344885)
West 7th Street Water Line Repair Project West 7th Street, between Walnut Street and College Avenue February 28, 2019 09:00 am to 15:30 pm
The City of Bloomington Utilities has scheduled a water line repair project, weather permitting. Traffic on Walnut Street wishing to turn west onto West 7th Street will be detoured to West 9th Street during the hours the work is underway. Signage will be in place.
Utilities
LINESTRING(-86.5348748095093 39.16852959397647,-86.53358734918217 39.168546229925795)
1607 S Rogers St 1607 S Rogers St between S Rockport Rd and Patterson Dr March 7, 2019 to March 8, 2019
S Rogers St will be closed to thru traffic between W Cherokee Dr and Hillside Dr. Detour signs will be in place to direct traffic to S Walnut St. The closure will be during the hours of 7 pm-6 am both evenings of 2/7 and 2/8. This closure is to facilitate the water main tap for the Switchyard Park Project.
Planning & Transportation
LINESTRING(-86.53880156350705 39.150519911274415,-86.53884447885129 39.14707530341502)
E 10th St -Eastbound Lane Closure E 10th St between N Grant St and N Dunn St March 11, 2019 to March 13, 2019
E 10th St eastbound Lane Closure between N Grant St and N Dunn S
Planning & Transportation
LINESTRING(-86.52831142474759 39.17166630110165,-86.52970617343533 39.17167045990382)
N Rogers St N Rogers St between W 7th St and W 11th St March 11, 2019 to March 22, 2019
N Rogers St temporary southbound detour and northbound lane shifts between 7th St and 11th St. Detour-southbound traffic will be detoured from N Rogers St at 11th St to N College Ave to W 7th St while one lane of traffic on N Rogers remains open for northbound traffic
Planning & Transportation
LINESTRING(-86.53859771562193 39.168605495463225,-86.53857625794981 39.17321349802239)
East Hillside Drive Wastewater Infrastructure Repair Project East Hillside Drive, between South Henderson Street and South Grant Street March 13, 2019 20:00 pm to 06:00 am March 14, 2019
The City of Bloomington Utilities has scheduled a wastewater infrastructure repair project, weather permitting. Signage will be in place.
Utilities
LINESTRING(-86.53028286767578 39.15049391094078,-86.52697838616942 39.15056047177569)
E 10th St Westbound Lane Closure E 10th St between N Grant St and N Dunn St March 14, 2019 to March 16, 2019
E 10th St Westbound Lane Closure between N Grant St and N Dunn St
Planning & Transportation
LINESTRING(-86.52973018074368 39.171679152469636,-86.52828447008466 39.171668755464964)
East 7th closed East 7th Street closed between North Dunn Street and North Indiana Ave. March 15, 2019
Closed for tree removal.
Street
LINESTRING(-86.52694760732648 39.16850575585312,-86.52826317715171 39.16851762974861)
W 10th St W 10th St between N Morton St and N Rogers St March 20, 2019 to March 22, 2019
One lane closure eastbound on W 10th St between N Morton St and N Rogers St
Planning & Transportation
LINESTRING(-86.53613008332829 39.17164980536833,-86.53662360978701 39.171658122974435)
City of Bloomington Utilities Water Infrastructure repair Project East Atwater Avenue, between South High Street and South Clifton Avenue March 21, 2019 08:30 am to 15:00 pm
The City of Bloomington Utilities has scheduled a water infrastructure repair project, weather permitting. To facilitate this work, it will be necessary to close the west bound lane of East Atwater Avenue, between South High Street and South Clifton Avenue, during the hours listed above. The detour route will be posted.
Utilities
LINESTRING(-86.50970496011352 39.16307279028851,-86.50850333047487 39.16307279028851)
City of Bloomington Utilities Water Infrastructure Repair Project South Union Street, between East Atwater Avenue and East 3rd Street March 21, 2019 08:30 am to 15:00 pm
The City of Bloomington Utilities has scheduled a water infrastructure repair project, weather permitting. To facilitate this work, South Union Street, between East Atwater Avenue and East 3rd Street, will be restricted to local traffic only during the hours the project is underway.
