Allen St. Bridge
Bridge between S Morton and S Walnut (150-156 W Allen St)
January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
Hopewell Project
South Morton Street from West 1st Street to West 2nd Street.
August 7, 2023 to November 30, 2024
South Morton Street from West 1st Street to West 2nd Street will be closed to through traffic. Detour in place.
Engineering
LINESTRING(-86.53630036983884 39.159437140754676,-86.53628425635348 39.16133312709155)
Road Improvements/Expansion by Crider & Crider
The 45/46 Bypass between Arlington and N Kinser Pike
March 9, 2024 to November 6, 2024
Crider and Crider will be working on multiple projects on 45/46 between Arlington Road and N Kinser Pike. This will include lane restrictions temporary closing of the N Monroe Street intersection on the South side, and other possible changes.
External Project
LINESTRING(-86.55129909883534 39.18708881369716,-86.53779354307697 39.1865871937342)
1st Street Reconstruction Project
1st Street between South College Ave to South Rogers Street
March 18, 2024 to November 30, 2024
Closure of 1st Street between South College Ave to South Rogers Street. A detour route is set in place.
Engineering
LINESTRING(-86.53860272873037 39.15942790212222,-86.53504216360619 39.15940182915014)
B-Line Extension Project, from Adams St along Fountain, up Crescent Rd to 17th St.
Adams St along Fountain Dr., up Crescent Rd. to 17th St.
April 1, 2024 to November 15, 2024 daily until November 15, 2024
B-Line Extension Project. This project runs from Adams St along the north side of Fountain Dr., up the east side of Crescent Rd to 17th St. There will be lane restrictions throughout the project.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55154570965307 39.170728870443895,-86.55521901332583 39.17334679210555,-86.55670122308807 39.175225240685876),LINESTRING(-86.55673989032744 39.17525521592228,-86.55652078039554 39.17572481971655,-86.55659811290778 39.17904193408043))
1st Street Reconstruction Project
West 1st Street Between South Fairview Street to South Rogers Street
May 13, 2024 to November 30, 2024
Closure of 1st Street between South Fairview Street to South Rogers Street. A detour route is set in place.
Engineering
LINESTRING(-86.53873635585423 39.15942941125837,-86.54245334738789 39.159439631532734)
Ensite USA Lane Intermittent Lane Restrictions For Pressure Testing Natural Gas Lines
2038 N Walnut
June 1, 2024 to October 11, 2024
Moving lane closures for hydrotest of existing 8" gas lines. Some areas of new lines and equipment with tie-ins. Sidewalk closure on High St for 5 days.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.53120551005871 39.11395061862322,-86.53348819068572 39.113903178012976),LINESTRING(-86.53116474790465 39.113934805090025,-86.53132779652087 39.12144583385478),LINESTRING(-86.53111383336406 39.13602532041941,-86.53140386084674 39.13479464759729,-86.53138680040658 39.12144112654539),LINESTRING(-86.5305720652385 39.139210466645835,-86.53039227748548 39.13835129405166,-86.53039227748548 39.137833986124036,-86.53049087076938 39.13739764517783,-86.53108823007783 39.136030126138195),LINESTRING(-86.53049043796307 39.13920596838727,-86.52917972724747 39.139201470128455),LINESTRING(-86.5305720652385 39.1392059683873,-86.53047927155953 39.1392059683873),LINESTRING(-86.52859976675386 39.13926444572573,-86.52800240744543 39.13926444572573,-86.52785741732201 39.139201470128455,-86.52764283193937 