Indiana University, North Student Housing Project. North Walnut Grove from East 13th Street to East 17th Street. November 1, 2019 to August 28, 2021
Indiana University will be closing North Walnut Grove due to the construction of the North Student Housing Project.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.52101310090174 39.175222108212836,-86.52109893159022 39.17799999281107),LINESTRING(-86.5210238297378 39.175014178304025,-86.52101310090174 39.17417413521264))
Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
14th Street (Madison to Woodburn) Sidewalk 14th Street between N. Madison Street and North Woodburn Avenue February 22, 2021 to September 27, 2021
Installation of a new sidewalk on the north side of West 14th Street from North Madison Street to North Woodburn Avenue.
Planning & Transportation
LINESTRING(-86.53603435828074 39.1760075241593,-86.53765499009847 39.176000358787235)
Maxwell Street Sidewalk Project S Maxwell Street from E Miller Drive to E Short Street. April 1, 2021 to July 29, 2021
installation of a new sidewalk on the east side of S Maxwell Street from E Miller Drive to E Short Street.
Planning & Transportation
LINESTRING(-86.51495496709633 39.144035515388765,-86.51496336266972 39.14685484453753,-86.51518164757745 39.146861355559594,-86.51518164757745 39.14673764603728)
E Gilbert Dr E Gilbert Dr from N Walnut St to N Lavern Dr May 1, 2021 to September 1, 2021 daily until September 1, 2021
E Gilbert Dr will be closed for sanitary sewer replacement.
Planning & Transportation
LINESTRING(-86.53331652707108 39.189363110139965,-86.53298272283654 39.18936728302555,-86.53242279315278 39.18920871319881)
3rd and Indiana Signal Replacement Project Intersection of 3rd Street and Indiana Avenue. May 17, 2021 to August 8, 2021
Lane restrictions will be in place for the construction of a new traffic signal at the intersection of 3rd Street and Indiana Avenue.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.5269181153549 39.16414542929107,-86.5269020221008 39.164444894442056),LINESTRING(-86.52713805649412 39.16431179897677,-86.52667135212552 39.164299321264))
S Walnut St S Walnut St from S Walnut St Pike to E Miller Dr May 27, 2021 07:00 am to 17:00 pm daily until July 31, 2021
The easternmost northbound lane of S Walnut St will be closed daily for Miller Pipeline to complete gas main replacement. The adjacent sidewalk will also be closed with a pedestrian detour in place.
Planning & Transportation
LINESTRING(-86.53041161370831 39.13764285058164,-86.53036869836407 39.138408436140026,-86.53260029626448 39.14686260999403)
N Fee Ln E 13th St to E 17th St May 29, 2021 to July 31, 2021
The northbound lane of N Fee Ln will be closed for utility work for IU. The southbound lane will remain open. The sidewalk along the east side of Fee will be closed also.
Planning & Transportation
LINESTRING(-86.51908196282936 39.1751652059084,-86.51886738610818 39.176479309772276,-86.51882447076395 39.1780262613274,-86.51895321679666 39.17900764305509)
17th and Dunn Signal Improvement Project Intersection of 17th Street and Dunn Street. June 1, 2021 to August 20, 2021
The intersection of 17th Street and Dunn Street will be closed to traffic for the 17th and Dunn Signal Improvement Project. Detour signage will be in place.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.5283516771851 39.17860103144571,-86.52834094834904 39.179274687751104),LINESTRING(-86.5289310343323 39.17897528574562,-86.52787960839846 39.179016869433724))
7-Line, 7th Street Protected Bike Lane 7th Street from the B-Line Trail to North Indiana Avenue. June 1, 2021 to October 30, 2021
Eastbound lane closed to through traffic.
Planning & Transportation
LINESTRING(-86.53697688912268 39.168565471661935,-86.52705066426013 39.16851254375996)
Jackson Creek Trail PH II. South High Street from East Arden Drive to East Rogers Road. June 16, 2021 to August 13, 2021
Installation of a multi-use trail on the eastern side of High Street. Temporary lane restrictions with flaggers.
Planning & Transportation
LINESTRING(-86.50819195014701 39.14723622448173,-86.50798533186855 39.136499467227935)
Jackson Creek Trail PH II East Arden Drive from South High Street to South Sycamore Court. June 21, 2021 to July 30, 2021
Construction of a multi-use path on the north side of the roadway. Lane restrictions with flaggers.
