Choose types

Allen St. Bridge

Bridge between S Morton and S Walnut (150-156 W Allen St)

January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)

Kirkwood Closure for Street Dining

E. Kirkwood Ave. Indiana to Dunn, Dunn to Grant, and Half block from Walnut to Alley.

March 21, 2022 to October 31, 2022
Kirkwood has been closed through October 31st to all East West traffic in the areas outlined. North/South roads are still passable and open during the duration of the temporary closure. Any questions please contact Department of Public Works @ 812-349-3410.
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53344102010841 39.1665727662801,-86.53288173397176 39.1665727662801),LINESTRING(-86.5298001770228 39.1665727662801,-86.52834164650959 39.16655576149904),LINESTRING(-86.52815521779738 39.16655576149904,-86.52700374633957 39.16653875671389))

Walnut Street Traffic Signals.

The intersection of 11th Street and Walnut Street and the intersection of 14th Street and Walnut Street.

April 1, 2022 to July 29, 2022
Lane restrictions will be in place for the construction of new traffic signals at 11th and Walnut and 14th and Walnut.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.53363370488768 39.175966543620945,-86.5333855020016 39.175966543620945),LINESTRING(-86.5337282583681 39.17330025069447,-86.53346823629695 39.17330025069447),LINESTRING(-86.53353915140727 39.17306202028945,-86.53349187466705 39.176113140986985))

Hidden River Project

4th & Grant

May 3, 2022 to July 31, 2022
4th street from Grant to the Taste of India parking lot remains closed. Grant closed from 4th street to the alley south of Soma and Trinity Church. Access to Soma and the Venue will still be open via Grant and the alley. This is for for sanitary and storm culvert construction (Hidden River Project)
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.53104123673921 39.16556598269074,-86.5298335207164 39.16556947672066,-86.53049145560712 39.16556947672066),LINESTRING(-86.52981098875553 39.16606561204634,-86.52982000158937 39.1655764645881))

17th Street Multi-Use Path East Project

East 17th Street from North Walnut Street to North Grant Street

May 9, 2022 to August 6, 2022
Temporary lane restrictions possible with flaggers in place.
Planning & Transportation
LINESTRING(-86.53342624591883 39.1790076068763,-86.53224114554412 39.17898655278853,-86.52965213245436 39.17899936305173,-86.52865508698788 39.178997228008,-86.52836313444797 39.17902925365681)

Curry Pike

Curry Pike and Woodyard Road Intersection

May 9, 2022 to October 7, 2022
Curry Pike, Smith Pike and Woodyard Road Intersection. Lane restrictions on Curry Pike. Woodyard Road, west of Curry Pike is closed.
Monroe County Highway Department
POINT(-86.5825252755342 39.190266765555606)

S Grant St

E 3rd St to E 4th St

May 11, 2022 to April 23, 2023
S Grant St will be closed to northbound traffic for the duration of the development project. Southbound remains open.
Planning & Transportation
LINESTRING(-86.52982079371706 39.164661792515574,-86.52982079371706 39.16552172880188)

Crosswalks Project

3rd and Grant intersection.

May 31, 2022 to August 31, 2022
Road and sidewalk construction work zone. Lane restrictions.
Planning & Transportation
LINESTRING(-86.53004510060686 39.164584942304856,-86.52957169071574 39.164579743278324)

Crosswalks Project

Intersection of 3rd and Patterson.

May 31, 2022 to August 31, 2022
Road and sidewalk construction work zone.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.55129479728153 39.16348685392569,-86.55122371874262 39.16340990709253),LINESTRING(-86.55120226107049 39.163483734461124,-86.55132430158068 39.163414066382984))

Crosswalks Project

11th and Blair.

May 31, 2022 to August 31, 2022
Road and sidewalk construction workzone. Lane restrictions possible with flaggers.
Planning & Transportation
LINESTRING(-86.54424947249863 39.17326849138044,-86.5437457933473 39.173273990983915)

N Walnut St

E 15th St to E 17th St

June 13, 2022 to August 12, 2022
There will be lane restrictions on N Walnut St for utility work.
Planning & Transportation
LINESTRING(-86.53348519149894 39.17892144641405,-86.53349631357625 39.1768867245616)

E 19th St

N Walnut St to N Lincoln St

June 20, 2022 to August 12, 2022
Lane restrictions will be in place for sidewalk construction.
Planning & Transportation
LINESTRING(-86.53362854403883 39.18145887212131,-86.53098465366067 39.18111318783954)