39.139367905513296,-86.52741664734687 39.13943987744972,-86.52692948053222 39.13943537920588),LINESTRING(-86.52168083806495 39.13951184931261,-86.52418626739741 39.13951184931261,-86.5255607737673 39.13943537920585,-86.5269236809273 39.1394443756933),LINESTRING(-86.52118207204047 39.139349912517645,-86.52107767915162 39.139489358113366,-86.52111827638618 39.13967828396366),LINESTRING(-86.51760182917636 39.13990769324323,-86.51761342838623 39.13947136514881),LINESTRING(-86.50819802914363 39.13955438815074,-86.50818063032885 39.13887065289603),LINESTRING(-86.42408040956772 39.230678706070194,-86.42724426328235 39.230608684893895,-86.43022732535613 39.23092377963698,-86.43696181397726 39.225917106925806,-86.44062284470418 39.225006764422545,-86.44184318827983 39.222170621703526,-86.4422499694717 39.22034982770893,-86.44365110468819 39.21940439681532,-86.44622738557008 39.21961449366981,-86.45128955151348 39.21940439681532,-86.45260029090954 39.219124266697975,-86.45345905120352 39.21849396984703,-86.45373023866478 39.217688582302486,-86.45373023866478 39.21688318551878,-86.4539562282158 39.216182832979456,-86.4554025613425 39.215552509720965,-86.45684889446923 39.21366150599354,-86.45919918580009 39.2129961407183,-86.46050992519613 39.21243582822794,-86.46344778935972 39.20991436669351,-86.46331219562907 39.20424074722408,-86.4661330280818 39.202885940405906,-86.46753416329828 39.2013098232614,-86.46789574657994 39.20046921299138,-86.46780535075948 39.193253561143706,-86.46807653822074 39.19213261668949,-86.46807653822074 39.18687795120445,-86.4740426623683 39.1794506872906,-86.48131952591194 39.175071036557085,-86.482630265308 39.17272343146067,-86.48177150501404 39.172092718227304,-86.48131952591194 39.1713218388154,-86.48131952591194 39.16417328179779,-86.48091274472006 39.163262138995435,-86.48050596352815 39.150154394364876,-86.49759077358713 39.15043479948682),LINESTRING(-86.49285279658983 39.13942683294084,-86.49304883713235 39.13925242077448),LINESTRING(-86.49088662526624 39.13940000032798,-86.4908577957747 39.13954310747832),LINESTRING(-86.48814205767077 39.13936869560007,-86.48814205767077 39.139543107478346),LINESTRING(-86.48353913527845 39.142705997590895,-86.48344688090549 39.14264339106123),LINESTRING(-86.54206416281144 39.096184637318345,-86.53882744313331 39.09861873988905,-86.53790657359109 39.09930508501898),LINESTRING(-86.537943043672 39.099298009330084,-86.5391647913815 39.101526816216534),LINESTRING(-86.5366210032402 39.10729308481797,-86.5360283644259 39.10728600993079),LINESTRING(-86.53491602695907 39.11093655735394,-86.53492514447927 39.110526233936355),LINESTRING(-86.54514588464586 39.09298621201265,-86.54458059839222 39.09298621201265),LINESTRING(-86.54283856952594 39.08762620679576,-86.5432670929763 39.08860988354252))
AEG Lane and Sidewalk Closure for Fiber Installation
215 N Pine St
June 7, 2024 to October 16, 2024
BLS01b-F09_N Pine St; Aerial and underground fiber placement and excavations along N Adams St, N Elm St, N Pine St, W 3rd St, S Patterson Dr, W Bloomfield Rd, S Walker St, and W 1st St, and nearby alleys, easements and neighborhoods.