Choose types
Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
Hopewell Project South Morton Street from West 1st Street to West 2nd Street. August 7, 2023 to August 31, 2024
South Morton Street from West 1st Street to West 2nd Street will be closed to through traffic. Detour in place.
Engineering
LINESTRING(-86.53630036983884 39.159437140754676,-86.53628425635348 39.16133312709155)
DG & G Properties Façade Work 204 N Walnut St October 9, 2023 to December 31, 2024
Safety scaffold with protected covered pedestrian walkway.
Engineering
LINESTRING(-86.53357452050301 39.16792389928645,-86.53357452050301 39.16779496943562)
AEG Fiber Installation 203 E 19th St November 17, 2023 to July 27, 2024
BLN01a-F02_E 19th St, Underground and aerial fiber placement and excavations along N Dunn St, N Walnut St, E 20th St, E 17th St, N Lincoln St, and nearby alleys and easements. This permit was taken to the Board of Public Works on 12/5/2023 and then extended on 5/21/2024. Substantial completion is expected on July 27th, 2024.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.52829675313262 39.17856436940852,-86.52829675313262 39.178997345130966,-86.52829675313262 39.180988999109246,-86.53041924200095 39.18103229530823,-86.53094427872102 39.18111888762621,-86.53093310772697 39.18064262855748,-86.53091076573888 39.18219262350743),LINESTRING(-86.53198318116706 39.178997345130966,-86.52827441114454 39.178997345130966),LINESTRING(-86.52825206915647 39.180997658351174,-86.52829675313262 39.1835434292241),LINESTRING(-86.5322289430361 39.17993256359108,-86.53199435216118 39.181266094321956,-86.53235182397059 39.18134402715373,-86.53236299496463 39.1821839644127),LINESTRING(-86.53389342114862 39.18226189622692,-86.53448548383294 39.18527519345258,-86.53441845786868 39.18605447343563))
Lane, Alley, and Sidewalk Closure for AEG Fiber Installation 801 N Lincoln December 22, 2023 to August 16, 2024
BLN01b-F09_N Lincoln St; Aerial and underground fiber placement and excavations along W 11th St, E 12th St, E 11th St, E Cottage Grove, N Walnut St, N Lincoln St, N Grant St, and N Indiana Ave, and nearby alleys and easements. This permit was taken to the Board of Public Works on 12/19/2023 and extended on 5/21/2024. Substantial completion is expected on August 15th, 2024.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.52662696313247 39.17434205096151,-86.52696625436285 39.17434609754406,-86.52699235368826 39.17346393704048,-86.52979542123762 39.17349226346718),LINESTRING(-86.52828147173301 39.174364461507366,-86.52829742122688 39.17169549793499),LINESTRING(-86.53352865734887 39.17442006091923,-86.5309831482375 39.174398750480464,-86.52973425687799 39.174388295036096,-86.52731033332547 39.17436800247569),LINESTRING(-86.53100372232426 39.174404443390216,-86.53102386808241 39.173503826682605,-86.52976140057012 39.173493414861326,-86.52972782430649 39.17438882585773))
Clear Creek Culvert Reconstruction East-west alley behind Von Lee February 5, 2024 to May 31, 2024
Milestone contractors will be performing work to reconstruct the Clear Creek culvert that spans from the east-west alley behind the Von Lee across Indiana Ave. The project will include alleyway, sidewalk, and lane restrictions in the surrounding area and a road closure on Indiana during the final phase of the project.
Utilities
LINESTRING(-86.5282202051962 39.166693654783074,-86.528218241545 39.16704533797687,-86.52697525032963 39.16704533797687,-86.52696346842237 39.16667081815129)
Road Improvements/Expansion by Crider & Crider The 45/46 Bypass between Arlington and N Kinser Pike March 9, 2024 to November 6, 2024
Crider and Crider will be working on multiple projects on 45/46 between Arlington Road and N Kinser Pike. This will include lane restrictions temporary closing of the N Monroe Street intersection on the South side, and other possible changes.