Planning & Transportation
LINESTRING(-86.50824688081224 39.14733657560936,-86.50485902650284 39.14735916041397)
Discovery Parkway East Discovery Parkway from IU Hospital to Old Range Road. June 28, 2021 to October 30, 2021
Multi-use trail construction. Westbound lane closed to through traffic.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.50080631205216 39.175586339267625,-86.50016470468856 39.17550344207967),LINESTRING(-86.50016470468856 39.17550344207967,-86.50002212527441 39.1755089685619,-86.49965141879764 39.17544265074639,-86.49929497026231 39.17542607128274,-86.4989599086391 39.17543159777108,-86.4988601030492 39.17537633286835,-86.49836820407042 39.175475809661975,-86.49819710877345 39.17553660096658,-86.49665012213008 39.175851609612295,-86.49627228668263 39.17584608315701,-86.49600851476647 39.17576318627525,-86.49586593535233 39.175669236357834))
South Henderson Street South Henderson Street from East Hillside Drive to South Walnut Street Pike July 6, 2021 to July 30, 2021
Milling/Paving 6:00 am till 4:00 pm weather permitting
Street
GEOMETRYCOLLECTION(LINESTRING(-86.52693565961783 39.15055670650972,-86.52693565961775 39.146969904267365,-86.52697564600456 39.14458204696044),LINESTRING(-86.52697564600456 39.144530360841685,-86.5269489884133 39.13943392317947,-86.5268556868441 39.13363407980103))
N Woodlawn Ave N Woodlawn Ave from E 9th St to E 10th St July 19, 2021 to July 30, 2021
N Woodlawn Ave will be fully closed for utility work. A detour route will be posted.
Planning & Transportation
LINESTRING(-86.52348078561418 39.17158963265729,-86.52345932794206 39.170491699076706)
Bore in Right of Way of 17th St between Jordan Avenues 17th Street between Jordan Avenue and Jordan Avenue July 26, 2021 09:00 am to 17:00 pm July 28, 2021
American Utility Corp will be closing the multi-use path and lane on the north side of 17th St between Jordan Ave and Jordan Ave to bore in the right of way. Flaggers will be present for lane closure and signage will be in place for multi-use path closure.
Planning & Transportation
LINESTRING(-86.51242938184664 39.1788379870261,-86.51092624429597 39.17887682698105)
East Caradon Hill East Caradon Hill from East Wexley Road to dead end. July 26, 2021 to July 27, 2021
Curb replacement from 6:00 am to 4:00 pm , weather permitting.
Street
LINESTRING(-86.51077740644074 39.13723014708157,-86.51127896598263 39.137067428511386,-86.51159726338422 39.13699635591448,-86.51191556078581 39.13703002189038,-86.51244846779909 39.13715720432077)
Hydrant replacement lane restriction E 4th Street from S Walnut to S Washington July 26, 2021 21:00 pm to 04:00 am July 27, 2021
CBU will close westbound lane of E 4th St from Walnut to Washington from 9pm Monday 7/26 to 4am Tuesday 7/27 to replace a fire hydrant.
Utilities
LINESTRING(-86.53317969032547 39.16561302279996,-86.53355604911106 39.16561302279996,-86.53237026115647 39.16561302279996)
Bus Stop / Ped Island Installation S. Woodcrest Dr, midblock between E. Third St. and E. 2nd St. July 27, 2021 to August 6, 2021
Contractor is working to install bus stops on the east and west side of the S. Woodcrest Dr. In addition the installation of a pedestrian island that will replace the turn lane in that section of road.
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.50245953419731 39.16241131475243,-86.50245391392116 39.161631276490624),LINESTRING(-86.50245391392116 39.161631276490624,-86.50246515447347 39.162406957020806))
Wylie Farm Road/ S Sweetbriar Dr Wylie Farm Road/ S Sweetbriar Dr from 6::00 am till 4: 00 pm, weather permitting July 27, 2021 to July 30, 2021
ADA ramp installation
Street
GEOMETRYCOLLECTION(LINESTRING(-86.52550208547639 39.14204151148775,-86.52550208547639 39.14204151148775,-86.52548819663323 39.14207598174053,-86.52553819646857 39.14206520978834,-86.52551041878228 39.14210183441904,-86.5254937521705 39.142028585138604),LINESTRING(-86.5254937521705 39.1420307395303,-86.5254854188646 39.14202212196312,-86.52551597431955 39.14208890808098,-86.5254937521705 39.1420307395303),LINESTRING(-86.5254937521705 39.14203504831346,-86.52547986332735 39.142028585138604))
S Walnut St S Walnut St from E Wilson St to E Driscoll St July 28, 2021 06:00 am to 18:00 pm
The right, northbound lane will be closed for utility work. One northbound lane will remain open, and southbound traffic will be unrestricted. The sidewalk on the east side of the S Walnut St will also be closed.
