Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
AEG Lane and Sidewalk Closure for Fiber Installation S Maxwell St, E Hillside Dr, S Olive St, S Highland Ave, S Nancy St, E Thornton Dr February 3, 2023 to August 3, 2024
City wide Fiber, BLC02a-F14_ S Maxwell St, E Hillside Dr, S Olive St, S Highland Ave, S Nancy St, E Thornton Dr; The Board of Public Works extended this permit on May 21st, 2024. Substantial completion is expected on August 3rd, 2024.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.51744301254095 39.146825670225866,-86.51623242922997 39.146825670225866,-86.51506586713032 39.146825670225866,-86.5150988830388 39.14825952729285),LINESTRING(-86.5208436511146 39.15055534474067,-86.52085465641743 39.146893949796095,-86.51881867539443 39.14685127507241,-86.51882968069724 39.14930076233048),LINESTRING(-86.516936768611 39.15049560322828,-86.51694777391381 39.149778701123864,-86.51744301254104 39.14916420779335,-86.51750904435801 39.14830220116261,-86.5180372988937 39.14830220116261,-86.51747642577749 39.14829062414094,-86.51514290425018 39.14824245773758,-86.51513189894735 39.15049560322828),LINESTRING(-86.51071877251371 39.14848996588256,-86.51320597095261 39.14848143113343,-86.51387729442506 39.14829366639074,-86.51436152774946 39.14824245773758,-86.51514290425018 39.148259527292794),LINESTRING(-86.51999624279688 39.15056387923829,-86.5169361821052 39.1505390187622,-86.51513151050528 39.15052435728575,-86.51103741071513 39.15049109607182,-86.50954085377863 39.15047893776625,-86.50844067482848 39.15046999970741),LINESTRING(-86.5217791018549 39.15055534474067,-86.5208436511146 39.15055534474067,-86.51994121628277 39.15055534474067),LINESTRING(-86.51111452130881 39.15297910047539,-86.51213801447173 39.15297056627065,-86.5121710303802 39.15378984520481,-86.51299642809224 39.15355942396869),LINESTRING(-86.51214901977455 39.15297910047539,-86.51219304098586 39.15242437501533,-86.51239113643673 39.152321963682994,-86.51295240688093 39.15242437501533),LINESTRING(-86.51238013113392 39.152321963682994,-86.5125342053735 39.15208300332796,-86.51256722128198 39.15185257650285,-86.51251478425085 39.15133197978665,-86.512569810765 39.150589482724854),LINESTRING(-86.50841822211618 39.15265479996816,-86.51104848949186 39.152620662985726,-86.51106416260086 39.15298041977641,-86.51110351600597 39.15388372030691),LINESTRING(-86.51108409488333 39.15265479996816,-86.51109510018617 39.15056387923818),LINESTRING(-86.51103792629566 39.150452930688374,-86.51071877251367 39.15017129127605,-86.51069676190804 39.14994939276349,-86.51066374599954 39.14901911830728),LINESTRING(-86.50954120511118 39.150452930688374,-86.50951919450553 39.14890816732208),LINESTRING(-86.50844023272184 39.15261212873753,-86.50844023272184 39.150469999707326),LINESTRING(-86.51557211106032 39.14099605768655,-86.51574819590556 39.14143991046657,-86.51644152998365 39.142882412674965,-86.51671666255434 39.143070191853155,-86.51736597542113 39.14320675821361,-86.51742100193526 39.14343721334606,-86.5174320072381 39.144452914013414),LINESTRING(-86.52050248672688 39.14443584353501,-86.5201062958251 39.144307814815306,-86.51969909962051 39.14394079786163,-86.51937994583851 39.14422246220616,-86.51904978675371 39.14439316732097),LINESTRING(-86.51747602844945 39.148302201162636,-86.51745910346794 39.146825559301334,-86.51743200723814 39.14446144925097,-86.51875264357737 39.14444437877469,-86.51902777614806 39.14439316732097,-86.51947899356396 39.1450077023066,-86.52002925870532 39.1451954758154,-86.52059052914949 39.14521254610955),LINESTRING(-86.51878565948587 39.14685981001924,-86.51875264357737 39.14533203805263),LINESTRING(-86.51505486182748 39.14680006536989,-86.51504385652467 39.14400054493805,-86.51601232317343 39.14402615081241),LINESTRING(-86.51630946634978 39.14559662663339,-86.51623242922997 39.14680860032291))
Hopewell Project South Morton Street from West 1st Street to West 2nd Street. August 7, 2023 to August 31, 2024
South Morton Street from West 1st Street to West 2nd Street will be closed to through traffic. Detour in place.