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.54654491710684 39.15881629133335,-86.54848985475172 39.1607683092553,-86.5518718299178 39.16416246706237,-86.55194172212703 39.164270847382426,-86.55196322742216 39.16439590139038),LINESTRING(-86.54949234547449 39.163334434240966,-86.550610620822 39.16262994979749,-86.55081492112586 39.16236316094751,-86.55085255539237 39.16215890005034,-86.55083642642101 39.161087562774526),LINESTRING(-86.55074926967761 39.15950966328671,-86.55082821152111 39.16036660913508,-86.55084256458356 39.16053354542322,-86.55083538805235 39.16110112583988),LINESTRING(-86.55033681540586 39.16435982300004,-86.55025626156575 39.16437855992109,-86.54628495724837 39.16435045453767),LINESTRING(-86.54629301263238 39.164347331716584,-86.5461037111081 39.16039372904493),LINESTRING(-86.54851019193457 39.16075612652455,-86.54925655118225 39.16046120641366,-86.54998855736747 39.1603610445853,-86.55151715851898 39.16041112551727),LINESTRING(-86.5552310693604 39.16618831773991,-86.55420956784104 39.1658548483891,-86.5540375254799 39.16573396535901,-86.5539998912134 39.1653254625476,-86.55387085944253 39.165050347072395,-86.5538439778236 39.16481274647785,-86.55390849370903 39.16443341754942,-86.55632566964138 39.16444540555574,-86.55642998956468 39.16444592293129),LINESTRING(-86.54962391392088 39.16764183086997,-86.54961585853687 39.16668004043106,-86.5496440523809 39.1664270998522,-86.55044556309001 39.16513427824316),LINESTRING(-86.55075978623071 39.16865767822634,-86.55065734613454 39.16868415181918,-86.5496329451728 39.16865105982657,-86.54962440849813 39.16764505582077,-86.55098600810976 39.167658292808994),LINESTRING(-86.54538970135383 39.17047942192269,-86.54539396969118 39.16956940968345,-86.54523177287223 39.16957602799678,-86.54527497274813 39.16809842124928),LINESTRING(-86.54527924108547 39.16810834892672,-86.54526643607345 39.16809842124928),LINESTRING(-86.55399931136817 39.16068125300217,-86.55405845092982 39.161052264842084,-86.55434339609047 39.16141910608587,-86.55492403905937 39.16173592198422,-86.55559607953265 39.162040230648415,-86.55599392749279 39.16238622383179,-86.55621435676804 39.16276973235975,-86.55629500162482 39.16334915975679,-86.55632565300628 39.16444742191237),LINESTRING(-86.55388698841385 39.16443341754939,-86.55197301714603 39.164387564463425),LINESTRING(-86.5538810322448 39.16342002465049,-86.55387027959723 39.162561304071346),LINESTRING(-86.55387027959723 39.1634283616921,-86.55335415251376 39.16340751908618,-86.55275200424974 39.16330747449189,-86.55193480303424 39.163290800379,-86.55154233139787 39.16335332828194,-86.55132727844642 39.16340751908618,-86.55101007534304 39.163628450394555,-86.5509133015149 39.16377434804795,-86.55085953827704 39.1639911097171,-86.55077889342023 39.164166185962216,-86.55060685105909 39.16427039780598,-86.5504509376693 39.164345430237915,-86.55035416384113 39.16435793563548),LINESTRING(-86.55386867303636 39.16256325267983,-86.55245469988064 39.162509061225194,-86.55216975471997 39.16253407267101,-86.55172351984571 39.16256325267983),LINESTRING(-86.55526879575547 39.159275948970986,-86.55388372522852 39.15997708958892,-86.55295795270014 39.16022193069824,-86.55201065057811 39.16034991548446,-86.5515441760483 39.16041112551727),LINESTRING(-86.55386219563485 39.15997708958892,-86.55399137319694 39.16018854332441,-86.55399854972816 39.16067822321918))
AEG Lane and Sidewalk Closure for Fiber Installation
1100 S Strong Drive
June 7, 2024 to October 9, 2024