Planning & Transportation
LINESTRING(-86.53373054847118 39.15193906848478,-86.53373054847118 39.1524715424668)
E 19th St E 19th St from N Lincoln St to N Dunn St July 28, 2021 to July 30, 2021
The street will be fully closed for utility work.
Planning & Transportation
LINESTRING(-86.53088368249497 39.18112928842868,-86.53047598672471 39.181029490534655,-86.52868427110275 39.18099622453852)
South Henderson Street South Henderson Street from East Winslow Road to South Walnut Street Pike August 2, 2021 to August 5, 2021
Millling/Paving 6:00 am to 4:00 pm, weather permitting
Street
LINESTRING(-86.5269519907942 39.13597752509958,-86.52685396791362 39.133569820704196)
Bus Stop Improvements W. 3rd Street between Curry Pike and Patterson Dr. August 2, 2021 to August 11, 2021
This project will make access improvements to over 25 bus stops throughout the City. Some improvements will include better sidewalk access and loading zones and benches or shelters.
Public Works
LINESTRING(-86.58263782522191 39.16458328030518,-86.55171721327686 39.1643687490309)
South Stratford Drive/ East Cheyanne Lane South Stratford Drive/ East Cheyanne Lane Northeast and Southeast corners August 2, 2021 to August 3, 2021
ADA Ramp Repair 6:00 am to 4:00 pm, weather permitting.
Street
GEOMETRYCOLLECTION(LINESTRING(-86.50970783558859 39.139016981103765,-86.50967350362293 39.13897204558387,-86.50955119599533 39.13897370986291),LINESTRING(-86.50955119599533 39.13897370986291,-86.50955119599533 39.13897537414192),LINESTRING(-86.50954261300392 39.13896372418819,-86.50953832150822 39.13897204558387),LINESTRING(-86.50954046725607 39.13897204558387,-86.50954261300392 39.13896871702573),LINESTRING(-86.50952759276896 39.13893043859548,-86.50963917165731 39.138935431435385,-86.50957050772601 39.13887718161445),LINESTRING(-86.50957265347387 39.13887718161445,-86.50957265347387 39.13887718161445),LINESTRING(-86.50957479922172 39.13887718161445,-86.5095619247346 39.13887884589573))
N Madison St N Madison St from W 11th St to W 14th St August 2, 2021 to September 3, 2021
The street and sidewalks will be closed for bridge rehabilitation. This will be a 30 day full closure with a detour route posted.
Planning & Transportation
LINESTRING(-86.53854407144156 39.173451843732465,-86.5385655291137 39.17410059742869,-86.53770722222893 39.175614332776405,-86.53770722222893 39.175947017495645)
West 6th Street West 6th Street between N Maple St and N Fairview St August 3, 2021 to August 4, 2021
Tree and stump removal, from 6:00 am to 4:00 pm.
Street
LINESTRING(-86.54218116680961 39.16761904973964,-86.54091270577202 39.16760828214956)
Sweetbriar Subdivision South Sweetbriar Dr/South Sweetbriar Circle/ South Sweetbriar Court August 3, 2021 to August 5, 2021
ADA Ramp Repair, 6:00 am to 4:00 pm, weather permitting
Street
GEOMETRYCOLLECTION(LINESTRING(-86.52481288330857 39.14173487555331,-86.52474155927656 39.14173487555331,-86.5247189443396 39.14171328804622,-86.52472590278174 39.14166201769032),LINESTRING(-86.52472242356068 39.14166336691068,-86.52472590278174 39.14166606535136),LINESTRING(-86.52551046713367 39.141741621647895,-86.5254547995965 39.141741621647895,-86.52544784115436 39.14169304975229),LINESTRING(-86.52539565283827 39.14170249429017,-86.52539565283827 39.14173892321014,-86.52531563075358 39.141741621647895),LINESTRING(-86.52545827881758 39.14182392395011,-86.5254547995965 39.14177939976577,-86.52551916518634 39.141780748983905),LINESTRING(-86.52536192944152 39.140413758151624,-86.52523841709342 39.140377328545895,-86.52520014566163 39.14044748925119),LINESTRING(-86.52520014566163 39.14044748925119,-86.52519492683003 39.14043939378877),LINESTRING(-86.52582814506528 39.140621541468164,-86.52586467688653 39.140564873351735,-86.52580726973885 39.140541936244034),LINESTRING(-86.5258820729919 39.140639081590194,-86.52590816714996 39.14058106424682,-86.5259916684557 39.14061344602578),LINESTRING(-86.5259916684557 39.140612096785276,-86.5259968872873 39.14061074754477),LINESTRING(-86.5253654086626 39.140367883830265,-86.52525929241986 39.140335501938324,-86.52525233397772 39.140273436603906))
East Covenanter Dr and South Pickwick Place Southwest corner of East Covenanter Dr and South Pickwick Place August 9, 2021 to August 17, 2021
ADA Ramp replacement, weather permitting, 6:00 am to 4:00 pm Monday through Thursday.