Engineering
LINESTRING(-86.53630036983884 39.159437140754676,-86.53628425635348 39.16133312709155)
AEG Fiber Installation 203 E 19th St November 17, 2023 to July 27, 2024
BLN01a-F02_E 19th St, Underground and aerial fiber placement and excavations along N Dunn St, N Walnut St, E 20th St, E 17th St, N Lincoln St, and nearby alleys and easements. This permit was taken to the Board of Public Works on 12/5/2023 and then extended on 5/21/2024. Substantial completion is expected on July 27th, 2024.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.52829675313262 39.17856436940852,-86.52829675313262 39.178997345130966,-86.52829675313262 39.180988999109246,-86.53041924200095 39.18103229530823,-86.53094427872102 39.18111888762621,-86.53093310772697 39.18064262855748,-86.53091076573888 39.18219262350743),LINESTRING(-86.53198318116706 39.178997345130966,-86.52827441114454 39.178997345130966),LINESTRING(-86.52825206915647 39.180997658351174,-86.52829675313262 39.1835434292241),LINESTRING(-86.5322289430361 39.17993256359108,-86.53199435216118 39.181266094321956,-86.53235182397059 39.18134402715373,-86.53236299496463 39.1821839644127),LINESTRING(-86.53389342114862 39.18226189622692,-86.53448548383294 39.18527519345258,-86.53441845786868 39.18605447343563))
AEG Lane and Sidewalk Closure for Fiber Installation W Gourley Pike, W Arlington Rd, W 17th St, N Kinser Pike, W Brookdale Dr, and N College Ave, and nearby alleys and easements December 8, 2023 to July 13, 2024
BLN01a-F06_Hoosier Court Ave; Underground and aerial fiber placement and excavations along W Gourley Pike, W Arlington Rd, W 17th St, N Kinser Pike, W Brookdale Dr, and N College Ave, and nearby alleys and easements. This permit was taken to the Board of Public Works on 12/05/2023. The Board of Public Works extended the permit on May 21st, 2024. Substantial completion is expected on July 13th, 2024.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.55344122764303 39.186015576595935,-86.55087041671267 39.186015576595935,-86.55111035906616 39.18649380671647,-86.54673998048455 39.186427386060956,-86.54670570300547 39.184036200659676,-86.54680853544268 39.183890070025456,-86.54879662922883 39.18386350078657),LINESTRING(-86.55088755545219 39.186015576595935,-86.5502705608289 39.18463400463631,-86.55018486713122 39.18394320847304,-86.55004775721494 39.182521741164635,-86.54896801662419 39.18051569633826,-86.54749408502411 39.17933329873304,-86.54699706157758 39.17928015680067,-86.54656859308919 39.179107445243005,-86.54405776774722 39.17903437484091,-86.54408347585652 39.18080797133254),LINESTRING(-86.54403285906797 39.179039291013055,-86.53773836585407 39.17899744419188,-86.53772756912487 39.1831317897815,-86.5369178038891 39.18370332778764,-86.53639957141424 39.18406909747941),LINESTRING(-86.53680984712972 39.18266313124565,-86.5368854242352 39.183675764520984),LINESTRING(-86.53771677239557 39.18315689640059,-86.53771677239557 39.18506497321383,-86.537274106492 39.18501476132968),LINESTRING(-86.53771677239557 39.1850733418577,-86.54157120477525 39.18510681642323,-86.54174395244493 39.18526582039166,-86.54173315571558 39.186270047672195,-86.5418951066559 39.18638720658697,-86.54212183797235 39.186429049009206,-86.54674449917154 39.186420680526766))
Lane, Alley, and Sidewalk Closure for AEG Fiber Installation 801 N Lincoln December 22, 2023 to August 16, 2024
BLN01b-F09_N Lincoln St; Aerial and underground fiber placement and excavations along W 11th St, E 12th St, E 11th St, E Cottage Grove, N Walnut St, N Lincoln St, N Grant St, and N Indiana Ave, and nearby alleys and easements. This permit was taken to the Board of Public Works on 12/19/2023 and extended on 5/21/2024. Substantial completion is expected on August 15th, 2024.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.52662696313247 39.17434205096151,-86.52696625436285 39.17434609754406,-86.52699235368826 39.17346393704048,-86.52979542123762 39.17349226346718),LINESTRING(-86.52828147173301 39.174364461507366,-86.52829742122688 39.17169549793499),LINESTRING(-86.53352865734887 39.17442006091923,-86.5309831482375 39.174398750480464,-86.52973425687799 39.174388295036096,-86.52731033332547 39.17436800247569),LINESTRING(-86.53100372232426 39.174404443390216,-86.53102386808241 39.173503826682605,-86.52976140057012 39.173493414861326,-86.52972782430649 39.17438882585773))