Utilities
LINESTRING(-86.50908268762205 39.16415420270235,-86.50908268762205 39.16313933922481)
W 11th St W 11th between N Rogers St and N College Ave March 25, 2019 to March 27, 2019
One lane closure, east and westbound alternately, on W 11th between N Rogers St and N College Ave. The sidewalk and bike lane will also be closed.
Planning & Transportation
LINESTRING(-86.53850115609744 39.17327171994978,-86.53486408067324 39.17328003736404)
Friendship Road Between SR 46 and Lampkins Ridge Road, at the bridge April 1, 2019 to May 31, 2019
The road is closed due to high water at this time. As soon as the water lowers, we will begin the bridge repairs. Please use alternate routes during this closure.
Monroe County Highway Department
POINT(-86.40735060188915 39.15005398383934)
2nd-Bloomfield Multimodal Safety Project Wst 2nd Street between Landmark Avenue and Patterson Drive April 1, 2019 to October 18, 2019
Traffic Signal and Sidepath project on West 2nd Street between Landmark Avenue and Bloomfield Road. Lane restrictions with flaggers in place.
Planning & Transportation
LINESTRING(-86.5539010858018 39.15995457833884,-86.55231321806497 39.160303975038914,-86.55158365721292 39.16038716447363,-86.55084336752479 39.16037052659456,-86.54977048391885 39.16036220765355,-86.5489336347062 39.16053690520826,-86.54850448126382 39.16074487792204)
South Mitchell Street Sidewalk Project South Mitchell Street from East Circle Drive to East Maxwell Lane April 1, 2019 to June 14, 2019
This project would install a sidewalk on the east side of Mitchell Street from Circle Drive to Maxwell Drive. The sidewalk would replace the existing striped shoulder on the street. The project would also include storm water infrastructure along with the curb on the east side of the street.
Planning & Transportation
GEOMETRYCOLLECTION(POINT(-86.51373403106531 39.15779487061269),LINESTRING(-86.51374475990137 39.15778655136711,-86.51378767524561 39.156322348824006,-86.51395933662256 39.1558897376959))
West 17th Street Reconstruction West 17th Street from Lismore Drive to Monroe Street April 1, 2019 to November 8, 2019
West 17th Street from Lismore Drive to Monroe Street will be closed to traffic for a road construction project. Detour signage will be in place.
Planning & Transportation
LINESTRING(-86.55487335992433 39.17911030269323,-86.54920853448488 39.17904376886884,-86.54762066674807 39.17909366924303)
Moores Pike / Clarizz Blvd. Pedestrian Crossing At the intersection of East Moores Pike and South Clarizz Blvd. April 1, 2019 to May 31, 2019
This project is intended to enhance intersection safety for pedestrians crossing Moores Pike at the Clarizz Blvd intersection.
Planning & Transportation
LINESTRING(-86.49193887042989 39.150360639469824,-86.49078836053948 39.15032735896574)
South Walnut Street Sidewalk 1,000 feet north to 650 feet south of Burks Drive April 1, 2019 to May 31, 2019
This project will install a sidewalk on the west side of S Walnut Street from approximately 650 feet south of Burks Drive to 1,000 feet north of Burks Drive.
Planning & Transportation
LINESTRING(-86.53141489557964 39.130082858312164,-86.53135052256329 39.12515575362826)
Hartstrait Road Between SR 48 and Vernal Pike April 8, 2019 to April 12, 2019
This segment of roadway will be closed for a culvert replacement. Please use alternate route during this closure. Weather permitted.
Monroe County Highway Department
POINT(-86.61122120690928 39.17208231958111)
West 4th Street Pavement Restoration Project West 4th Street, between South Walnut Street and South College Avenue April 9, 2019 09:00 am to 11:00 am
The City of Bloomington Utilities has scheduled a pavement restoration project, weather permitting.
Utilities
LINESTRING(-86.53490163159937 39.1655891281236,-86.5336249001083 39.16559328728516)
East 1st Street Pavement Restoration Project East 1st Street, between South Walnut Street and South Washington Street April 10, 2019 09:00 am to 11:00 am
The City of Bloomington Utilities has scheduled a pavement restoration project, weather permitting. Signage will be in place.