Street
LINESTRING(-86.50471677277856 39.15496289562452,-86.50460222613432 39.15501453756511,-86.50463952039057 39.154915385005694)
Sweetbriar South Swetbriar Circle & South Sweetbriar Circle August 9, 2021 to August 11, 2021
ADA Ramp Replacement, weather permitting, 6:00 am to 4:00 pm
Street
GEOMETRYCOLLECTION(LINESTRING(-86.52554335969462 39.14174194003644,-86.52545354884968 39.14174603745397,-86.52545619034511 39.14167228390221),LINESTRING(-86.52545619034511 39.14167228390221,-86.52545090735423 39.141670235191384),LINESTRING(-86.5248222314396 39.14174398874522,-86.52474826956728 39.14173784261871,-86.52471921311744 39.14170096584823,-86.52472185461289 39.141657942924866),LINESTRING(-86.52472185461289 39.141657942924866,-86.524716571622 39.14165999163609),LINESTRING(-86.52532858931042 39.14039450438685,-86.52524406145635 39.14037196815491,-86.52520443902473 39.14044162557576),LINESTRING(-86.52520443902473 39.14044162557576,-86.52520443902473 39.14044162557576))
Kensington Place Kensington Place from Wexley Road to S Stratford Drive August 9, 2021 to August 18, 2021
Milling/Paving, weather permitting, 6:00 am to 4:00 pm Monday through Thursday
Street
LINESTRING(-86.51193812759409 39.13803585494438,-86.50946013957137 39.13809675465845)
Kensington Place Kensington Place from South Stratford Drive to Cul-de-sac August 9, 2021 to August 18, 2021
Milling/Paving, weather permitting, 6:00 am to 4:00 pm
Street
GEOMETRYCOLLECTION(LINESTRING(-86.50946918783738 39.13809008249993,-86.50865244778876 39.13809434839612),LINESTRING(-86.50865519775526 39.13809434839612,-86.50865519775526 39.13809434839612),LINESTRING(-86.5086441978893 39.13808794955176,-86.50865244778876 39.13809008249993))
South Wexley Rd/East Wexley Road South Wexley Rd/East Wexley Road from East Rock Creek Drive to South High Street August 9, 2021 to August 18, 2021
Milling/Paving, weather permitting, 6:00 am to 4:00 pm Monday through Thursday
Street
GEOMETRYCOLLECTION(LINESTRING(-86.51236157323885 39.139809028119345,-86.51233788165254 39.13930921588678,-86.5121767788658 39.13889025289927),LINESTRING(-86.51215782559673 39.138882902649186,-86.51216041971144 39.13824248354288,-86.51208460663531 39.13810282737478,-86.51192350384855 39.138018298506864,-86.51078156938937 39.1372391580762,-86.51004239189719 39.137073773384884,-86.50811863509064 39.137073773384884))
625/631 N Walnut 625/631 N Walnut August 9, 2021 to August 20, 2021
Sidewalk replacement, weather permitting, 6:00 am to 4:00 pm Monday through Thursday.
Street
LINESTRING(-86.5336303388399 39.172501649603674,-86.53360619895875 39.17279276170544)
Road Closure - E Hunter Ave E Hunter Ave between S Woodlawn Ave and S Faculty Ave August 10, 2021 09:00 am to 14:00 pm
Please be advised that on Tuesday 8/10/2021 at 9:00am CBU crews will close E Hunter Ave between S Woodlawn Ave and S Faculty Ave due to a water meter upgrade. Normal traffic flow is expected to resume at 2:00pm. Road signs are in place.
