Choose types
Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
Kirkwood Closure for Street Dining E. Kirkwood Ave. Indiana to Dunn, Dunn to Grant, and Half block from Walnut to Alley. March 21, 2022 to October 31, 2022
Kirkwood has been closed through October 31st to all East West traffic in the areas outlined. North/South roads are still passable and open during the duration of the temporary closure. Any questions please contact Department of Public Works @ 812-349-3410.
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53344102010841 39.1665727662801,-86.53288173397176 39.1665727662801),LINESTRING(-86.5298001770228 39.1665727662801,-86.52834164650959 39.16655576149904),LINESTRING(-86.52815521779738 39.16655576149904,-86.52700374633957 39.16653875671389))
Curry Pike Curry Pike and Woodyard Road Intersection May 9, 2022 to October 7, 2022
Curry Pike, Smith Pike and Woodyard Road Intersection. Lane restrictions on Curry Pike. Woodyard Road, west of Curry Pike is closed.
Monroe County Highway Department
POINT(-86.5825252755342 39.190266765555606)
S Grant St E 3rd St to E 4th St May 11, 2022 to April 23, 2023
S Grant St will be closed to northbound traffic for the duration of the development project. Southbound remains open.
Planning & Transportation
LINESTRING(-86.52982079371706 39.164661792515574,-86.52982079371706 39.16552172880188)
Crosswalks Project Intersection of 3rd and Patterson. May 31, 2022 to August 31, 2022
Road and sidewalk construction work zone.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.55129479728153 39.16348685392569,-86.55122371874262 39.16340990709253),LINESTRING(-86.55120226107049 39.163483734461124,-86.55132430158068 39.163414066382984))
Crosswalks Project 3rd and Grant intersection. May 31, 2022 to August 31, 2022
Road and sidewalk construction work zone. Lane restrictions.
Planning & Transportation
LINESTRING(-86.53004510060686 39.164584942304856,-86.52957169071574 39.164579743278324)
Crosswalks Project 11th and Blair. May 31, 2022 to August 31, 2022
Road and sidewalk construction workzone. Lane restrictions possible with flaggers.
Planning & Transportation
LINESTRING(-86.54424947249863 39.17326849138044,-86.5437457933473 39.173273990983915)
CBU Water Main Replacement 20th from Dunn to Lincoln and Lincoln from 20th to 19th July 11, 2022 to August 26, 2022
CBU crews will have 20th from Dunn to Lincoln and Lincoln from 20th to 19th closed for a water main replacement project from July 11 to Aug 26.
Utilities
LINESTRING(-86.52833827370313 39.18175593204384,-86.53090129650754 39.18182564134628,-86.53092827569496 39.181135516206695)
Dunn St Sidewalk Project N Dunn St from 15th to 16th St July 13, 2022 to September 10, 2022
The southbound lane of N Dunn St from 15th to 17th will be closed for the construction of a sidewalk and tree plot from 15th to 16th St. A detour will be in place to direct vehicular traffic. The northbound lane will remain open to northbound vehicles.
Planning & Transportation
LINESTRING(-86.52834309359234 39.17885144367111,-86.52834309359234 39.17686870194311)
Hidden River Project 4th St from Lincoln to Grant August 1, 2022 to September 9, 2022
4th street from Lincoln to Grant has the east-bound lane closed. This is for for sanitary and storm culvert construction.
Utilities
LINESTRING(-86.53105375565141 39.16559026344697,-86.52986351161559 39.16555033364432)
CBU Water Main Replacement S Hawthorne Dr August 1, 2022 to August 19, 2022
CBU and contractor Snedegar will be installing a water main under S Hawthorne Dr from Sheridan south to the dead end. We will also be working on the sidewalk on S Weatherstone Ln. All roads will remain open but there may be intermittent land restrictions.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.52046172354319 39.156030108946254,-86.52052947710494 39.155392144246576,-86.52046172354319 39.15487426334721,-86.52024878414903 39.154378895135295),POINT(-86.52023230522707 39.15406198028762))
Hidden River Project Grant from Kirkwood to 4th August 1, 2022 to October 7, 2022
Grant closed from Kirkwood to 4th, including south of Trinity Church. Access to Soma and the Venue will still be open via Grant and the alley. This is for for sanitary and storm culvert construction.