AEG Lane and Sidewalk Closures for Fiber Installation along W 17th St, W Fountain St, N Lemon Ln, W Gray St, N Oolitic Dr, N Lindberg Dr, and W 11th St, and nearby alleys December 27, 2023 to July 27, 2024
BLN01b-F13_N Crescent Rd; Aerial and underground fiber placement and excavations along W 17th St, W Fountain St, N Lemon Ln, W Gray St, N Oolitic Dr, N Lindberg Dr, and W 11th St, and nearby alleys and easements. This permit was taken to the Board of Public Works on 2/13/2024. The permit was extended by the Board of Public Works on May 21st, 2024. Substantial completion is expected on July 27th, 2024.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.54990556251626 39.17322892645319,-86.55361689834326 39.17322892645319,-86.55512331226369 39.17322892645319),LINESTRING(-86.56308511174863 39.17550289611444,-86.56030050955182 39.17741003977133,-86.55980036255531 39.1774309971066,-86.55942187293633 39.177336689048786,-86.55876286691117 39.17689640891015,-86.55736721500469 39.17596396855308,-86.55678318600306 39.175261803847036,-86.55510979477717 39.17324988503469),LINESTRING(-86.55264961225383 39.179044693160876,-86.55254880744124 39.17425185539588,-86.5525279548763 39.173260364323085),LINESTRING(-86.55649302742907 39.17566058397415,-86.55654042820315 39.17547685527481),LINESTRING(-86.55663522975134 39.17909009823822,-86.55654042820315 39.17834296831168,-86.55650092755808 39.17565445969191),LINESTRING(-86.55662375325316 39.1791075636861,-86.55264926101067 39.179088347924846,-86.55012184229845 39.17907612843052),LINESTRING(-86.54885312054782 39.17744870207389,-86.54891632157992 39.17671992727594,-86.54905852390219 39.17664643696105,-86.55341149498891 39.17667093374121,-86.55359319795623 39.176579070771595,-86.55368799950442 39.176352474933395,-86.55361689834326 39.17322905248818),LINESTRING(-86.55255038092649 39.174251835507675,-86.55255038092649 39.174251835507675,-86.55048054712483 39.17423346229123),LINESTRING(-86.55632531673838 39.17216315331467,-86.55635691725443 39.17271436394776),LINESTRING(-86.5548242922257 39.172867477245774,-86.55636481738345 39.172708239408934),LINESTRING(-86.55638061764148 39.17271436394776,-86.55867165505553 39.1727878583724,-86.5587664566037 39.172898099865336,-86.55876826458505 39.17689155387575),LINESTRING(-86.55483219235474 39.17287972629518,-86.55513239725725 39.17322269881308),LINESTRING(-86.55676953194457 39.1752686288352,-86.55654832833216 39.175458482378446))
AEG Lane, Alley, Sidewalk, and Parking Lane Closure for Fiber Installation Along N/S Maple St, N/S Jackson St, W 6th St, N Fairview St, W 5th St, W 4th St, and nearby alleys and easements December 27, 2023 to August 3, 2024
BLN01b-F11_N Williams St; Aerial and underground fiber placement and excavations along N/S Maple St, N/S Jackson St, W 6th St, N Fairview St, W 5th St, W 4th St, and nearby alleys and easements. This permit was taken to the Board of Public Works on 12/19/2023 and was extended on 5/21/2024. Substantial completion is expected on August 3rd, 2024.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.54092797390301 39.1671608374638,-86.540917161921 39.16669141023425),LINESTRING(-86.54090888203984 39.16760260516236,-86.54091792392968 39.16716446673942),LINESTRING(-86.53985758768314 39.1671189244457,-86.53986839966515 39.16669141023425),LINESTRING(-86.5398555018728 39.16759208987219,-86.53985098092787 39.16712941554769),LINESTRING(-86.54218784980122 39.16864468019918,-86.54218784980122 39.168212489303244,-86.54218784980122 39.16763522012934),LINESTRING(-86.53982339560653 39.168609629745106,-86.53984147938621 39.1681294367655),LINESTRING(-86.54217926756314 39.168212489303244,-86.54086367259058 39.168208984237054),LINESTRING(-86.54216976602156 39.168637670109746,-86.53983695844134 39.168616639837325),LINESTRING(-86.54217428696649 39.16956650087005,-86.54217880791141 39.168637670109746),LINESTRING(-86.54109086108593 39.17168573415904,-86.54111952384811 39.1704413471918,-86.54035996065024 39.1704413471918,-86.54035996065024 39.16954693045824),LINESTRING(-86.54166342019019 39.17045325992305,-86.54169054585972 39.16956299587133),LINESTRING(-86.5411118649096 39.17044274505909,-86.54166345336526 