External Project
LINESTRING(-86.55129909883534 39.18708881369716,-86.53779354307697 39.1865871937342)
Adams St Sidewalk Project Along the westside of Adams St and at the intersection of 8th St and Fountain Dr, new sidewalk being installed. March 18, 2024 to June 24, 2024 daily until June 24, 2024
Along the westside of Adams St between Kirkwood Ave and Fountain Dr there will be new sidewalk added. Also, at the S/W corner of 8th St and Fountain Dr, new sidewalk will be added here as well. There is a 60 total day lane closure of the southbound lane of Adams St between Kirkwood Ave and Fountain Dr. The detour will be along 11th St, Rogers St and Kirkwood Ave. The project is scehedule for a total of 90 days.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.54963774306117 39.16673030870902,-86.54966231493518 39.169733898511765),LINESTRING(-86.5498670784689 39.16977199815628,-86.54995717429878 39.16982279771074),LINESTRING(-86.55031755824314 39.16984184754179,-86.55022746241326 39.16996884620275,-86.55034213011714 39.170032345447254))
1st Street Reconstruction Project 1st Street between South College Ave to South Rogers Street March 18, 2024 to July 31, 2024
Closure of 1st Street between South College Ave to South Rogers Street. A detour route is set in place.
Engineering
LINESTRING(-86.53860272873037 39.15942790212222,-86.53504216360619 39.15940182915014)
B-Line Extension Project, from Adams St along Fountain, up Crescent Rd to 17th St. Adams St along Fountain Dr., up Crescent Rd. to 17th St. April 1, 2024 to November 15, 2024 daily until November 15, 2024
B-Line Extension Project. This project runs from Adams St along the north side of Fountain Dr., up the east side of Crescent Rd to 17th St. There will be lane restrictions throughout the project.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55154570965307 39.170728870443895,-86.55521901332583 39.17334679210555,-86.55670122308807 39.175225240685876),LINESTRING(-86.55673989032744 39.17525521592228,-86.55652078039554 39.17572481971655,-86.55659811290778 39.17904193408043))
MCGOVERN CONSTRUCTION 100 N GRANT ST May 1, 2024 07:00 am to 19:00 pm May 31, 2024
METERS 109A&B, 111A
Public Works
GEOMETRYCOLLECTION(POINT(-86.52981079888916 39.166890933687256),POINT(-86.52981079888916 39.166890933687256),LINESTRING(-86.52981079888916 39.166890933687256,-86.52981079888916 39.16722365967763),LINESTRING(-86.52981079888916 39.16722365967763,-86.52976788354492 39.16724029593584))
Duke Energy lane restriction S Woods Edge Bend May 5, 2024 to May 31, 2024
Lane restrictions for equipment replace and cable burial.
External Project
LINESTRING(-86.51772141628808 39.12656485004962,-86.51758160398511 39.126546150057266,-86.51714288262062 39.126568590047526,-86.51693557472312 39.126553630054815,-86.51669451902836 39.126486310048335,-86.5164438211058 39.12632922978301,-86.51628954546116 39.12612352890582,-86.5162461554361 39.12598888800639,-86.51620276541102 39.12548398234128)
Smith and SR 46 Intersection Improvement Smith Rd north of SR46 May 6, 2024 to July 7, 2024
Smith rd and SR 46 intersection improvements. This includes new storm pipe, sidewalk, curbs, and widening of the intersection. This is part of INDOT's project R-41465. Closures include road and sidewalk closures that will be completed in two phases: north of SR 46 and south of SR 46. Road closures will be in place on Smith at the intersection for both with planned detours to be used. Private access to homes and business to be maintained as soft closures. 11,797 sq ft of pavement excavations, 80 sq ft of non pavement excavations, 87 sq ft of new sidewalk construction, and 2 residential driveway installations are included in the work