Utilities
LINESTRING(-86.53366781545263 39.15940418278245,-86.53240717721562 39.159375066084664)
North Morton Street Curb Restoration Project The southbound lane of North Morton Street, between West 9th Street and West 10th Street April 11, 2019 09:00 am to 14:00 pm
The City of Bloomington Utilities has scheduled a curb restoration project, weather permitting. Signage will be in place.
Utilities
LINESTRING(-86.53606481782153 39.17168117487316,-86.53610773316576 39.170475112112996)
North Morton Street Curb Restoration Project April 11, 2019 09:00 am to 14:00 pm
The City of Bloomington Utilities has scheduled a curb restoration project, weather permitting.
Utilities
Dillman Road Between Victor Pike and Dillman Lane April 15, 2019 to April 22, 2019
This segment of roadway will be closed for the trail improvements. Please use alternate routes.
Monroe County Highway Department
POINT(-86.55446566415397 39.09312108048064)
North Maple Grove Road N. Maple Grove Road and Delap Road Intersection (sight of the new covered bridge) April 15, 2019 to May 17, 2019
The location will be closed for the construction of the new covered bridge. Please use an alternate route during this time.
Monroe County Highway Department
POINT(-86.56951097421137 39.26524935496931)
Russell Road Near Timbercrest Drive April 15, 2019
This roadway will be under lane restrictions for a stormwater maintenance project. This will be performed under flagging operations so please use caution while traveling in this area.
Monroe County Highway Department
POINT(-86.48581471627038 39.19329744410271)
W 17th St Lane Shifts W 17th St between N Kinser Pike and N Jackson St April 16, 2019
W 17th St Lane closure and Shift between N Kinser Pike and N Jackson St. The westbound lane will be closed. Eastbound and westbound traffic will remain open but shifted into the turn lane and southern lane.
Planning & Transportation
LINESTRING(-86.53783574800245 39.17899058423214,-86.53958454828015 39.179007217706726)
E University St Road Closure E University St Road Closure between S Park Ave and S Woodlawn Ave April 16, 2019 to April 17, 2019
E University St Road Closure between S Park Ave and S Woodlawn Ave from 9a-4p Signage and detour will be in place to direct traffic. Road will be open at night.
Planning & Transportation
LINESTRING(-86.52395821881866 39.16036606691699,-86.52346469235992 39.16036606691699)
Rhorer Road Walnut Street Pike to Snoddy Road April 16, 2019 to April 17, 2019
There will be lane restrictions along this road segment for paving activities. Please use caution when traveling in this area and be aware of the crews in the roadway. Weather permitting.
Monroe County Highway Department
LINESTRING(-86.52675269052651 39.12144020849658,-86.48963091776038 39.121406914320374)
Robin Road 3611 block April 16, 2019 to April 17, 2019
This segment of roadway will have lane restrictions for a culvert replacement. Please use caution when traveling in this area while crews are working in the roadway. Weather permitting.
Monroe County Highway Department
POINT(-86.48802198243723 39.133944310167834)
East Rock Creek Dr closed East Rock Creek from South Stratford Drive to South Wexley Road. April 16, 2019 to April 18, 2019
Road closed for repairs from 7:00 am to 3:00 pm
Street
GEOMETRYCOLLECTION(LINESTRING(-86.51234452619606 39.13982065171382,-86.51011445733816 39.13981472278823),LINESTRING(-86.51011958012164 39.13981669907565,-86.51011958012164 39.13981669907565),LINESTRING(-86.51011703215404 39.139812725613524,-86.51011703215404 39.139812725613524),LINESTRING(-86.51011703215404 39.139812725613524,-86.51011703215404 39.13981867542651))
W 10th St Closure W 10th St between N Rogers and N Morton St April 17, 2019 to April 23, 2019
W 10th St Road Closure between N Rogers and N Morton St
Planning & Transportation
LINESTRING(-86.53612471891024 39.17167059938171,-86.53670944047546 39.171674758183684,-86.536806 39.17163732895733,-86.53726197553254 39.171258876771816,-86.53734244180299 39.1712339238089,-86.53800762963868 39.171250559118505,-86.53834022355653 39.171371164995406,-86.5385494358597 39.17139611790961)
Lane Restriction - Eastbound lanes of 4th St. 4th Street, east of College Avenue April 17, 2019 07:00 am to 16:00 pm April 18, 2019
Kevin Huntley Excavating will be closing the eastbound lanes of 4th Street to facilitate a water tap. Traffic will use the remaining lanes to continue to flow east and west.