39.17045208196282,-86.54214716129692 39.170460269831494,-86.54216976602156 39.169570005868536),LINESTRING(-86.54111235815758 39.17237458176166,-86.54109802677648 39.171696844657816,-86.54162828787689 39.17169128940864,-86.54164261925797 39.172046824469646),LINESTRING(-86.54219237074616 39.167631715034446,-86.54374988458089 39.16762992872867,-86.54524852951407 39.16762820993932),LINESTRING(-86.54519870680056 39.16665787959792,-86.5437287855949 39.16665014005406,-86.54221481080663 39.16664216855489,-86.54091765306732 39.166635338657215,-86.53986893917819 39.16662981688526,-86.53883044939133 39.166624348945675),LINESTRING(-86.54374990121 39.16763864410501,-86.54374990121 39.16715245486219),LINESTRING(-86.5422145997633 39.16715245486219,-86.5422145997633 39.16666626225853),LINESTRING(-86.54220378778128 39.16762187901466,-86.54220378778128 39.16714407225956),LINESTRING(-86.5421878498012 39.16763522012934,-86.5409085366287 39.1676194764249,-86.53985520656786 39.16760651375017,-86.53933965449974 39.16760016917223),LINESTRING(-86.54374990121 39.1671608374638,-86.54372827724596 39.166708175546404))
Clear Creek Culvert Reconstruction East-west alley behind Von Lee February 5, 2024 to May 31, 2024
Milestone contractors will be performing work to reconstruct the Clear Creek culvert that spans from the east-west alley behind the Von Lee across Indiana Ave. The project will include alleyway, sidewalk, and lane restrictions in the surrounding area and a road closure on Indiana during the final phase of the project.
Utilities
LINESTRING(-86.5282202051962 39.166693654783074,-86.528218241545 39.16704533797687,-86.52697525032963 39.16704533797687,-86.52696346842237 39.16667081815129)
Road Improvements/Expansion by Crider & Crider The 45/46 Bypass between Arlington and N Kinser Pike March 9, 2024 to November 6, 2024
Crider and Crider will be working on multiple projects on 45/46 between Arlington Road and N Kinser Pike. This will include lane restrictions temporary closing of the N Monroe Street intersection on the South side, and other possible changes.
External Project
LINESTRING(-86.55129909883534 39.18708881369716,-86.53779354307697 39.1865871937342)
1st Street Reconstruction Project 1st Street between South College Ave to South Rogers Street March 18, 2024 to July 31, 2024
Closure of 1st Street between South College Ave to South Rogers Street. A detour route is set in place.
Engineering
LINESTRING(-86.53860272873037 39.15942790212222,-86.53504216360619 39.15940182915014)
Adams St Sidewalk Project Along the westside of Adams St and at the intersection of 8th St and Fountain Dr, new sidewalk being installed. March 18, 2024 to June 24, 2024 daily until June 24, 2024
Along the westside of Adams St between Kirkwood Ave and Fountain Dr there will be new sidewalk added. Also, at the S/W corner of 8th St and Fountain Dr, new sidewalk will be added here as well. There is a 60 total day lane closure of the southbound lane of Adams St between Kirkwood Ave and Fountain Dr. The detour will be along 11th St, Rogers St and Kirkwood Ave. The project is scehedule for a total of 90 days.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.54963774306117 39.16673030870902,-86.54966231493518 39.169733898511765),LINESTRING(-86.5498670784689 39.16977199815628,-86.54995717429878 39.16982279771074),LINESTRING(-86.55031755824314 39.16984184754179,-86.55022746241326 39.16996884620275,-86.55034213011714 39.170032345447254))
B-Line Extension Project, from Adams St along Fountain, up Crescent Rd to 17th St. Adams St along Fountain Dr., up Crescent Rd. to 17th St. April 1, 2024 to November 15, 2024 daily until November 15, 2024
B-Line Extension Project. This project runs from Adams St along the north side of Fountain Dr., up the east side of Crescent Rd to 17th St. There will be lane restrictions throughout the project.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55154570965307 39.170728870443895,-86.55521901332583 39.17334679210555,-86.55670122308807 39.175225240685876),LINESTRING(-86.55673989032744 39.17525521592228,-86.55652078039554 39.17572481971655,-86.55659811290778 39.17904193408043))
Duke Energy lane restriction S Woods Edge Bend May 5, 2024 to May 31, 2024
Lane restrictions for equipment replace and cable burial.