Indiana Department of Transportation
LINESTRING(-86.48122453952156 39.16431837266765,-86.48123593654971 39.16465857895665)
Gilliatte Construction 200 S Grant St May 9, 2024 to May 31, 2024
meters 204A&B, 206A
Public Works
GEOMETRYCOLLECTION(POINT(-86.52985371423338 39.16411261022458),POINT(-86.52985371423338 39.16411261022458),LINESTRING(-86.52981079888916 39.16407933622469,-86.52976788354492 39.163763232440715))
Hawthorne, Weatherstone and Miller Greenway Hawthorne Drive from E 3rd Street to the dead end of Hawthorne south of E Southdowns Drive. May 12, 2024 to September 30, 2024
Lane restrictions will be through out the areas while bumpouts, curbs, sidewalk and speed cushions are installed.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.5200455025946 39.164200171847,-86.52019744926322 39.163664668829824,-86.52018363592971 39.15728115895075,-86.52043227593292 39.156638491637295,-86.52049276929516 39.15515020710811,-86.52048752926696 39.15507464332029,-86.52005931592811 39.1538428205175,-86.52065328926909 39.154078475243494,-86.52257334262717 39.15408918680319,-86.52062566260207 39.154078475243494,-86.52003168926109 39.153832108920284,-86.51909238258231 39.15377855090978,-86.51878848924507 39.15373570447204,-86.51863654257644 39.153650011518295,-86.51844315590728 39.15333937368618,-86.51844315590728 39.15292161719805,-86.51867798257696 39.15245029920848,-86.51913382258284 39.15212894422382),LINESTRING(-86.51880901069448 39.15054882520752,-86.51883714449167 39.15079972566309,-86.5189309238156 39.150966992136546,-86.51919350592264 39.15115607549737,-86.5194373321649 39.151345158350125,-86.51951235562406 39.15153060450075,-86.5194748438945 39.15177422909312,-86.51935761973957 39.15196694645681,-86.5191231714297 39.152134210155964,-86.51925446248322 39.152268748060266,-86.51899656934236 39.152025125179875),LINESTRING(-86.51899656934236 39.152025125179875,-86.51899188037618 39.15202148901108),LINESTRING(-86.52694272960544 39.14690660289688,-86.52659974331263 39.14701208403028,-86.52600838763533 39.147002911764076,-86.52525145236842 39.146966222687325,-86.52431119684155 39.1469295335915,-86.52257261115034 39.14686991376993,-86.52086950679977 39.14686532762772,-86.5187761077022 39.1468515691993),LINESTRING(-86.5187761077022 39.1468515691993,-86.51878202125896 39.1468515691993))
1st Street Reconstruction Project West 1st Street Between South Fairview Street to South Rogers Street May 13, 2024 to November 1, 2024
Closure of 1st Street between South Fairview Street to South Rogers Street. A detour route is set in place.
Engineering
LINESTRING(-86.53873635585423 39.15942941125837,-86.54245334738789 39.159439631532734)
AMRIT INDIA 100 E 6TH ST May 15, 2024 10:00 am to 22:00 pm May 22, 2024
104B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53356589151002 39.166874297346425),POINT(-86.53356589151002 39.166874297346425),LINESTRING(-86.53352297616577 39.166874297346425,-86.53356589151002 39.167273568440464))
Pavilion Properties Construction Closure 401 S Woodlawn May 15, 2024 to June 1, 2024
Road closure on S Woodlawn From E Atwater to the east/west alley. Sidewalk closure in the east sidewalk of S Woodlawn.
External Project
LINESTRING(-86.52262702738788 39.163067771569615,-86.5226297095969 39.16270799026685)
Lane Closure on N Kinser Pike for Sanitary Manhole Replacement N Kinser Pike northbound near W Brookdale Dr May 16, 2024 to May 21, 2024
The northbound lane will be closed to allow equipment to replace a sanitary manhole at the northeast corner of W Brookdale Rd and N Kinser Pike. UPDATE: Due to weather delays, the lane closure will be paused until Monday May 20th.