Utilities
LINESTRING(-86.52263953298471 39.16223958787586,-86.52103430990152 39.16222021626757)
Recover Forward Bus Stop Improvements S. Woodscrest Dr. between E. 2nd & 3rd Streets. Center turn lane is being removed. August 11, 2021 to August 13, 2021
This project will make access improvements to over 40 bus stops throughout the City. Some improvements will include better sidewalk access and loading zones and benches or shelters.
Public Works
LINESTRING(-86.50245284636082 39.16321444907041,-86.50244934150615 39.16239647998873)
South Wexley Rd/East Wexley Rd South Wexley Rd/East Wexley Rd from East Rock Creek to South High Street. August 12, 2021 to August 27, 2021
Milling/Paving, weather permitting, from 6:00 am to 4:00 pm
Street
GEOMETRYCOLLECTION(LINESTRING(-86.51235344043191 39.13983020565803,-86.51234164308356 39.13934524787581,-86.51233377818465 39.13929949696919,-86.51218041265622 39.1389182382579,-86.51215681795952 39.13825026801845),LINESTRING(-86.51216468285841 39.13825941833849,-86.51209389876836 39.138122163412675,-86.511932668341 39.138021509630335,-86.51077652820352 39.13723457509914,-86.51008048465134 39.13707291691651,-86.50953387417817 39.137079017232026),LINESTRING(-86.5095378066276 39.137079017232026,-86.50952600927927 39.137079017232026))
Jordan Avenue Closure (E 7th Street to the bridge located just south of 275 N Jordan Avenue/Neal-Marshall Black Culture Center Jordan Avenue between E 7th Street north of University Road August 13, 2021 09:00 am to 09:00 am August 14, 2021
Jordan Avenue from 7th Street to the bridge located just south of 275 N Jordan Avenue (Neal-Marshall Black Culture Center) will be closed for mural touch ups from 8/13-8/14 at 9:00 AM.
External Project
LINESTRING(-86.51617182486582 39.16880349112415,-86.51615739014244 39.167785080656415)
Jackson Creek Trail PH II East Arden Drive from East Queens Way to South Sycamore Court. August 16, 2021 to August 20, 2021
Road closed to through traffic for the installation of a raised cross walk. Detour in place.
Planning & Transportation
LINESTRING(-86.5054165414061 39.14730132660918,-86.5046052414929 39.147282187937236,-86.50443557801296 39.14718888683706,-86.50432452555334 39.147078839226594,-86.50428750806681 39.14671759477406,-86.50428750806681 39.14627979272069)
CBU Main Break W Coolidge Dr between S Brown Ave and S Milton Dr August 17, 2021 06:30 am to 15:00 pm
Please be advised that CBU crews have closed W Coolidge Dr between S Brown Ave and S Milton Dr due to water main repair. Normal traffic flow is expected to resume at 3:00pm. Cones are in place.
Utilities
LINESTRING(-86.54217658069012 39.141323061414255,-86.53996331666936 39.14124827928319)
East 11th Street East 11th Street from North Woodlawn Ave to North Walnut Grove Street August 17, 2021 to August 20, 2021
Resurfacing, weather permitting, from 6:00 am till 4:00 pm
Street
LINESTRING(-86.52080435008983 39.17340236631577,-86.52351835611327 39.17342924876465)
3913 August 19, 2021 17:00 pm to 19:00 pm
Jordan Avenue from 7th Street to the bridge located just south of 275 N Jordan Avenue (Neal-Marshall Black Culture Center) will be closed for a mural reveal event associated with IU Culture Fest on 8/19 from 5 PM - 7 PM.
External Project
Kensington Place Kensington Place from Wexley Rd to the end of the Cul-de-sac August 19, 2021 to August 27, 2021
Milling/Paving, weather permitting, from 6:00 am to 4:00 pm
Street
LINESTRING(-86.51194237088974 39.13803012948526,-86.50953341165865 39.13807803857986,-86.50864889124352 39.138093369483244)
Northeast corner of West 2nd St & South Adams Street Northeast corner of West 2nd St & South Adams Street August 23, 2021 to August 25, 2021
ADA Ramp
Street
LINESTRING(-86.55082882212389 39.16048196512591,-86.55082882212389 39.16039180624594,-86.55068221209838 39.16039180624594)
Please enable Javascript
To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.
This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.