Utilities
GEOMETRYCOLLECTION(POINT(-86.52981761018945 39.16558824106721),LINESTRING(-86.52981761018945 39.16559850920021,-86.52980436652037 39.16608111113973,-86.5298131954849 39.166529483093086,-86.5298131954849 39.16608111113973,-86.5291951559639 39.16607426587976))
East 2nd Street East 2nd Street from South Swain Ave to South High Street. August 8, 2022 to August 24, 2022
Milling and Paving, Monday through Thursday from 6:00 am till 4:00 pm - weather permitting.
Street
LINESTRING(-86.51523849068263 39.16102661097901,-86.51094748099713 39.161015370646,-86.51078801779937 39.16098164963617,-86.50845405645018 39.16100413031114)
South High Street South High Street from East 2nd Street to East 3rd Street August 8, 2022 to August 18, 2022
Milling and Paving, Monday through Thursday from 6:00 am till 4:00 pm - weather permitting.
Street
LINESTRING(-86.50845814653132 39.16421303618779,-86.50843269345329 39.16102579915946)
Intersection construction Bottom Road at Simpson Chapel Road August 8, 2022 to October 8, 2022
The intersection will be closed for the Sample Road reconstruction project.
Monroe County Highway Department
POINT(-86.5476877098442 39.26975809405894)
W 1st Street Closure; Detour using W 2nd Street W 1st Street (west of S Rogers and east of S Fairview) August 10, 2022 to August 23, 2022
Road and sidewalk closure for overhead utility work on W 1st Street. Work will take place between 7:00 AM - 6:00 PM each day.
Planning & Transportation
LINESTRING(-86.53883834427305 39.15943892767601,-86.54093420669096 39.15943892767601)
One-Way Southbound traffic on N Woodlawn Avenue N Woodlawn between E10th St and E 9th St August 14, 2022 06:00 am to 17:00 pm daily until August 16, 2022
N Woodlawn Avenue, between E 10th St and E 9th St will be converted to one-way southbound traffic to accommodate IU move-in. The lane restriction will be in-place during move-in hours, as needed. IUPD will be providing traffic control and will be on-site to provide access to emergency vehicles if necessary
Planning & Transportation
LINESTRING(-86.52348372593451 39.171578257155005,-86.52347787822848 39.170467545689434)
South Anita Street South Anita Street from East Hunter to East 2nd St August 15, 2022 to August 18, 2022
Milling/Paving Monday through Thursday from 6:00 am till 4:00 pm, weather permitting
Street
LINESTRING(-86.51032908747753 39.16221911877477,-86.51031056009423 39.16099804816474)
South Anita South Anita from E Dexter Street to dead end August 15, 2022 to August 24, 2022
Milling/Paving Monday through Thursday from 6:00 am till 4:00 pm, weather permitting
Street
LINESTRING(-86.51033637145461 39.160131859251806,-86.51029947646737 39.15859274353113)
B-Town Neighboring Project Fall Welcome Event 900 Block of E. Hunter Ave. August 16, 2022 12:00 pm to 22:00 pm
Block Party for off-campus IU Students
Public Works
LINESTRING(-86.5220394091961 39.162225758751816,-86.52108097453046 39.16222192816991)
East Covenanter Dr East Covenanter between S High St and S Nota Dr August 16, 2022
Tree removal from 9:00 am till noon.
Street
LINESTRING(-86.50836108596101 39.15364107785879,-86.50773362007925 39.15359399023552,-86.50738277894108 39.15360445415453,-86.5069509744633 39.153766644700084,-86.50657989249021 39.15400731385304,-86.50593218577355 39.15443109883887,-86.50561507936018 39.15461944690222,-86.50470424178988 39.154985677804405,-86.5040228003484 39.15526296564806,-86.50380689810952 39.155346674971014,-86.50321991389754 39.155336211311095)
WFHB's Block Rocker E 4th Street between S Walnut St and S College Ave August 20, 2022 15:00 pm to 23:00 pm
WFHB's Block Rocker; 4th Street Parking Garage remains open
Public Works
LINESTRING(-86.53428818646286 39.165586447711775,-86.53481604532796 39.16558977499042)
South Grant Street South Grant Ave between East 1st Street to East Smith Street August 22, 2022
Closed from 7:00 am to 1:00 pm for tree removal
Street
LINESTRING(-86.52987543987403 39.16280701299323,-86.52987241720231 39.161369723412946,-86.52987960690801 39.159343296134296)
East Saratoga Dr East Saratoga Drive from East Morningside Drive to South Park Ridge Road. August 25, 2022 to September 2, 2022
Milling/Paving from 7:00 am till 3:00 pm, Monday through Thursday, weather permitting.