Engineering
LINESTRING(-86.53771511714368 39.18320040215687,-86.53771097897173 39.18291331955734)
OMEGA PROPERTIES 600 N COLLEGE AVE May 20, 2024 to August 14, 2024
METERS 600A&B, 602A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53478897882079 39.17198146914913),POINT(-86.53485335183716 39.17191492857873),POINT(-86.53485335183716 39.17191492857873),POINT(-86.53485335183716 39.17191492857873),LINESTRING(-86.53485335183716 39.17219772556811,-86.53485335183716 39.17219772556811),LINESTRING(-86.53485335183716 39.17209791499582,-86.53485335183716 39.17209791499582),LINESTRING(-86.53485335183716 39.1719481988718,-86.53478897882079 39.17191492857873))
OSIEL DE SANTIAGO 100 N WALNUT ST May 20, 2024 to June 3, 2024
METERS 102A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53360880685425 39.166907570024165),POINT(-86.53360880685425 39.166907570024165),LINESTRING(-86.53360880685425 39.166890933687256,-86.53360880685425 39.16714047832761),LINESTRING(-86.53360880685425 39.16714047832761,-86.53358734918213 39.16712384204581))
CFC 100 S WALNUT ST May 21, 2024 06:00 am to 17:00 pm
METERS 104A&B, 102A&B, 100A
Public Works
GEOMETRYCOLLECTION(POINT(-86.53358734918213 39.1662421134788),POINT(-86.53358734918213 39.1662421134788),LINESTRING(-86.53358734918213 39.166208840486235,-86.53356589151002 39.16647502398584))
CFC 100 S COLLEGE AVE May 21, 2024 06:00 am to 17:00 pm
METERS 10A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.5348962671814 39.16637520529153),POINT(-86.5348962671814 39.16637520529153),POINT(-86.53485335183716 39.16682438830031),POINT(-86.53485335183716 39.16682438830031),LINESTRING(-86.53478897882079 39.16677447921876,-86.53481043649292 39.16712384204581))
QIXUAN WANG 100 S MADISON ST May 21, 2024 08:00 am to 12:00 pm
METERS 105B & 107A
Public Works
GEOMETRYCOLLECTION(POINT(-86.53740681481933 39.16542692063044),POINT(-86.53740681481933 39.16542692063044),LINESTRING(-86.53744973016359 39.16539364725227,-86.53738535714722 39.16517736991051))
CBU emergency closure to repair drinking water valve 4th St between College and Walnut May 21, 2024 22:00 pm to 06:00 am May 22, 2024
Please be advised that at 10pm tonight Tuesday 5/21/24, CBU crew will close 4th St between College and Walnut as well as one lane of Walnut due to an emergency road repair. Normal traffic flow is expected to resume no later than 6am Wednesday 5/22/24. Road signs will be in place.
Utilities
LINESTRING(-86.53370040776576 39.165589312902114,-86.53481780506412 39.165600008516975)
CBU emergency lane closure to repair drinking water valve one lane of Walnut between Kirkwood and 3rd May 21, 2024 22:00 pm to 06:00 am May 22, 2024
Please be advised that at 10pm tonight Tuesday 5/21/24, CBU crew will close 4th St between College and Walnut as well as one lane of Walnut due to an emergency road repair. Normal traffic flow is expected to resume no later than 6am Wednesday 5/22/24. Road signs will be in place.
Utilities
LINESTRING(-86.53358850841481 39.16651489389466,-86.5336198464964 39.164750920832034)
CFC 100 W 5TH ST May 21, 2024 06:00 am to 17:00 pm
METERS 101A&B, 103A&B, 105A, 107A&B, 117A&B, 121B, 123A&B, 125A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53390921426391 39.16654156970333),POINT(-86.53393067193603 39.166558206122886),LINESTRING(-86.53390921426391 39.16659147895015,-86.5344456560669 39.166574842538495),LINESTRING(-86.5344456560669 39.166574842538495,-86.53442419839477 39.16650829685244))
Lane Closure at 2038 N Walnut St for Repaving 2038 N Walnut St in the eastern lane May 22, 2024 to May 23, 2024
The eastern lane on N Walnut St in front of 2038 N Walnut St will be closed during the day while the lane is mill and repaved.
Engineering
LINESTRING(-86.53426200148884 39.184028655267866,-86.5343571164039 39.184574823936345)
BSM Lane Closure 500 S Liberty Drive May 23, 2024 to July 23, 2024
UG Duct placement by directional bore, place 1-2" duct and fiber optic cable at a minimum depth of 48" as well as placing 2 vaults. Boring along and under Liberty Dr approx. 878' within the ROW. (See Plans); The work will primarily be in the tree plot area across from 500 S Liberty Dr, but will include temporary lane closures during the duration of work. The work is expected to take 2 days.
External Project
LINESTRING(-86.57912577782346 39.16456537141559,-86.5791543460415 39.16366552411955)
Road Closing North Dunn St Closing Both lanes of the 1200 Block N Dunn St between E 15th & E 16th St 8am-2pm Friday 5/24 - Emergency Service Repair. May 24, 2024
Closing Both lanes of the 1200 Block N Dunn St between E 15th & E 16th St 8am-2pm Friday 5/24 - Emergency Service Repair.