Planning & Transportation
LINESTRING(-86.53485603404614 39.16559640665628,-86.53424449039075 39.16559432707561)
Harmony Road SR 45 to Rockport Road April 22, 2019 to April 25, 2019
The crews will be paver patching along this roadway. This will be weather permitting and under flagmen conditions. Please use caution when traveling in this area.
Monroe County Highway Department
LINESTRING(-86.60955578643744 39.04917677463257,-86.6140189822382 39.05450910032636,-86.61693722564642 39.055524247480434,-86.61745220977727 39.063200890721305,-86.61826604044543 39.065959386753406,-86.623587543131 39.067692024889624,-86.6265057865392 39.06862496626991,-86.62822240030873 39.07115717357004,-86.62822240030873 39.07315622042168,-86.62787907755482 39.07555500189761,-86.63165562784779 39.08075208202425,-86.63577550089467 39.08355035122486,-86.63869374430287 39.086481752290865,-86.638178760172 39.11072776113946)
W 11th St Lane Closure W 11th St between N Rogers and N Morton St April 22, 2019 to April 24, 2019
W 11th St Lane Closure between N Rogers and N Morton St Flaggers and signage will be in place to direct traffic
Planning & Transportation
LINESTRING(-86.53846400625112 39.173281226837844,-86.53613584882619 39.17327290942376)
Hash Road Brummetts Creek Road to dead end April 22, 2019
Crews will be cleaning culvert inlets and placing stone on the roadway. This will be performed with lane restrictions. Please use caution when traveling this roadway.
Monroe County Highway Department
LINESTRING(-86.39869877301392 39.172272459000396,-86.39950358568882 39.17228248654507,-86.40068375765537 39.17258191705096,-86.40104853808141 39.172681726936275,-86.40154206454012 39.17323067877311,-86.40188538729404 39.1736132790343,-86.40214287935947 39.17427866583438)
Hartstrait Road At Walcott Lane intersection April 22, 2019 to April 25, 2019
This road closure is for a culvert replacement. Please use alternate routes during this closure.
Monroe County Highway Department
POINT(-86.61130703759767 39.20132076312612)
W. Maple Grove Road 3581 Block, by Timberline Drive April 23, 2019
The crews will be working at this location for a stormwater project. This will be performed under flagging conditions. Please use caution when traveling in this area.
Monroe County Highway Department
POINT(-86.58101953340143 39.24452413964903)
Cardinal Glen Drive Between Walnut Street Pike and dead end April 24, 2019
The stormwater crew will be repairing some inlets along this route. This will be performed under flagging conditions. Please use caution when traveling in this area.
Monroe County Highway Department
GEOMETRYCOLLECTION(LINESTRING(-86.52650512158766 39.11343572306805,-86.52532494962111 39.11338577612392),LINESTRING(-86.5238290433362 39.11340242510923,-86.52181202215702 39.11340242510923))
Terrace Drive Between Rogers Street and Madison Street April 25, 2019
The stormwater crew will be working along this route performing ditching work. This will be performed under flagging conditions. Please use caution when traveling in this area.
Monroe County Highway Department
LINESTRING(-86.53866593258972 39.12752212929951,-86.53668109791869 39.12750548365062)
4th Street Closed Madison Street to the B-Line April 30, 2019
Snedegar Construction has 4th St down to one lane between Madison and the B-Line through 9:00 pm on April 30th.
Planning & Transportation
LINESTRING(-86.53742290807331 39.165623441199244,-86.53611399007404 39.16560680455862)
321 S Walnut S Walnut street between E Smith Ave and E 3rd St May 6, 2019 to August 1, 2020
Intermittent lane closures at S Walnut street between E Smith Ave and E 3rd St excluding hours of 7:30 am-9 am and 3 pm- 6pm. The sidewalk and Bike lane will be closed for the duration of the project as well as the north south alley. The east-west alley will be limited to 12ft westbound access.