N Walnut St

E 14th St to E 17th St

June 22, 2022 to August 12, 2022
Lane restrictions will be in place for utility work.
Planning & Transportation
LINESTRING(-86.53351013374385 39.17601383440231,-86.5334897106066 39.178958561944455)

Hidden River Project

Alley East of Grant

July 1, 2022 to July 31, 2022
Alley east of Grant between Kirkwood and 4th remains closed for for sanitary and storm culvert construction (Hidden River Project)
External Project
LINESTRING(-86.52977517097028 39.16607306906232,-86.52917641773409 39.16606152122435)

CBU Water Main Replacement

20th from Dunn to Lincoln and Lincoln from 20th to 19th

July 11, 2022 to August 26, 2022
CBU crews will have 20th from Dunn to Lincoln and Lincoln from 20th to 19th closed for a water main replacement project from July 11 to Aug 26.
Utilities
LINESTRING(-86.52833827370313 39.18175593204384,-86.53090129650754 39.18182564134628,-86.53092827569496 39.181135516206695)

Dunn St Sidewalk Project

N Dunn St from 15th to 16th St

July 13, 2022 to September 10, 2022
The southbound lane of N Dunn St from 15th to 17th will be closed for the construction of a sidewalk and tree plot from 15th to 16th St. A detour will be in place to direct vehicular traffic. The northbound lane will remain open to northbound vehicles.
Planning & Transportation
LINESTRING(-86.52834309359234 39.17885144367111,-86.52834309359234 39.17686870194311)

Greenways Project

Graham, Ralston, and Bryan St intermittent lane closures

July 19, 2022 to July 31, 2022
Intermittent lane closures along Graham, Ralston and Bryan for traffic calming device installation
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.54504986539094 39.13999594122507,-86.53642273664414 39.13975228174726,-86.53615691474998 39.1370719718343),LINESTRING(-86.53850098054393 39.13838402440092,-86.54633064360826 39.138552715099934))

AMI ROOFING

200 N WALNUT ST

July 19, 2022 06:00 am to 20:00 pm August 1, 2022
METERS 206A&B, 208A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.5336731798706 39.1679371956545),LINESTRING(-86.5336731798706 39.167953831743915,-86.5336731798706 39.16822000863951),LINESTRING(-86.53371609521486 39.16822000863951,-86.53365172219848 39.16820337261308))

Periodic One Lane Road on W 17th St

W 17th between N Monroe and N Kinser Pike

July 20, 2022 07:00 am to 17:00 pm daily until August 3, 2022
CenterPoint Energy/Miller Pipeline will have periodic lane restrictions on W 17th to accommodate utility relocations. Flaggers will be on site. It is not anticipated that all days will require lane restrictions and INRoads will continue to be updated if the schedule does change. Crews on site will help accommodate the safe passage of pedestrians
Planning & Transportation
LINESTRING(-86.54459344113705 39.179022280488255,-86.53927573922073 39.17899852167122)

East 2nd Street

East 2nd St from South Swain to South High

July 28, 2022 to August 4, 2022
ADA Ramp replacements. Monday through Thursday 6:00 am to 4:00 pm , weather permitting.
Street
LINESTRING(-86.51519995633284 39.161033476415184,-86.51094787802 39.16101033990893,-86.51077630293018 39.16096406687353,-86.50846376911092 39.16098141926534)

W 6th St

N Morton St to N College Ave

July 29, 2022 07:00 am to 17:00 pm
W 6th St will be closed for construction activities.
Planning & Transportation
LINESTRING(-86.53607535753748 39.167588771656824,-86.53488800757066 39.16757273411707)

Hidden River Project

4th St from Lincoln to Grant

August 1, 2022 to September 9, 2022
4th street from Lincoln to Grant has the east-bound lane closed. This is for for sanitary and storm culvert construction.
Utilities
LINESTRING(-86.53105375565141 39.16559026344697,-86.52986351161559 39.16555033364432)

CBU Water Main Replacement

S Hawthorne Dr

August 1, 2022 to August 19, 2022
CBU and contractor Snedegar will be installing a water main under S Hawthorne Dr from Sheridan south to the dead end. We will also be working on the sidewalk on S Weatherstone Ln. All roads will remain open but there may be intermittent land restrictions.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.52046172354319 39.156030108946254,-86.52052947710494 39.155392144246576,-86.52046172354319 39.15487426334721,-86.52024878414903 39.154378895135295),POINT(-86.52023230522707 39.15406198028762))