Street
LINESTRING(-86.48034228422175 39.16634049380477,-86.47984468960281 39.16559420194693,-86.4797468021368 39.16547403556868,-86.47943682516109 39.16530959703417,-86.47913500547419 39.16529062333234,-86.47793588401545 39.165284298763964,-86.4775035477072 39.16531592160027,-86.47679386357856 39.16587248119262,-86.47641047100335 39.16616340831777,-86.47632074082614 39.16622665318573,-86.47613312318296 39.16629622247481,-86.47548054007615 39.16623930215249)
West 12th Street The intersection of West 12th Street and North Lindbergh Drive & West 12th Street and North Illinois Street. August 25, 2022 to September 2, 2022
ADA replacement from 7:00 am to 3:00 pm Monday through Thursday, weather permitting.
Street
GEOMETRYCOLLECTION(LINESTRING(-86.55252932356183 39.174339382642245,-86.55252526271553 39.17417568231221,-86.55252120186925 39.174254384441525,-86.55260241879499 39.174263828691124,-86.55252120186925 39.17425123635803,-86.55242374155837 39.17425123635803),LINESTRING(-86.55137604321638 39.1743141980009,-86.55137198237009 39.17423234785417,-86.55144101675698 39.174248088274425,-86.5512826437518 39.17425123635803))
West 13th Street and North Illinois Street West 13th Street and North Illinois Street August 25, 2022 to September 2, 2022
ADA Ramp replacement 7:00 am to 3:00 pm Monday through Thursday, weather permitting.
Street
LINESTRING(-86.55157848372231 39.17496127977867,-86.55152367229111 39.17486071778825,-86.551549250959 39.174914539716525,-86.55149809362321 39.17493861793423)
IU Student Involvement Fair E 7th Street between N Woodlawn and N Indiana August 25, 2022 16:00 pm to 22:00 pm
IU Student Involvement Fair
Public Works
LINESTRING(-86.5268970707052 39.16850645263992,-86.52347522025725 39.16848427547856)
Bloomington Pridefest Kirkwood from Washington to Dunn, Grant from Kirkwood to 6th, People's Park August 26, 2022 to August 28, 2022
Bloomington Pridefest
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.52783080338214 39.16666142085222,-86.52806340137245 39.16665595612352),POINT(-86.52783785180611 39.16666142085222),LINESTRING(-86.52783785180611 39.166994768499535,-86.5278237549582 39.1666668855805),POINT(-86.52808454664431 39.16700023320192),LINESTRING(-86.52808454664431 39.16700023320192,-86.52785194865399 39.167005697903875),POINT(-86.52784490023005 39.16701116260538),LINESTRING(-86.5280986434922 39.167005697903875,-86.52807749822036 39.16666142085222),POINT(-86.52819027300353 39.16654666146053),LINESTRING(-86.52817617615565 39.16654666146053,-86.52747838218471 39.16654666146053),POINT(-86.52747838218471 39.1665521261977),POINT(-86.52807749822036 39.16665595612352),LINESTRING(-86.5297902652399 39.16749751934006,-86.5297902652399 39.1665521261977),POINT(-86.5297902652399 39.167486590012174),LINESTRING(-86.52830304778672 39.1665521261977,-86.52830304778672 39.1665521261977,-86.52978321681594 39.1665521261977),POINT(-86.52831009621067 39.16654666146053),POINT(-86.53229950416564 39.16657398514221),POINT(-86.53115061106199 39.16657398514221),POINT(-86.53103783627883 39.16657398514221),POINT(-86.52979731366383 39.1665521261977),LINESTRING(-86.53229950416564 39.16658491461189,-86.53115765948594 39.16657398514221),LINESTRING(-86.53103078785487 39.16656852040671,-86.52979731366383 39.1665521261977))
Supermarket Pop-Up 9th Street between Walnut and College and Alleyway behind Switchyard Brewing August 27, 2022 to August 28, 2022
Pop Up Market with various vendors.