Planning & Transportation
LINESTRING(-86.53361148906325 39.16314245870467,-86.53359003139113 39.163886970604324,-86.5330106742439 39.16388281134189,-86.53301603866194 39.1628721032713)
10th Street Closed - Roof Warranty Work East 10th Street May 6, 2019 to May 10, 2019
South Central Roofing will be closing 10th Street from the west side of the Jordan Street intersection through the east side of the Fee Lane intersection in order to facilitate work on the Wells Library roof.
Planning & Transportation
LINESTRING(-86.51894229223032 39.171600810160584,-86.51576655675669 39.17156753970312)
Fowler Road 4801 Fowler Road May 6, 2019
The stormwater crew will be installing a drainage pipe at this location. This will be performed under flagging operations, please use caution while in this area.
Monroe County Highway Department
POINT(-86.5956643946229 39.10066483655203)
South Henderson Street South Henderson Street from East 2nd Street to East 1st Street May 6, 2019 to May 16, 2019
City of Bloomington Street Department will have LANE RESTRICTIONS for a Sidewalk Project. Questions, please call City Street 812-349-3448.
Street
LINESTRING(-86.52720326507894 39.16133175857996,-86.52714962089865 39.15932131904586)
215 S Walnut St 215 S Walnut St between E 3rd and E 4th St May 6, 2019 07:00 am to 16:00 pm May 7, 2019
Two lane closure at 215 S Walnut St between E 3rd and E 4th St
Planning & Transportation
LINESTRING(-86.5336409933624 39.16558184959027,-86.53365172219846 39.164637713451214)
N Lincoln St N Lincoln St between E 10th and E Cottage Grove May 7, 2019 08:30 am to 17:00 pm daily until May 9, 2019
Road Closed on N Lincoln St between E 10th and E Cottage Grove. Detour E 10th St to N Grant to E Cottage Grove
Planning & Transportation
LINESTRING(-86.53103388619992 39.17174961657659,-86.53103388619992 39.17252314863754)
Garrison Chapel Road Between Eller Road and Gardner Road May 8, 2019
The stormwater crew will be performing ditching operations along this segment of roadway. This will be under flagging conditions so please use caution while traveling in this area.
Monroe County Highway Department
LINESTRING(-86.64292954650217 39.12256353785082,-86.64292954650217 39.124594420459744,-86.64284371581368 39.1260925750197,-86.64297246184641 39.13421534715809)
215 S Walnut St 215 S Walnut St between E 3rd and E 4th St May 8, 2019 07:00 am to 16:00 pm daily until May 17, 2019
One lane closure (western lane and Bike Lane) at 215 S Walnut St between E 3rd and E 4th St
Planning & Transportation
LINESTRING(-86.53363613081518 39.16557909052301,-86.53363076639714 39.16463495434692)
South Summerwood Court South Summerwood Court from South Azalea Lane to Dead End May 8, 2019
City of Bloomington Street Department will have LANE RESTRICTIONS for a Resurface Project. Questions, please call City Street 812-349-3448.
Street
LINESTRING(-86.522914214887 39.14310674721298,-86.52275030513337 39.14285248877965,-86.52272943755052 39.14280972915162,-86.52271900371817 39.142775061689605,-86.52271304921086 39.1426756670287)
W 7th St W 7th St between Walnut and College Ave May 9, 2019
One lane closure, westbound on W 7th St between Walnut and College Ave for street cut repair.