Hidden River Project

Grant from Kirkwood to 4th

August 1, 2022 to October 7, 2022
Grant closed from Kirkwood to 4th, including south of Trinity Church. Access to Soma and the Venue will still be open via Grant and the alley. This is for for sanitary and storm culvert construction.
Utilities
GEOMETRYCOLLECTION(POINT(-86.52981761018945 39.16558824106721),LINESTRING(-86.52981761018945 39.16559850920021,-86.52980436652037 39.16608111113973,-86.5298131954849 39.166529483093086,-86.5298131954849 39.16608111113973,-86.5291951559639 39.16607426587976))

Lane and sidewalk closure on E 3rd

E 3rd, between S Woodlawn and S Faculty

August 1, 2022 to August 5, 2022
Snedegar construction will be replacing the northern sidewalk along E 3rd St between S Woodlawn Ave and S Faculty Ln the week of July 25th. It is expected that the northern-most lane will be closed on Monday, July 25th, and then periodic lane closures through the week as concrete is poured. The sidewalk will remain closed for the duration until the sidewalk has been fully poured. Pedestrians will be routed to the southern side of E 3rd St
Planning & Transportation
LINESTRING(-86.52113485005171 39.164273136382974,-86.52259161765366 39.16428551433171)

North Jefferson St

North Jefferson St from East 10th St to East 3rd St

August 1, 2022 to August 4, 2022
Resurface- 6:00 am to 4:00 pm weather permitting.
Street
LINESTRING(-86.50718813724828 39.17132768341605,-86.50715404984912 39.168222487002765,-86.5071029187504 39.16423177796227)

West Gourley Pike

West Gourley Pike from Arlington Road to North Monroe Street

August 2, 2022
Closed for vegetation removal from 10:30 am till approximately noon
Street
LINESTRING(-86.55104384964595 39.186469607009855,-86.55071726657773 39.18641244803828,-86.54672452519544 39.186396116895025)

East 7th St

East 7th Street from N Union to N Overhill

August 2, 2022 to August 4, 2022
Installation of speed cushions, 6:00 am to 4:00 pm, weather permitting
Street
LINESTRING(-86.50944233139434 39.16821263384003,-86.50346068846585 39.168220629594714,-86.50342974893346 39.167732886898904,-86.50147540180419 39.167692907839466,-86.50121757236762 39.16798075656047,-86.50102677858456 39.16824061897731)

South HIllsdale Court

South Hillsdale Court

August 3, 2022 to August 8, 2022
Resurfacing, 6:00 am to 4:00 pm, weather permitting.
Street
LINESTRING(-86.5030737425111 39.1651070211129,-86.50336259996557 39.16506222917198,-86.50344137927135 39.16513145306865,-86.5036041898366 39.16511516509908,-86.5036041898366 39.1650255811991,-86.50356742616056 39.16497671720555,-86.50348864685479 39.16496857320334,-86.50336785191931 39.16505001318316)

N Dunn St

E 6th St to E 7th St

August 3, 2022 to August 13, 2022
N Dunn St will be closed for construction work. A detour will be in place.
Planning & Transportation
LINESTRING(-86.52826656996298 39.16847969000335,-86.52827214826598 39.167562823440704)

CBU repair

E Kirkwood Ave just west of Washington St

August 4, 2022 08:00 am to 12:00 pm
Tomorrow at 8a, please be advised that CBU crews will close E Kirkwood Ave just west of N Washington St due to fire line repair. Washington will remain open as will access to the CVS parking lot. Normal traffic flow is expected to resume at noon.
Utilities
LINESTRING(-86.53240164788205 39.16658555792483,-86.53298210404225 39.166590980017645)

East Queensway Drive and South Montclair Ave

East Queensway Drive and South Montclair Ave Northeast, Southeast and Southwest corners.

August 8, 2022 to August 12, 2022
ADA replacement Monday through Thursday from 6:00 am till 4:00 pm, weather permitting.
Street
GEOMETRYCOLLECTION(LINESTRING(-86.50426905965709 39.14630884360565,-86.50426567825211 39.146261640341436,-86.50420650366515 39.14626426274583),LINESTRING(-86.50419635945023 39.14623279388661,-86.50426398754963 39.14622886027823,-86.50426229684714 39.14618559057135),LINESTRING(-86.50436204829377 39.14622886027823,-86.50430794581425 39.14623017148102,-86.50430625511176 39.14618165696035))

Intersection construction

Bottom Road at Simpson Chapel Road

August 8, 2022 to October 8, 2022
The intersection will be closed for the Sample Road reconstruction project.
Monroe County Highway Department
POINT(-86.5476877098442 39.26975809405894)

East 2nd Street

East 2nd Street from South Swain Ave to South High Street.