Utilities
GEOMETRYCOLLECTION(POINT(-86.52835380662505 39.176871377111155),POINT(-86.52835380662505 39.176871377111155),POINT(-86.52835380662505 39.176871377111155),POINT(-86.52835380662505 39.176871377111155),POINT(-86.52835043764402 39.17686876547853),POINT(-86.52835043764402 39.17686876547853),LINESTRING(-86.52835043764402 39.17686876547853,-86.52835043764402 39.17686876547853,-86.52833696171994 39.17777238458456))
Waldron Center 100 S Walnut St May 26, 2024 to May 29, 2024
METERS 112A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53363026452635 39.16595929254049),POINT(-86.53363026452635 39.16595929254049),LINESTRING(-86.53360880685425 39.16595929254049,-86.53360880685425 39.166158930967924),LINESTRING(-86.53360880685425 39.166158930967924,-86.53363026452635 39.16614229445398))
WALDRON CENTER 100 W 4TH ST May 26, 2024 to May 29, 2024
METERS 100A&B, 102A
Public Works
GEOMETRYCOLLECTION(POINT(-86.53403796029662 39.165609923929026),POINT(-86.53403796029662 39.165609923929026),LINESTRING(-86.53397358728027 39.16559328728519,-86.53427399468995 39.16564319720487),LINESTRING(-86.53427399468995 39.165609923929026,-86.53427399468995 39.165609923929026),LINESTRING(-86.53425253701784 39.165609923929026,-86.53425253701784 39.165609923929026),LINESTRING(-86.53425253701784 39.16562656056891,-86.53425253701784 39.16562656056891),LINESTRING(-86.53425253701784 39.165609923929026,-86.53427399468995 39.165609923929026))
1st Street Reconstruction Project College Ave between 2nd Street and 1st Street. May 29, 2024 to June 7, 2024
One lane closure on College Ave between W 2nd Street
Engineering
LINESTRING(-86.53495278715314 39.16069186290528,-86.53498592865161 39.15895728147032)
GRADUATE HOTEL 100 S LINCOLN May 30, 2024 to May 31, 2024
109 A&B 111 A
Public Works
GEOMETRYCOLLECTION(POINT(-86.5311976561599 39.16621415040231),POINT(-86.53120033385339 39.16622245464745),POINT(-86.53120033385339 39.16620999827941),POINT(-86.5311976561599 39.166236987074086),POINT(-86.5311976561599 39.166253595557976),POINT(-86.5311976561599 39.16626397585841),POINT(-86.53119497846642 39.166232834952496))
SPRINGHILL SUITES 500 N COLLEGE AVE May 30, 2024 to June 1, 2024
503 A & B
Public Works
GEOMETRYCOLLECTION(POINT(-86.5349606727266 39.170619881713264),POINT(-86.53495214401667 39.17066285995986),POINT(-86.5349606727266 39.17061326967297),LINESTRING(-86.53494787966171 39.17065624792363,-86.53495640837164 39.170609963652595))
SPRINGHILL SUITES 500 N COLLEGE AVE May 31, 2024 to June 1, 2024
505 A & B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53498698743009 39.17060593183936),POINT(-86.53498426024943 39.17060593183936),LINESTRING(-86.53497880588816 39.17055518867855,-86.53498698743009 39.17059958894623),LINESTRING(-86.53498698743009 39.17059958894623,-86.53497880588816 39.17059113175458))
HILTON GARDEN INN 200 N COLLEGE AVE May 31, 2024 to June 1, 2024
205 A&B, 207 A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53499103634434 39.167959067096234),POINT(-86.53499103634434 39.168012676220314),LINESTRING(-86.53499103634434 39.16800780266527,-86.53498789332077 39.167956630316894))
BLUEBIRD 200 N WALNUT June 1, 2024
204 A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53350428606576 39.168109017396745),POINT(-86.53350428606576 39.168137837542815),LINESTRING(-86.53350935512317 39.16811032740364,-86.53350090669417 39.16813521753002,-86.53350259637998 39.16810770738985))
B-Line Extension Project, Realignment of Crescent Rd and Fountain Dr. There will be a road closure at the intersection of Crescent Rd and Fountain Dr. June 3, 2024 to September 23, 2024 daily until September 30, 2024
At the intersection of Crescent Rd and Fountain Dr, there will be a road closure. This will be due to the realignment of the intersection. This road closure is scheduled for June 13th through mid-September. There will be a signed detour set up for the closure.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.5565857252374 39.17502141319386,-86.5565857252374 39.17502141319386,-86.55678109308725 39.175267524158926,-86.55687428768094 39.17538492398754),LINESTRING(-86.55657670779003 39.17539191458954,-86.55657670779003 39.17539890519083,-86.55678411183133 39.17526608404768))
CBU Road Closure - S Heritage Dr Culvert Repair S Heritage Dr at Morningside June 3, 2024 08:00 am to 15:00 pm June 6, 2024
Please be advised that CBU crews have closed S Heritage Rd at Morningside due to culvert repair. Normal traffic flow is expected to resume at 3:00pm Thursday 6/6. Road signs are in place.