Planning & Transportation
LINESTRING(-86.53366245103453 39.16854726967253,-86.53471387696837 39.16854726967253)
Downtown Curb Ramp Improvements Intersection of East 9th Street and North Washington Street May 13, 2019 to May 28, 2019
Reconstruction of curb ramps, curbs and sidewalks. Some lane restriction possible.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.53231618331567 39.17050490723406,-86.53231752442018 39.17039885594352),LINESTRING(-86.53239799069063 39.17045500076429,-86.53223839925425 39.17045500076429))
N Rogers St N Rogers St between 10th and 11th St May 14, 2019 09:00 am to 12:00 pm
One lane closure, southbound, on N Rogers St between 10th and 11th St
Planning & Transportation
LINESTRING(-86.53860844445802 39.17143654909765,-86.53860844445802 39.17318323008669)
E Atwater Ave E Atwater Ave between Dunn St and Fess Ave May 15, 2019 09:00 am to 16:00 pm daily until May 17, 2019
One lane closure on E Atwater Ave between Dunn St and Fess Ave
Planning & Transportation
LINESTRING(-86.52754701448069 39.16314869766393,-86.52680136037455 39.16311958251586)
N Range Rd N Range Rd between E 10th and the Bypass May 15, 2019 to June 5, 2019
The northbound lane of N Range Rd will be closed between E 10th St and the Bypass. The southbound lane of the north-south portion of Range Rd will be open to southbound One Way traffic only during this time. It will be a right in from the Bypass and a right out on E 10th St. East-west access will remain open on the east-west portion of Range Rd.
Planning & Transportation
LINESTRING(-86.49576222265274 39.175566552587924,-86.49556910360369 39.1753669408651,-86.49551545942337 39.17527545196947,-86.4954296287349 39.17486790907898,-86.49537598455463 39.17159084569366)
N Smith Rd N Smith Rd between E Grandview Dr and E 10th St (St Rd 45) May 15, 2019 to July 1, 2019
There will be intermittent northbound lane closures on N Smith Rd between E Grandview Dr and E 10th St during the timeframe of 12/1-4/1. Flaggers and signage will be in place.
Planning & Transportation
LINESTRING(-86.48249663186638 39.17256473614171,-86.48176707101432 39.17208231958111,-86.48146666360465 39.17161653493406,-86.4813164598998 39.17120065317786,-86.48133791757195 39.16918775071895)
N Rogers St N Rogers St between 8th and 11th May 20, 2019 to May 22, 2019
Lane shifts on N Rogers St between 8th and 11th. *This doesn't involve a lane or road closure, just shifting lanes east.
Planning & Transportation
LINESTRING(-86.5385548002777 39.17321349802239,-86.538608444458 39.169587008679684)
N Jordan Ave N Jordan Ave between 7th and 10th St May 20, 2019 to June 28, 2019
N Jordan Ave between 7th and 10th St will be Closed from 5/20-6/28/2019. A detour will be in place utilizing 7th St, Union St and 10th St.
Planning & Transportation
LINESTRING(-86.51563800645445 39.17150840591407,-86.51565946412656 39.17116738253114,-86.51579893899536 39.170834675197966,-86.51598132920836 39.17052691951341,-86.51611007524107 39.17021084470571,-86.51617444825744 39.16996962876516,-86.51615299058533 39.16888830576093)
E 10th st E 10th st between N Sunrise Dr and N Jordan Ave June 10, 2019 to June 15, 2019
Eastbound lane closure on E 10th st between n Sunrise Dr and n Jordan Ave. Flaggers and signage will be in place to direct traffic.
Planning & Transportation
LINESTRING(-86.51552387743935 39.17160273269977,-86.51248761683449 39.171552827009066)
Downtown Curb Ramp Improvements Project. Intersection of N Washington St and E 6th St. June 17, 2019 to July 8, 2019
Replace sidewalks, curbs and ramps. Temporary sidewalk closures, pedestrian detour in place.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.53242263838654 39.16756345982131,-86.53221879050139 39.16756138029882),LINESTRING(-86.53232741996649 39.16765703827039,-86.53232741996649 39.167467801722495))
4th St Parking Garage Demolition and Reconstruction S Walnut St (eastern turn lane), W 4th St (eastbound lane), and E 3rd (westbound lane) July 15, 2019 to October 1, 2020
The will be a one-lane closure on S Walnut St (eastern turn lane), W 4th St (eastbound lane), and E 3rd (westbound lane). The adjacent sidewalks will be closed as well. Signage will be in place to direct traffic.
Planning & Transportation
LINESTRING(-86.53419605285141 39.16559848623683,-86.53365156442139 39.16559432707555,-86.5336542466304 39.16461899696793,-86.53425506144974 39.16462523579628)

Please enable Javascript

To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.

This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.