External Project
LINESTRING(-86.51772141628808 39.12656485004962,-86.51758160398511 39.126546150057266,-86.51714288262062 39.126568590047526,-86.51693557472312 39.126553630054815,-86.51669451902836 39.126486310048335,-86.5164438211058 39.12632922978301,-86.51628954546116 39.12612352890582,-86.5162461554361 39.12598888800639,-86.51620276541102 39.12548398234128)
Smith and SR 46 Intersection Improvement Smith Rd north of SR46 May 6, 2024 to July 31, 2024
Smith rd and SR 46 intersection improvements. This includes new storm pipe, sidewalk, curbs, and widening of the intersection. This is part of INDOT's project R-41465. Closures include road and sidewalk closures that will be completed in two phases: north of SR 46 and south of SR 46. Road closures will be in place on Smith at the intersection for both with planned detours to be used. Private access to homes and business to be maintained as soft closures. 11,797 sq ft of pavement excavations, 80 sq ft of non pavement excavations, 87 sq ft of new sidewalk construction, and 2 residential driveway installations are included in the work
Indiana Department of Transportation
LINESTRING(-86.48122453952156 39.16431837266765,-86.48123593654971 39.16465857895665)
Hawthorne, Weatherstone and Miller Greenway Hawthorne Drive from E 3rd Street to the dead end of Hawthorne south of E Southdowns Drive. May 12, 2024 to September 30, 2024
Lane restrictions will be through out the areas while bumpouts, curbs, sidewalk and speed cushions are installed.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.5200455025946 39.164200171847,-86.52019744926322 39.163664668829824,-86.52018363592971 39.15728115895075,-86.52043227593292 39.156638491637295,-86.52049276929516 39.15515020710811,-86.52048752926696 39.15507464332029,-86.52005931592811 39.1538428205175,-86.52065328926909 39.154078475243494,-86.52257334262717 39.15408918680319,-86.52062566260207 39.154078475243494,-86.52003168926109 39.153832108920284,-86.51909238258231 39.15377855090978,-86.51878848924507 39.15373570447204,-86.51863654257644 39.153650011518295,-86.51844315590728 39.15333937368618,-86.51844315590728 39.15292161719805,-86.51867798257696 39.15245029920848,-86.51913382258284 39.15212894422382),LINESTRING(-86.51880901069448 39.15054882520752,-86.51883714449167 39.15079972566309,-86.5189309238156 39.150966992136546,-86.51919350592264 39.15115607549737,-86.5194373321649 39.151345158350125,-86.51951235562406 39.15153060450075,-86.5194748438945 39.15177422909312,-86.51935761973957 39.15196694645681,-86.5191231714297 39.152134210155964,-86.51925446248322 39.152268748060266,-86.51899656934236 39.152025125179875),LINESTRING(-86.51899656934236 39.152025125179875,-86.51899188037618 39.15202148901108),LINESTRING(-86.52694272960544 39.14690660289688,-86.52659974331263 39.14701208403028,-86.52600838763533 39.147002911764076,-86.52525145236842 39.146966222687325,-86.52431119684155 39.1469295335915,-86.52257261115034 39.14686991376993,-86.52086950679977 39.14686532762772,-86.5187761077022 39.1468515691993),LINESTRING(-86.5187761077022 39.1468515691993,-86.51878202125896 39.1468515691993))
1st Street Reconstruction Project West 1st Street Between South Fairview Street to South Rogers Street May 13, 2024 to November 1, 2024
Closure of 1st Street between South Fairview Street to South Rogers Street. A detour route is set in place.
Engineering
LINESTRING(-86.53873635585423 39.15942941125837,-86.54245334738789 39.159439631532734)
Pavilion Properties Construction Closure 401 S Woodlawn May 15, 2024 to June 1, 2024
Road closure on S Woodlawn From E Atwater to the east/west alley. Sidewalk closure in the east sidewalk of S Woodlawn.
External Project
LINESTRING(-86.52262702738788 39.163067771569615,-86.5226297095969 39.16270799026685)
CBU emergency lane closure to repair drinking water valve one lane of Walnut between Kirkwood and 3rd May 21, 2024 22:00 pm to 06:00 am May 22, 2024
Please be advised that at 10pm tonight Tuesday 5/21/24, CBU crew will close 4th St between College and Walnut as well as one lane of Walnut due to an emergency road repair. Normal traffic flow is expected to resume no later than 6am Wednesday 5/22/24. Road signs will be in place.