Utilities
POINT(-86.48273358966797 39.16618713846404)
Fox Construction 109 W 4th ST June 3, 2024 to August 9, 2024
meter 101a
Public Works
GEOMETRYCOLLECTION(POINT(-86.5337804682312 39.16562656056891),POINT(-86.5337804682312 39.16562656056891),LINESTRING(-86.53386629891968 39.16552674067049,-86.53414524865723 39.16559328728519))
Blur Ridge Food Truck Nights Rusgan Dr. June 4, 2024 15:30 pm to 20:30 pm every 2 months on Tuesday until August 6, 2024
Food Truck Nights on 6.4 and 8.6
Public Works
GEOMETRYCOLLECTION(POINT(-86.53140132792392 39.20143152043971),POINT(-86.53205816766807 39.20111933064604),LINESTRING(-86.53139257006066 39.20141116027807,-86.53204940980481 39.20112611739543),LINESTRING(-86.53140132792392 39.20142473371979,-86.53140132792392 39.20142473371979),LINESTRING(-86.53141008578717 39.20141116027807,-86.5313838121974 39.20141116027807),LINESTRING(-86.53141884365041 39.20141794699924,-86.53141884365041 39.20141794699924),LINESTRING(-86.53144511724018 39.20141794699924,-86.53205816766807 39.20112611739543))
SANDY ZAVALA LOAD/UNLOAD FROM MOVING VEHICLE 200 S WASHINGTON ST June 6, 2024
206 A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53244472612164 39.16524382979625),POINT(-86.5324463480588 39.165250117460346),LINESTRING(-86.53244148224731 39.16524131473045,-86.53243986031015 39.16531550913368),LINESTRING(-86.53244148224731 39.16524382979625,-86.53244148224731 39.16524382979625,-86.53243823837298 39.16531928172839),LINESTRING(-86.53243823837298 39.165318024196836,-86.53243823837298 39.16524885992757))
Granfalloon Mainstage Concert and Bloomington Handmade Market Kirkwood Ave and Courthouse Square June 7, 2024 12:00 pm to 00:00 am June 9, 2024
Granfalloon Mainstage Concert and Bloomington Handmade Market
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53484035455479 39.16756898224216,-86.53364617750566 39.16756594667493),POINT(-86.53484035455479 39.16756898224216),POINT(-86.53365009284023 39.16756898224216),LINESTRING(-86.53424522369752 39.16759933790732,-86.53426088503586 39.1676023734731),POINT(-86.5342530543667 39.16759933790732),LINESTRING(-86.53424522369752 39.16759933790732,-86.53424522369752 39.16759933790732),LINESTRING(-86.53424130836292 39.1676023734731,-86.53426480037045 39.16759933790732),POINT(-86.53235411709184 39.16610278801679),POINT(-86.53231887908055 39.16704686275091),POINT(-86.53171591755411 39.16704079157125),POINT(-86.5311247020314 39.16656420233173),LINESTRING(-86.53355220947556 39.166579380382785,-86.53235016265234 39.166570375913125,-86.53112078669683 39.166561166721124),LINESTRING(-86.53235020175725 39.16656723794222,-86.53235411709184 39.16610582364717),LINESTRING(-86.53232670974973 39.16704686275091,-86.53235020175725 39.16656723794222),POINT(-86.53355220947556 39.166576344772835),LINESTRING(-86.53484426988938 39.166594558430575,-86.53365400817484 39.16658241599262),POINT(-86.5336657541786 39.16658241599262),POINT(-86.53482077788186 39.166594558430575))
4th & Rogers Block Party 4th Street on either side of Rogers Street June 7, 2024 15:00 pm to 23:00 pm
5ht Annual 4th & Rogers Block Party
Public Works
GEOMETRYCOLLECTION(POINT(-86.53872690541577 39.16562785695015),POINT(-86.5393102858765 39.16563409568897),POINT(-86.53865314466785 39.16562785695015),POINT(-86.53808183414768 39.1656205784208),LINESTRING(-86.539311626981 39.16563409568897,-86.53872690541577 39.16562889674),LINESTRING(-86.53865314466785 39.16562785695015,-86.53808183414768 39.1656205784208))
BUSKIRK CHUMLEY 100 E 5TH ST June 7, 2024
METER 106A
Public Works
GEOMETRYCOLLECTION(POINT(-86.53302944970703 39.16660811535789),LINESTRING(-86.53300799203491 39.16659147895015,-86.53281487298585 39.16659147895015))
Grandfaloon E Kirkwood Ave from N Walnut to N Grant St June 7, 2024 to June 9, 2024
Special event closure.