August 8, 2022 to August 24, 2022
Milling and Paving, Monday through Thursday from 6:00 am till 4:00 pm - weather permitting.
Street
LINESTRING(-86.51523849068263 39.16102661097901,-86.51094748099713 39.161015370646,-86.51078801779937 39.16098164963617,-86.50845405645018 39.16100413031114)

South High Street

South High Street from East 2nd Street to East 3rd Street

August 8, 2022 to August 18, 2022
Milling and Paving, Monday through Thursday from 6:00 am till 4:00 pm - weather permitting.
Street
LINESTRING(-86.50845814653132 39.16421303618779,-86.50843269345329 39.16102579915946)

Lane restriction for turn lane into IU Legacy Hospital Site on S Rogers (SB lane remains open)

Turn lane into IU Legacy Hospital Site on S Rogers

August 10, 2022 09:00 am to 15:00 pm August 12, 2022
Lane restriction of turn lane to enter into the IU Legacy Hospital Site on S Rogers. Turn lane into legacy hospital site will be eliminated with restriping work to eliminate confusion for motorists. Work to take place during standard hours; SB lane to remain open.
Planning & Transportation
LINESTRING(-86.53871463583106 39.16127670958227,-86.53871732143415 39.16058536930109)

W 1st Street Closure; Detour using W 2nd Street

W 1st Street (west of S Rogers and east of S Fairview)

August 10, 2022 to August 23, 2022
Road and sidewalk closure for overhead utility work on W 1st Street. Work will take place between 7:00 AM - 6:00 PM each day.
Planning & Transportation
LINESTRING(-86.53883834427305 39.15943892767601,-86.54093420669096 39.15943892767601)

One-Way Southbound traffic on N Woodlawn Avenue

N Woodlawn between E10th St and E 9th St

August 14, 2022 06:00 am to 17:00 pm daily until August 16, 2022
N Woodlawn Avenue, between E 10th St and E 9th St will be converted to one-way southbound traffic to accommodate IU move-in. The lane restriction will be in-place during move-in hours, as needed. IUPD will be providing traffic control and will be on-site to provide access to emergency vehicles if necessary
Planning & Transportation
LINESTRING(-86.52348372593451 39.171578257155005,-86.52347787822848 39.170467545689434)

South Anita Street

South Anita Street from East Hunter to East 2nd St

August 15, 2022 to August 18, 2022
Milling/Paving Monday through Thursday from 6:00 am till 4:00 pm, weather permitting
Street
LINESTRING(-86.51032908747753 39.16221911877477,-86.51031056009423 39.16099804816474)

South Anita

South Anita from E Dexter Street to dead end

August 15, 2022 to August 24, 2022
Milling/Paving Monday through Thursday from 6:00 am till 4:00 pm, weather permitting
Street
LINESTRING(-86.51033637145461 39.160131859251806,-86.51029947646737 39.15859274353113)

East Covenanter Dr

East Covenanter between S High St and S Nota Dr

August 16, 2022
Tree removal from 9:00 am till noon.
Street
LINESTRING(-86.50836108596101 39.15364107785879,-86.50773362007925 39.15359399023552,-86.50738277894108 39.15360445415453,-86.5069509744633 39.153766644700084,-86.50657989249021 39.15400731385304,-86.50593218577355 39.15443109883887,-86.50561507936018 39.15461944690222,-86.50470424178988 39.154985677804405,-86.5040228003484 39.15526296564806,-86.50380689810952 39.155346674971014,-86.50321991389754 39.155336211311095)

B-Town Neighboring Project Fall Welcome Event

900 Block of E. Hunter Ave.

August 16, 2022 12:00 pm to 22:00 pm
Block Party for off-campus IU Students
Public Works
LINESTRING(-86.5220394091961 39.162225758751816,-86.52108097453046 39.16222192816991)

WFHB's Block Rocker

E 4th Street between S Walnut St and S College Ave

August 20, 2022 15:00 pm to 23:00 pm
WFHB's Block Rocker; 4th Street Parking Garage remains open
Public Works
LINESTRING(-86.53428818646286 39.165586447711775,-86.53481604532796 39.16558977499042)

South Grant Street

South Grant Ave between East 1st Street to East Smith Street

August 22, 2022
Closed from 7:00 am to 1:00 pm for tree removal
Street
LINESTRING(-86.52987543987403 39.16280701299323,-86.52987241720231 39.161369723412946,-86.52987960690801 39.159343296134296)

East Saratoga Dr

East Saratoga Drive from East Morningside Drive to South Park Ridge Road.