Public Works
GEOMETRYCOLLECTION(POINT(-86.53361237536866 39.170466032364146),POINT(-86.53421352602267 39.17044229233525),POINT(-86.53422480767034 39.17002746527393),POINT(-86.53421030269477 39.17045978498888),LINESTRING(-86.53421030269477 39.17045978498888,-86.53421030269477 39.17045978498888,-86.53480500669298 39.17046728183911),LINESTRING(-86.53361237536866 39.17046478288913,-86.53421030269477 39.170461034463955),LINESTRING(-86.53422641933429 39.1700262157911,-86.53421191435872 39.17044354181064))
East Moores Pike and South Sare Road East Moores Pike west of South Sare Road August 29, 2022 to September 2, 2022
Sidewalk repair, 7:00 am to 3:00 pm Monday through Thursday, weather permitting.
Street
LINESTRING(-86.49885835868334 39.150429781732896,-86.49843027323227 39.15044220865653)
E 10th St E 10th St east of N Jefferson St August 29, 2022 08:00 am to 15:00 pm daily until August 31, 2022
There will be lane restrictions in place while crews make repairs to the railroad overpass. The sidewalk along the northside of E 10th St will remain open.
Planning & Transportation
LINESTRING(-86.5072975189862 39.171451529176096,-86.50681185059543 39.17136116457203,-86.5065981565035 39.17175274368438,-86.50599592769896 39.17164731875323)
4th Street Festival Road Closures N. Dunn Street between 6th and 3rd streets September 2, 2022 to September 4, 2022
The 45th annual 4th Street Festival will take place this week with Road Closures affecting N. Dunn Street between 6th and 3rd streets in additionn to 4th street between Indiana Ave and S. Lincoln St.
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.52825577074063 39.16803428964653,-86.52819936257562 39.16453555622036,-86.52827833400664 39.16800804979357),LINESTRING(-86.52827833400664 39.16800804979357,-86.52831217890567 39.168025543029955),POINT(-86.53103105246016 39.166582336400694),LINESTRING(-86.53099720756114 39.166582336400694,-86.52701479110996 39.16654734920564))
4th Street Festival 4th Street from Lincoln to Indiana. Grant from Kirkwood to 3rd. Dunn St. from Kirkwood to 3rd. September 2, 2022 to September 4, 2022
4 th Street Festival
Public Works
GEOMETRYCOLLECTION(POINT(-86.52825959764164 39.165723395867474),POINT(-86.52824426396305 39.16508438365324),LINESTRING(-86.52825193080234 39.16555992817919,-86.52981213259932 39.165562900322385),LINESTRING(-86.52823659712374 39.165075467162666,-86.52823659712374 39.165075467162666,-86.52825350499867 39.165553950453756,-86.52825959764164 39.16572636800373),POINT(-86.5269332344432 39.165553983892465),POINT(-86.52824809738269 39.165553983892465),LINESTRING(-86.52694473470216 39.165553983892465,-86.52696006838076 39.165553983892465,-86.52824809738269 39.165553983892465),LINESTRING(-86.52824426396305 39.165556956035886,-86.52825193080234 39.165553983892465),POINT(-86.52983896653689 39.1651259939276),LINESTRING(-86.52981979943863 39.16555992817919,-86.52983513311722 39.165123021765936),POINT(-86.52981596601899 39.165556956035886),POINT(-86.52980446576005 39.166525868099626),POINT(-86.52983513311722 39.16555992817919),LINESTRING(-86.52980829917968 39.1655510117489,-86.53044848026101 39.165568844608345),LINESTRING(-86.52981979943863 39.16555992817919,-86.53044848026101 39.165568844608345),LINESTRING(-86.52980829917968 39.166528840202005,-86.52981596601899 39.165562900322385))
N Kinser Pike W Brookdale Dr to W Gourley Pike September 5, 2022 09:00 am to 15:00 pm daily until September 8, 2022
Lane restrictions will be in place with flaggers for work along the edge of the road.