BLS01a-F07_S Strong Dr; Aerial and underground fiber placement and excavations along W Allen St, S Patterson Dr, S Rogers St, S Rockport Rd, and nearby alleys, easements and neighborhoods.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.5474537977065 39.156692681853116,-86.54724501963672 39.15698408524108),LINESTRING(-86.54880709030955 39.156997036474706,-86.54914113522118 39.15701646332079,-86.54914113522118 39.15768344844801),LINESTRING(-86.54823921395977 39.157184829095144,-86.54880709030955 39.156997036474706),LINESTRING(-86.54914113522118 39.15700998770603,-86.5500096519914 39.1570488413856),LINESTRING(-86.54724501963672 39.15698408524108,-86.54722831739113 39.157145975490636),LINESTRING(-86.54643496072603 39.15766402178616,-86.54656857869068 39.15746327929929,-86.54676900563766 39.15734024329848,-86.54702830115511 39.15728196301242,-86.54767133761001 39.15723015827322,-86.5479469246621 39.15723015827322,-86.54823086283699 39.15717187789602,-86.54827261845094 39.157696399552975),LINESTRING(-86.54734523311022 39.15801370087931,-86.54732853086463 39.15741147469359,-86.54724501963672 39.15724310946163),LINESTRING(-86.54723666851393 39.15724958505487,-86.54723666851393 39.15724958505487),LINESTRING(-86.55187989278568 39.155857318785536,-86.55053536201636 39.15586379450639,-86.54856449703775 39.15577961008901,-86.54797282768028 39.15575843472962,-86.54747885107496 39.155740755708536,-86.54579192427124 39.15566952262202,-86.54336174753915 39.15566304688329),LINESTRING(-86.54732853086463 39.15956133377543,-86.54337009866182 39.1558896973838,-86.54334504529346 39.15566952262202),LINESTRING(-86.54797156731952 39.15577961008901,-86.54795486507393 39.156025687333624,-86.54782124710928 39.15623938529524,-86.54736193535578 39.156025687333624,-86.5468274634972 39.15607749295967,-86.5465602275679 39.156038638743695,-86.54630134276138 39.15609692005961),LINESTRING(-86.54914113522118 39.157022938934944,-86.54906597511606 39.156232909608974),LINESTRING(-86.54783794935486 39.15625881235047,-86.5474537977065 39.15666677927135),LINESTRING(-86.54625123602463 39.15647250960404,-86.54640155623487 39.156595547122265,-86.54669384553253 39.156653827976896,-86.54708634830371 39.15658259581471,-86.54733688198743 39.1566279253808,-86.54743709546091 39.15666677927135),LINESTRING(-86.5500096519914 39.1570488413856,-86.55059423058675 39.157029414548504),LINESTRING(-86.54998459862303 39.15632356916251,-86.55007646097374 39.157780581676974),LINESTRING(-86.5386912331071 39.153806436999076,-86.53803984552944 39.15379348517811,-86.53772250286339 39.15368339460372,-86.53689574170713 39.15338550159771,-86.53620259851549 39.15336607374917),LINESTRING(-86.54011092398153 39.15382586472603,-86.53871628647549 39.15379348517811),LINESTRING(-86.53871628647549 39.15379348517811,-86.53871628647549 39.154544686853,-86.53949294089502 39.154544686853),LINESTRING(-86.54010257285877 39.153819388817624,-86.54138864576854 39.15385176835363,-86.54184795752204 39.15398776224214,-86.54213189569691 39.15420794226628,-86.54244923836296 39.154693631059985,-86.5428584433797 39.15496561532012,-86.5432552386038 39.155240927060106,-86.5433554520773 39.155661851362254),LINESTRING(-86.53886817151646 39.146078698834344,-86.5388830515255 39.146344118945905),LINESTRING(-86.53888604680253 39.146308277205264,-86.53881916233365 39.150604822192406),LINESTRING(-86.54290065396913 39.146413358810406,-86.53891281154361 39.14633257896185),LINESTRING(-86.53642246886542 39.15053566459159,-86.53883030974512 39.150596177496),LINESTRING(-86.53881916233365 39.150604822192406,-86.5394657121995 39.15063075627518,-86.53981128195538 39.15073449251079,-86.54008996724238 