August 25, 2022 to September 2, 2022
Milling/Paving from 7:00 am till 3:00 pm, Monday through Thursday, weather permitting.
Street
LINESTRING(-86.48034228422175 39.16634049380477,-86.47984468960281 39.16559420194693,-86.4797468021368 39.16547403556868,-86.47943682516109 39.16530959703417,-86.47913500547419 39.16529062333234,-86.47793588401545 39.165284298763964,-86.4775035477072 39.16531592160027,-86.47679386357856 39.16587248119262,-86.47641047100335 39.16616340831777,-86.47632074082614 39.16622665318573,-86.47613312318296 39.16629622247481,-86.47548054007615 39.16623930215249)

West 12th Street

The intersection of West 12th Street and North Lindbergh Drive & West 12th Street and North Illinois Street.

August 25, 2022 to September 2, 2022
ADA replacement from 7:00 am to 3:00 pm Monday through Thursday, weather permitting.
Street
GEOMETRYCOLLECTION(LINESTRING(-86.55252932356183 39.174339382642245,-86.55252526271553 39.17417568231221,-86.55252120186925 39.174254384441525,-86.55260241879499 39.174263828691124,-86.55252120186925 39.17425123635803,-86.55242374155837 39.17425123635803),LINESTRING(-86.55137604321638 39.1743141980009,-86.55137198237009 39.17423234785417,-86.55144101675698 39.174248088274425,-86.5512826437518 39.17425123635803))

West 13th Street and North Illinois Street

West 13th Street and North Illinois Street

August 25, 2022 to September 2, 2022
ADA Ramp replacement 7:00 am to 3:00 pm Monday through Thursday, weather permitting.
Street
LINESTRING(-86.55157848372231 39.17496127977867,-86.55152367229111 39.17486071778825,-86.551549250959 39.174914539716525,-86.55149809362321 39.17493861793423)

IU Student Involvement Fair

E 7th Street between N Woodlawn and N Indiana

August 25, 2022 16:00 pm to 22:00 pm
IU Student Involvement Fair
Public Works
LINESTRING(-86.5268970707052 39.16850645263992,-86.52347522025725 39.16848427547856)

Bloomington Pridefest

Kirkwood from Washington to Dunn, Grant from Kirkwood to 6th, People's Park

August 26, 2022 to August 28, 2022
Bloomington Pridefest
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.52783080338214 39.16666142085222,-86.52806340137245 39.16665595612352),POINT(-86.52783785180611 39.16666142085222),LINESTRING(-86.52783785180611 39.166994768499535,-86.5278237549582 39.1666668855805),POINT(-86.52808454664431 39.16700023320192),LINESTRING(-86.52808454664431 39.16700023320192,-86.52785194865399 39.167005697903875),POINT(-86.52784490023005 39.16701116260538),LINESTRING(-86.5280986434922 39.167005697903875,-86.52807749822036 39.16666142085222),POINT(-86.52819027300353 39.16654666146053),LINESTRING(-86.52817617615565 39.16654666146053,-86.52747838218471 39.16654666146053),POINT(-86.52747838218471 39.1665521261977),POINT(-86.52807749822036 39.16665595612352),LINESTRING(-86.5297902652399 39.16749751934006,-86.5297902652399 39.1665521261977),POINT(-86.5297902652399 39.167486590012174),LINESTRING(-86.52830304778672 39.1665521261977,-86.52830304778672 39.1665521261977,-86.52978321681594 39.1665521261977),POINT(-86.52831009621067 39.16654666146053),POINT(-86.53229950416564 39.16657398514221),POINT(-86.53115061106199 39.16657398514221),POINT(-86.53103783627883 39.16657398514221),POINT(-86.52979731366383 39.1665521261977),LINESTRING(-86.53229950416564 39.16658491461189,-86.53115765948594 39.16657398514221),LINESTRING(-86.53103078785487 39.16656852040671,-86.52979731366383 39.1665521261977))

Supermarket Pop-Up

9th Street between Walnut and College and Alleyway behind Switchyard Brewing

August 27, 2022 to August 28, 2022
Pop Up Market with various vendors.
Public Works
GEOMETRYCOLLECTION(POINT(-86.53361237536866 39.170466032364146),POINT(-86.53421352602267 39.17044229233525),POINT(-86.53422480767034 39.17002746527393),POINT(-86.53421030269477 39.17045978498888),LINESTRING(-86.53421030269477 39.17045978498888,-86.53421030269477 39.17045978498888,-86.53480500669298 39.17046728183911),LINESTRING(-86.53361237536866 39.17046478288913,-86.53421030269477 39.170461034463955),LINESTRING(-86.53422641933429 39.1700262157911,-86.53421191435872 39.17044354181064))