Planning & Transportation
LINESTRING(-86.53773184356628 39.18315548741941,-86.53769141033898 39.18501502990668)
Road Reconstruction Simpson Chapel Road and Sample Road Intersection September 6, 2022 to November 15, 2022
The intersection will be closed for the Sample Road reconstruction project.
Monroe County Highway Department
POINT(-86.52757760787836 39.27335228110397)
West 12th Street West 12th Street between North Illinois Street and North Monroe Street September 6, 2022 to September 8, 2022
Milling/Paving weather permitting from 6:00 am till 4:00 pm
Street
LINESTRING(-86.5472110311108 39.1741625299247,-86.54764341226803 39.17421151988691,-86.54810240149648 39.17423214722919,-86.54940287097708 39.174242460898085,-86.55069336243096 39.17423730406384,-86.55138517228252 39.174234725646556)
Grant St Road Closure for Poplars Building Demolition N Grant St between E 7th St and E 6th St September 6, 2022 to September 19, 2022
Renascent Inc will close N Grant St between E 7th St and E 6th St from 9/6-9/19/22 to accommodate equipment for the demolition of the Poplars Building. This closure was originally planned to start on August 29th, however was moved to better accommodate the 4th St Arts Festival
Planning & Transportation
LINESTRING(-86.52979962019893 39.16849578063636,-86.52979598242725 39.1680360645463)
West 12th St West 12th from N Monroe Street to N Lindbergh Dr September 6, 2022 to September 15, 2022
Milling/Paving, weather permitting, from 6:00 am to 4:00 pm Monday through Thursday
Street
LINESTRING(-86.55251732861659 39.17424889591905,-86.54807246690979 39.174235409485846,-86.54767669155233 39.17421855144076,-86.54721132931884 39.17415111921997)
North Summit Street North Summit Street between West 13th Street and West 12th Street September 6, 2022 to September 21, 2022
Milling and Paving
Street
LINESTRING(-86.54809624317068 39.17499907898335,-86.54807533914307 39.174237429308675)
Go Bloomington Launch Event Southbound lane of N. Morton in front of City Hall Plaza. September 6, 2022 14:00 pm to 15:00 pm
Go Bloomington Launch Event with OOTM, Common Council, Staff, and Public
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53613230396672 39.16992786910879,-86.53612949436017 39.16953578826593,-86.53612949436017 39.169923512667),LINESTRING(-86.53612949436017 39.169923512667,-86.53612949436017 39.169923512667),LINESTRING(-86.53613230396672 39.169925690887936,-86.53612949436017 39.169921334446))
Gentry Estates East Carrington Ct, East Whitley Dr, South Maria Ct and South Anthony Ct September 6, 2022 to September 7, 2022
Milling/Paving Monday through Thursday from 7:00 am till 4:00 pm, weather permitting.
Street
GEOMETRYCOLLECTION(LINESTRING(-86.47544125219989 39.15793883095162,-86.47441886231073 39.157965256598686,-86.4744324941759 39.15848319727769,-86.47441886231073 39.15797054172691,-86.47411896127656 39.157965256598686,-86.47385313990539 39.15798111198217,-86.47356005480384 39.15809738468519,-86.47338965648896 39.15830878910748,-86.47333512902821 39.15852547798113,-86.47336004126791 39.15924986157435,-86.4733623927586 39.159318236465595),LINESTRING(-86.4733623927586 39.159318236465595,-86.4733487608934 39.159318236465595,-86.47337602462378 39.159249531083816),LINESTRING(-86.47337602462378 39.159249531083816,-86.473355576826 39.15924424605166),LINESTRING(-86.473355576826 39.15924424605166,-86.473355576826 39.15925481611558),LINESTRING(-86.47228547540867 39.15904869958314,-86.47229229134128 39.158536048152996),LINESTRING(-86.47343028094934 39.153736275504656,-86.47326539288446 39.15360550619769,-86.47309300990754 39.15355901038552,-86.47231728651136 39.153564822363734,-86.47218237809463 39.15360260021032))
Culvert Replacement Howard Road, 8890 block September 6, 2022 to September 16, 2022
This block will be closed for a culvert replacement.