Utilities
LINESTRING(-86.53358850841481 39.16651489389466,-86.5336198464964 39.164750920832034)
CBU emergency closure to repair drinking water valve 4th St between College and Walnut May 21, 2024 22:00 pm to 06:00 am May 22, 2024
Please be advised that at 10pm tonight Tuesday 5/21/24, CBU crew will close 4th St between College and Walnut as well as one lane of Walnut due to an emergency road repair. Normal traffic flow is expected to resume no later than 6am Wednesday 5/22/24. Road signs will be in place.
Utilities
LINESTRING(-86.53370040776576 39.165589312902114,-86.53481780506412 39.165600008516975)
Lane Closure at 2038 N Walnut St for Repaving 2038 N Walnut St in the eastern lane May 22, 2024 to May 23, 2024
The eastern lane on N Walnut St in front of 2038 N Walnut St will be closed during the day while the lane is mill and repaved.
Engineering
LINESTRING(-86.53426200148884 39.184028655267866,-86.5343571164039 39.184574823936345)
BSM Lane Closure 500 S Liberty Drive May 23, 2024 to July 23, 2024
UG Duct placement by directional bore, place 1-2" duct and fiber optic cable at a minimum depth of 48" as well as placing 2 vaults. Boring along and under Liberty Dr approx. 878' within the ROW. (See Plans); The work will primarily be in the tree plot area across from 500 S Liberty Dr, but will include temporary lane closures during the duration of work. The work is expected to take 2 days.
External Project
LINESTRING(-86.57912577782346 39.16456537141559,-86.5791543460415 39.16366552411955)
Road Closing North Dunn St Closing Both lanes of the 1200 Block N Dunn St between E 15th & E 16th St 8am-2pm Friday 5/24 - Emergency Service Repair. May 24, 2024
Closing Both lanes of the 1200 Block N Dunn St between E 15th & E 16th St 8am-2pm Friday 5/24 - Emergency Service Repair.
Utilities
GEOMETRYCOLLECTION(POINT(-86.52835380662505 39.176871377111155),POINT(-86.52835380662505 39.176871377111155),POINT(-86.52835380662505 39.176871377111155),POINT(-86.52835380662505 39.176871377111155),POINT(-86.52835043764402 39.17686876547853),POINT(-86.52835043764402 39.17686876547853),LINESTRING(-86.52835043764402 39.17686876547853,-86.52835043764402 39.17686876547853,-86.52833696171994 39.17777238458456))
1st Street Reconstruction Project College Ave between 2nd Street and 1st Street. May 29, 2024 to June 7, 2024
One lane closure on College Ave between W 2nd Street
Engineering
LINESTRING(-86.53495278715314 39.16069186290528,-86.53498592865161 39.15895728147032)
B-Line Extension Project, Realignment of Crescent Rd and Fountain Dr. There will be a road closure at the intersection of Crescent Rd and Fountain Dr. June 3, 2024 to September 23, 2024 daily until September 30, 2024
At the intersection of Crescent Rd and Fountain Dr, there will be a road closure. This will be due to the realignment of the intersection. This road closure is scheduled for June 13th through mid-September. There will be a signed detour set up for the closure.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.5565857252374 39.17502141319386,-86.5565857252374 39.17502141319386,-86.55678109308725 39.175267524158926,-86.55687428768094 39.17538492398754),LINESTRING(-86.55657670779003 39.17539191458954,-86.55657670779003 39.17539890519083,-86.55678411183133 39.17526608404768))
CBU Road Closure - S Heritage Dr Culvert Repair S Heritage Dr at Morningside June 3, 2024 08:00 am to 15:00 pm June 6, 2024
Please be advised that CBU crews have closed S Heritage Rd at Morningside due to culvert repair. Normal traffic flow is expected to resume at 3:00pm Thursday 6/6. Road signs are in place.
Utilities
POINT(-86.48273358966797 39.16618713846404)
Blur Ridge Food Truck Nights Rusgan Dr. June 4, 2024 15:30 pm to 20:30 pm every 2 months on Tuesday until August 6, 2024
Food Truck Nights on 6.4 and 8.6
Public Works
GEOMETRYCOLLECTION(POINT(-86.53140132792392 39.20143152043971),POINT(-86.53205816766807 39.20111933064604),LINESTRING(-86.53139257006066 39.20141116027807,-86.53204940980481 39.20112611739543),LINESTRING(-86.53140132792392 39.20142473371979,-86.53140132792392 39.20142473371979),LINESTRING(-86.53141008578717 39.20141116027807,-86.5313838121974 39.20141116027807),LINESTRING(-86.53141884365041 39.20141794699924,-86.53141884365041 39.20141794699924),LINESTRING(-86.53144511724018 39.20141794699924,-86.53205816766807 39.20112611739543))
4th & Rogers Block Party 4th Street on either side of Rogers Street June 7, 2024 15:00 pm to 23:00 pm
5ht Annual 4th & Rogers Block Party
Public Works
GEOMETRYCOLLECTION(POINT(-86.53872690541577 39.16562785695015),POINT(-86.5393102858765 39.16563409568897),POINT(-86.53865314466785 39.16562785695015),POINT(-86.53808183414768 39.1656205784208),LINESTRING(-86.539311626981 39.16563409568897,-86.53872690541577 39.16562889674),LINESTRING(-86.53865314466785 39.16562785695015,-86.53808183414768 39.1656205784208))
Grandfaloon E Kirkwood Ave from N Walnut to N Grant St June 7, 2024 to June 9, 2024
Special event closure.