External Project
LINESTRING(-86.5335496687486 39.16658914108913,-86.52984220754429 39.16655311046307)
Bloomington Handmade market Monroe County Courthouse square, W 6th St, E Kirkwood June 8, 2024
10am - 4pm lane closures on 6th St and Kirkwood
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.53481894781791 39.167561629420874,-86.53365183376896 39.16755947497779),LINESTRING(-86.5336379395541 39.1666115136191,-86.5348411785617 39.166620131507216))
MONROE COUNTY COMMISSIONERS 100 W 6TH ST June 9, 2024
6THW 113 A & B 6THW 115 A
Public Works
GEOMETRYCOLLECTION(POINT(-86.53436795181842 39.16745353537746),POINT(-86.53439706098351 39.16745353537746),POINT(-86.53434466448634 39.16745052625282),LINESTRING(-86.53439706098351 39.16744902169046,-86.53439706098351 39.16744902169046,-86.53433496143131 39.16745052625282))
FIRST UNITED METHODIST CHURCH 200 E 4TH ST June 10, 2024 to June 21, 2024
METERS 203A&B, 205A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53167761636352 39.16559328728519),POINT(-86.53167761636352 39.16559328728519),LINESTRING(-86.53159178567503 39.165576650637405,-86.53187073541258 39.165576650637405),LINESTRING(-86.53197802377319 39.16559328728519,-86.53193510842895 39.165543377330096))
Lane Restrictions on S Union St/N Union St from E 3rd St to E 10th St S Union St/N Union St from E 3rd St to E 10th St June 10, 2024 06:00 am to 16:00 pm June 13, 2024
Lane Restrictions on S Union St/N Union St from E 3rd St to E 10th St for milling and resurfacing.
Street
LINESTRING(-86.50937950276902 39.16429899255601,-86.5094619999801 39.17151296439036)
Lane Restrictions on E 5th St from N Union St to N Jefferson ST E 5th St from N Union St to N Jefferson St June 10, 2024 06:00 am to 16:00 pm June 13, 2024
Lane Restrictions on E 5th St from N Union St to N Jefferson St for milling and resurfacing.
Street
LINESTRING(-86.50934508887711 39.16680913954036,-86.50718572788277 39.16680913954036)
Monroe County Commissioners 100 w 6th st June 10, 2024 to June 14, 2024
113A&B, 115A
Public Works
GEOMETRYCOLLECTION(POINT(-86.5340165026245 39.167573020273494),POINT(-86.5340165026245 39.167573020273494),LINESTRING(-86.53399504495238 39.16758965644908,-86.53440274072265 39.167556384093984),LINESTRING(-86.53440274072265 39.167556384093984,-86.53440274072265 39.167506475531894))
W Cottage Grove Ave from N Monroe St from W 10th St closed for tree removal W Cottage Grove Ave from N Monroe St to W 10th St June 10, 2024 08:30 am to 10:45 am
W Cottage Grove Ave from N Monroe St to W 10th St closed for tree removal.
Street
LINESTRING(-86.54706174323955 39.17261370728701,-86.54495301536237 39.17260322790224)
Road Closure S Olive St between Hillside Dr and Thornton Dr June 14, 2024
For water line repairs
Utilities
LINESTRING(-86.51882501012486 39.15051745287485,-86.51878196900552 39.14830536970888)
Lane closure E Hillside E Hillside between Olive & Huntington June 14, 2024 07:00 am to 15:00 pm
Please be advised that CBU & AEG crews will close 1 lane of E Hillside Dr between S Huntington Dr and S Olive St due to hydrant maintenance tomorrow 6/14/24 between 7am and 3pm. Road signs and flaggers will be in place.