39.15102841101455,-86.54016799912273 39.15125317139504,-86.54016799912273 39.15151250940363),LINESTRING(-86.53886170644611 39.146065172242146,-86.53914997548924 39.146015491354774,-86.53946853990509 39.14570345341252,-86.54194833338971 39.143274416508234),LINESTRING(-86.53889793153456 39.143828357674096,-86.53889793153456 39.14452077800132,-86.53770753081051 39.14452077800132),LINESTRING(-86.5388830515255 39.14449769743348,-86.53886817151646 39.146078698834316),LINESTRING(-86.53947825188753 39.14570941701416,-86.54121921294642 39.14577865750303))
AEG Lane and Sidewalk Closures for Fiber Installation
W 4th, Madison, Smith, Prospect, 3rd, Washington, Walnut, College
July 10, 2024 to October 10, 2024
BLN01b-F18_W Smith Ave UG / Aerial fiber construction 4th, Madison, Smith, Prospect, 3rd, Washington, Walnut, College; Work in these areas is scheduled between July 10th and October 10th, 2024. This permit was approved by the Board of Public Works on June 18th, 2024.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53701130346923 39.16287855668401,-86.53179269793867 39.16283894288284),LINESTRING(-86.53628142856985 39.161961774427,-86.53625223357388 39.16561185508968),LINESTRING(-86.53623763607588 39.165589219514175,-86.534931160006 39.16559487840874),LINESTRING(-86.53617194733495 39.16456495210085,-86.53235470161144 39.16456495210085,-86.5316467229588 39.16456495210085),LINESTRING(-86.53426697384756 39.165108211812935,-86.53430346759276 39.16193913767697),LINESTRING(-86.53303348526784 39.161967433613455,-86.53301158902087 39.163902848653805,-86.5323911953564 39.163891530592,-86.53235470161144 39.16454797516724),LINESTRING(-86.5312817855094 39.15936981921055,-86.5321211416437 39.159375478605455,-86.53210654414572 39.16040548089447,-86.53180729543696 39.16039416226991,-86.53179269793897 39.16285026111407),LINESTRING(-86.53867541823979 39.16232396143772,-86.53866082074182 39.161961774427),LINESTRING(-86.53866811949082 39.161927819299166,-86.53841266327603 39.16194479686516,-86.53823019455119 39.161916500919546,-86.53805502457533 39.16194479686516,-86.53628142856985 39.161933478488294),LINESTRING(-86.53805502457533 39.162872897570935,-86.53863162574585 39.162872897570935),LINESTRING(-86.53805502457533 39.16587216368424,-86.53804772582626 39.16448006739179,-86.53804042707728 39.16331430702442,-86.5380404270773 39.162872897570935,-86.53804042707733 39.16239753044644),LINESTRING(-86.53625223357388 39.16561185508968,-86.53742733216187 39.16560619619648,-86.53743463091087 39.1658268926935))
AEG Lane and Sidewalk Closures for Fiber Installation
Davis, Grimes, Driscoll, Lincoln, Hillside, Dunn, Henderson, Fess, Brenda, Park, Stull, Wilson
July 10, 2024 to October 10, 2024
BLC02a-F10_S Stull Ave Fiber and Conduit install - Davis, Grimes, Driscoll, Lincoln, Hillside, Dunn, Henderson, Fess, Brenda, Park, Stull, Wilson; Work in these areas is scheduled between July 10th and October 10th, 2024. This permit was approved by the Board of Public Works on June 18th, 2024.