External Project
LINESTRING(-86.5335496687486 39.16658914108913,-86.52984220754429 39.16655311046307)
Granfalloon Mainstage Concert and Bloomington Handmade Market Kirkwood Ave and Courthouse Square June 7, 2024 12:00 pm to 00:00 am June 9, 2024
Granfalloon Mainstage Concert and Bloomington Handmade Market
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53484035455479 39.16756898224216,-86.53364617750566 39.16756594667493),POINT(-86.53484035455479 39.16756898224216),POINT(-86.53365009284023 39.16756898224216),LINESTRING(-86.53424522369752 39.16759933790732,-86.53426088503586 39.1676023734731),POINT(-86.5342530543667 39.16759933790732),LINESTRING(-86.53424522369752 39.16759933790732,-86.53424522369752 39.16759933790732),LINESTRING(-86.53424130836292 39.1676023734731,-86.53426480037045 39.16759933790732),POINT(-86.53235411709184 39.16610278801679),POINT(-86.53231887908055 39.16704686275091),POINT(-86.53171591755411 39.16704079157125),POINT(-86.5311247020314 39.16656420233173),LINESTRING(-86.53355220947556 39.166579380382785,-86.53235016265234 39.166570375913125,-86.53112078669683 39.166561166721124),LINESTRING(-86.53235020175725 39.16656723794222,-86.53235411709184 39.16610582364717),LINESTRING(-86.53232670974973 39.16704686275091,-86.53235020175725 39.16656723794222),POINT(-86.53355220947556 39.166576344772835),LINESTRING(-86.53484426988938 39.166594558430575,-86.53365400817484 39.16658241599262),POINT(-86.5336657541786 39.16658241599262),POINT(-86.53482077788186 39.166594558430575))
Bloomington Handmade market Monroe County Courthouse square, W 6th St, E Kirkwood June 8, 2024
10am - 4pm lane closures on 6th St and Kirkwood
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.53481894781791 39.167561629420874,-86.53365183376896 39.16755947497779),LINESTRING(-86.5336379395541 39.1666115136191,-86.5348411785617 39.166620131507216))
Lane Restrictions on E 5th St from N Union St to N Jefferson ST E 5th St from N Union St to N Jefferson St June 10, 2024 06:00 am to 16:00 pm June 13, 2024
Lane Restrictions on E 5th St from N Union St to N Jefferson St for milling and resurfacing.
Street
LINESTRING(-86.50934508887711 39.16680913954036,-86.50718572788277 39.16680913954036)
W Cottage Grove Ave from N Monroe St from W 10th St closed for tree removal W Cottage Grove Ave from N Monroe St to W 10th St June 10, 2024 08:30 am to 10:45 am
W Cottage Grove Ave from N Monroe St to W 10th St closed for tree removal.
Street
LINESTRING(-86.54706174323955 39.17261370728701,-86.54495301536237 39.17260322790224)
Lane Restrictions on S Union St/N Union St from E 3rd St to E 10th St S Union St/N Union St from E 3rd St to E 10th St June 10, 2024 06:00 am to 16:00 pm June 13, 2024
Lane Restrictions on S Union St/N Union St from E 3rd St to E 10th St for milling and resurfacing.
Street
LINESTRING(-86.50937950276902 39.16429899255601,-86.5094619999801 39.17151296439036)
Road Closure S Olive St between Hillside Dr and Thornton Dr June 14, 2024
For water line repairs
Utilities
LINESTRING(-86.51882501012486 39.15051745287485,-86.51878196900552 39.14830536970888)
Lane closure E Hillside E Hillside between Olive & Huntington June 14, 2024 07:00 am to 15:00 pm
Please be advised that CBU & AEG crews will close 1 lane of E Hillside Dr between S Huntington Dr and S Olive St due to hydrant maintenance tomorrow 6/14/24 between 7am and 3pm. Road signs and flaggers will be in place.