Utilities
LINESTRING(-86.52075706352264 39.15055433826328,-86.51892753957227 39.150535319804106)
GROOMER CONSTRUCTION, ALLEY & SIDEWALK REPLACEMENT, APPROVED BY ADAM. 100 E 6TH ST/ BETWEEN WALNUT/WASHINGTON, 24 METERS June 17, 2024 to July 15, 2024
24 METERS ON E 6TH BETWEEN/WALNUT & WASHINGTON
Street
GEOMETRYCOLLECTION(POINT(-86.53352297616577 39.1675231117232),POINT(-86.53352297616577 39.1675231117232),LINESTRING(-86.53352297616577 39.16748983933667,-86.53238571954346 39.167573020273494))
NORDO CONSTRUCTION 100 N WALNUT ST June 17, 2024 to June 20, 2024
METERS 102A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53360880685425 39.16695747901127),POINT(-86.53360880685425 39.16695747901127),LINESTRING(-86.5336731798706 39.166874297346425,-86.53358734918213 39.16719038714945))
Eastbound Lane Closure - S Hillside Dr CBU has closed the EB lane of E Hillside Dr between S Olive St & S Huntington Ave all day (8:15 to 2:00pm). June 17, 2024
Eastbound Lane of Hillside Drive between Olive & Huntington closed all day for a Fire Hydrant repair.
Utilities
LINESTRING(-86.52081989547338 39.1505289797378,-86.52081989547338 39.1505289797378,-86.51879903125774 39.15054208307956)
Milling and Resurfacing on S Hawthorne Dr S Hawthorne Dr from E Atwater Ave to E 3rd St June 17, 2024 06:00 am to 16:00 pm June 28, 2024
Lane restrictions and no parking on S Hawthorne Dr from E Atwater Ave to E 3rd St for milling and resurfacing.
Street
LINESTRING(-86.520185917043 39.16314913110048,-86.52020008657907 39.16375337839088,-86.52010089982653 39.16401155519594,-86.5200725607544 39.16420930700147)
Milling and Resurfacing on S Fess Ave S Fess Ave from E Atwater Ave to E 3rd St June 17, 2024 06:00 am to 16:00 pm June 28, 2024
Lane restrictions and no parking on S Fess Ave from E Atwater Ave to E 3rd St for milling and resurfacing.
Street
LINESTRING(-86.52588745454378 39.163173695435205,-86.52588745454378 39.164271906840696)
Milling and Resurfacing on S Woodlawn Ave S Woodlawn Ave from E Atwater Ave to E 3rd St June 17, 2024 06:00 am to 16:00 pm June 28, 2024
Lane restrictions and no parking on S Woodlawn Ave from E Atwater Ave to E 3rd St for milling and resurfacing.
Street
LINESTRING(-86.52262915286194 39.163143758241176,-86.52263419423582 39.16345255542814,-86.52261907011416 39.16356981982756,-86.52263419423582 39.164234314398385)
Milling and Resurfacing on S Highland Ave S Highland Ave from E Atwater Ave to E 3rd St June 17, 2024 06:00 am to 16:00 pm June 28, 2024
Lane restrictions and no parking on S Highland Ave from E Atwater Ave to E 3rd St for milling and resurfacing.
Street
LINESTRING(-86.51772455888417 39.16314732578917,-86.517748749661 39.164216429008064)
Milling and Resurfacing on S Eagleson Ave S Eagleson Ave from E Atwater Ave to E 3rd St June 17, 2024 06:00 am to 16:00 pm June 28, 2024
Lane restrictions and no parking on S Eagleson Ave from E Atwater Ave to E 3rd St for milling and resurfacing.
Street
LINESTRING(-86.51640854897327 39.1641380177569,-86.51636945298957 39.163107379178854)
Milling and Resurfacing on S Ballantine Rd S Ballantine Rd from E Atwater Ave to E 3rd St June 17, 2024 06:00 am to 16:00 pm June 28, 2024
Lane restrictions and no parking on S Ballantine Rd from E Atwater Ave to E 3rd St for milling and resurfacing.
Street
LINESTRING(-86.51911427286858 39.16420068792465,-86.5191260596612 39.16314058344841)

Please enable Javascript

To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.

This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.