Monroe County Highway Department
POINT(-86.66321942755886 39.18840241048241)
South Millstone Way/South Mill Stone Court South Millstone Way/South Mill Stone Court Northwest and Southwest corners September 6, 2022 to September 16, 2022
ADA/Sidewalk replacement, weather permitting, from 6:00 am to 4:00 pm
Street
LINESTRING(-86.50778992783276 39.12546182419928,-86.50780368713934 39.12547097334419,-86.50771720006932 39.125487746773445,-86.50773489060636 39.12553196761331,-86.50769361268658 39.12543437675737)
South Mill Stone Way/South Sare Road South Mill Stone Way/South Sare Road Northwest and South West Corners September 6, 2022 to September 15, 2022
ADA/Sidewalk replacement, weather permitting from 6:00 am to 4:00 pm
Street
GEOMETRYCOLLECTION(LINESTRING(-86.50868093451001 39.12380408232764,-86.50865411241988 39.12377599131011,-86.50869032224156 39.12375414273322),LINESTRING(-86.50868361671903 39.123756223550345,-86.508678252301 39.12375518314178),LINESTRING(-86.5086420424793 39.12382801170406,-86.50861387928464 39.12379471865634,-86.50857498725392 39.12381552681302))
Old SR 37 South ditching Rogers Road to Chumley Road September 6, 2022 to September 22, 2022
There will be lane restrictions during the hours of 7:00 and 3:00 with traffic control.
Monroe County Highway Department
LINESTRING(-86.5409812974154 39.06389956007871,-86.54095426244263 39.0612336359477,-86.54100833238819 39.059386322385535,-86.54114350725212 39.056699234557215)
South Mills Stone Court/ South Sare Rd South Mills Stone Court/ South Sare Rd Northwest and Southwest corners September 6, 2022 to September 15, 2022
ADA/Sidewalk replacement, weather permitting, from 6:00 am to 4:00 pm
Street
GEOMETRYCOLLECTION(LINESTRING(-86.5073544396919 39.12450539379054,-86.5073253195073 39.124469514342735,-86.50736643035613 39.124446923569934),LINESTRING(-86.50731675474714 39.1245266556769,-86.50728420865848 39.12448944737156,-86.50723624600153 39.12452001133812))
Smith Road Resurfacing N. Smith Road from E. 3rd Street to E. 10th Street. September 7, 2022 to November 21, 2022
N. Smith Road will be milled and resurfaced from 3rd Street to 10th Street. Lane closures will be in place during construction.
Planning & Transportation
LINESTRING(-86.48254765259328 39.17257422238532,-86.48168230358236 39.17194063031761,-86.48136981643952 39.1711206791677,-86.48127366654943 39.16566030611847,-86.48120155413184 39.1642811687376)
E 14th St N Washington St to N Dunn St September 8, 2022 to January 31, 2023
E 14th St will be closed to eastbound traffic. It will be one way westbound. The sidewalk along the southside of E 14th St remains closed.
Planning & Transportation
LINESTRING(-86.53222109056831 39.175965418887955,-86.52839813958934 39.175985999357806)
N Walnut St E 19th St to SR 45/46 Bypass September 12, 2022 to September 16, 2022
The right lane will be closed for construction activities.
Planning & Transportation
LINESTRING(-86.53400319340844 39.182895948354144,-86.53433438803621 39.18449786245219)
Full-depth patching 2850 block of Bolin Lane September 12, 2022 to September 13, 2022
Crews will be performing full-depth patching in the 2800 block of Bolin Lane. Lane restrictions will apply between 7:00 am and 3:00 pm.
Monroe County Highway Department
LINESTRING(-86.57309643377641 39.1007797193773,-86.57281820310601 39.10040957407858)
Pipe Replacement Old SR 37 South at Chumley Road intersection September 12, 2022 to September 13, 2022
Crews will be replacing a pipe at this intersection. There will be lane restrictions during the hours of 7:00 am to 3:00 pm. Weather permitting.
Monroe County Highway Department
POINT(-86.54112143805513 39.05662611543684)

Please enable Javascript

To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.

This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.