Utilities
LINESTRING(-86.52075706352264 39.15055433826328,-86.51892753957227 39.150535319804106)
Milling and Resurfacing on S Hawthorne Dr S Hawthorne Dr from E Atwater Ave to E 3rd St June 17, 2024 06:00 am to 16:00 pm June 28, 2024
Lane restrictions and no parking on S Hawthorne Dr from E Atwater Ave to E 3rd St for milling and resurfacing.
Street
LINESTRING(-86.520185917043 39.16314913110048,-86.52020008657907 39.16375337839088,-86.52010089982653 39.16401155519594,-86.5200725607544 39.16420930700147)
Milling and Resurfacing on S Fess Ave S Fess Ave from E Atwater Ave to E 3rd St June 17, 2024 06:00 am to 16:00 pm June 28, 2024
Lane restrictions and no parking on S Fess Ave from E Atwater Ave to E 3rd St for milling and resurfacing.
Street
LINESTRING(-86.52588745454378 39.163173695435205,-86.52588745454378 39.164271906840696)
Milling and Resurfacing on S Woodlawn Ave S Woodlawn Ave from E Atwater Ave to E 3rd St June 17, 2024 06:00 am to 16:00 pm June 28, 2024
Lane restrictions and no parking on S Woodlawn Ave from E Atwater Ave to E 3rd St for milling and resurfacing.
Street
LINESTRING(-86.52262915286194 39.163143758241176,-86.52263419423582 39.16345255542814,-86.52261907011416 39.16356981982756,-86.52263419423582 39.164234314398385)
Milling and Resurfacing on S Highland Ave S Highland Ave from E Atwater Ave to E 3rd St June 17, 2024 06:00 am to 16:00 pm June 28, 2024
Lane restrictions and no parking on S Highland Ave from E Atwater Ave to E 3rd St for milling and resurfacing.
Street
LINESTRING(-86.51772455888417 39.16314732578917,-86.517748749661 39.164216429008064)
Milling and Resurfacing on S Eagleson Ave S Eagleson Ave from E Atwater Ave to E 3rd St June 17, 2024 06:00 am to 16:00 pm June 28, 2024
Lane restrictions and no parking on S Eagleson Ave from E Atwater Ave to E 3rd St for milling and resurfacing.
Street
LINESTRING(-86.51640854897327 39.1641380177569,-86.51636945298957 39.163107379178854)
Milling and Resurfacing on S Ballantine Rd S Ballantine Rd from E Atwater Ave to E 3rd St June 17, 2024 06:00 am to 16:00 pm June 28, 2024
Lane restrictions and no parking on S Ballantine Rd from E Atwater Ave to E 3rd St for milling and resurfacing.
Street
LINESTRING(-86.51911427286858 39.16420068792465,-86.5191260596612 39.16314058344841)
Eastbound Lane Closure - S Hillside Dr CBU has closed the EB lane of E Hillside Dr between S Olive St & S Huntington Ave all day (8:15 to 2:00pm). June 17, 2024
Eastbound Lane of Hillside Drive between Olive & Huntington closed all day for a Fire Hydrant repair.
Utilities
LINESTRING(-86.52081989547338 39.1505289797378,-86.52081989547338 39.1505289797378,-86.51879903125774 39.15054208307956)
Olive Street Closure Olive Street between Thornton Dr and Hillside Dr. June 18, 2024
Water Line Repair
Utilities
LINESTRING(-86.51880956690688 39.150495194264636,-86.51880956690688 39.14952329934329)
Clear Creek Culvert Construction East-west alley behind Von Lee, near Indiana and Kirkwood intersection June 18, 2024 to August 26, 2024
Clear Creek Tunnel Project where excavations will take place from Dunn St going east down the alley behind Von Lee and across Indiana Ave ending in Dunn Meadow to accommodate new tunnel. Project timeline is expected to span February to early August.
External Project
LINESTRING(-86.52693489574652 39.16657257603211,-86.52694760469213 39.16714735604705)
Vertical Soil Boring, Washington, Lincoln, 19th N Washington (south of 19th to dead end), E 19th (from Washington to Lincoln), and N Lincoln (from 19th to 17th) June 20, 2024 to June 21, 2024
Lane restrictions on N Washington (south of 19th to dead end), E 19th (from Washington to Lincoln), and N Lincoln (from 19th to 17th) from 6/20/24 to 6/21/24 for 15 vertical soil borings in the roadway by Patriot Engineering.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53224629091694 39.17989809038619,-86.53198182035625 39.18127400081394),LINESTRING(-86.5319716484379 39.18127400081394,-86.53092393777207 39.18112418957335),LINESTRING(-86.53092393777207 39.18112418957335,-86.5309798831524 39.17895977527772))

Please enable Javascript

To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.

This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.