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52643423871059 39.152451401686875,-86.52643423871059 39.153927157741975),LINESTRING(-86.52543797326162 39.15400598999378,-86.52545017243037 39.15345731568942),LINESTRING(-86.5243237825146 39.15402490972107,-86.52433191529383 39.15195632274421),LINESTRING(-86.52318599087947 39.15402755956592,-86.52316806134078 39.15144146380405),LINESTRING(-86.52976014121184 39.1541670448276,-86.52863375129607 39.154182811231294),LINESTRING(-86.52975607482227 39.15513509546287,-86.52975200843268 39.154179657950834),LINESTRING(-86.52863375129607 39.15522023282949,-86.52864996525595 39.150501682844606),LINESTRING(-86.52846990959189 39.15244504836713,-86.52762816694725 39.15243874165037),LINESTRING(-86.52815273120405 39.15051689795655,-86.52811613369776 39.15332482982035),LINESTRING(-86.5280873715874 39.15377816989928,-86.52808330519784 39.15418179095164,-86.52700977834671 39.154184944231986,-86.52696380853179 39.15183003319538,-86.5269395463089 39.150587112441684),LINESTRING(-86.52693394884997 39.15056790516553,-86.52815321626218 39.150525232819774,-86.52864589886637 39.15050798973502,-86.52978313391344 39.150499406624306,-86.53031718498701 39.15049537595365,-86.53086212141766 39.150502771329144,-86.53194374082207 39.150517450069515),LINESTRING(-86.53194374082207 39.15052691040279,-86.53190307692624 39.15312186474179),LINESTRING(-86.53086208119167 39.150504553891835,-86.53083361646456 39.15159879087159,-86.53077262062075 39.15171231304237,-86.53078481978957 39.15299109425635),LINESTRING(-86.53078075339998 39.153347420071896,-86.52982213073842 39.153338854409014,-86.52811615181103 39.1533236108273,-86.52544615135896 39.1532997533337,-86.52266400058363 39.1532748937247),LINESTRING(-86.52982197453265 39.15334936679554,-86.52982604092223 39.152283537331016),LINESTRING(-86.52978335342873 39.15051689795655,-86.52980368537668 39.15130210129493),LINESTRING(-86.52546237159892 39.151398172243574,-86.52544610604056 39.15330280318807),LINESTRING(-86.526950670188 39.15183018742505,-86.52545830520934 39.15182703403917))
AEG Lane and Sidewalk Closure for Fiber Installation
W Countryside Ln between Summit Elementary School and Rockport Rd, Rockport Rd, S Rogers St
July 10, 2024 to October 10, 2024
BLS01a-F06, Hoosier Fiber network. Aerial / UG Fiber install, Thomson Park, Cardinal, Susie, Countryside, Cutter, Zona, Adams Hill, RCA Park, Harmony, Rogers, Star View, Peoples, Quarry, Terra, Rockport, Boulder, Jed, Joy, Jean, Maston, Coolidge, Bryan, Graham, Banta, Milton, Ford; Work in these areas is scheduled between July 10th and October 10th, 2024. This permit was approved by the Board of Public Works on June 18th, 2024.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.54631305807585 39.14316710962075,-86.5462248728582 39.14274154628907,-86.54607256503786 39.1424367037005,-86.54592112377513 39.14213359420958),LINESTRING(-86.5457349549823 39.142498366087324,-86.54601910735032 39.14245276970598),LINESTRING(-86.54469632908537 39.14312911299933,-86.54477471594551 39.14253636304923),LINESTRING(-86.54316778531255 39.14328109936204,-86.54310899516744 39.14306831836234,-86.54334415574787 39.142566760603984),LINESTRING(-86.54322657545765 39.143334294511476,-86.54345929714562 39.143703871928864,-86.54373020675533 39.144134091845245,-86.54384387198128 39.14431459792593,-86.54414762106435 39.14455017268094,-86.54534302068157 39.14460336687134),LINESTRING(-86.54483350609063 39.144079022382584,-86.54464733729779 39.14401062933521,-86.54437298328727 39.143934636982465,-86.5440692342042 39.14406382393335,-86.54377528347867 39.14411701849127),LINESTRING(-86.54370669497605 39.14413221692902,-86.54349113111064 39.144231006694355,-86.54338334917794 39.144481780091326,-86.54346173603808 39.14466416018254),LINESTRING(-86.54345193768057 39.1437066594319,-86.54305020502234 39.14382824755074,-86.5425406904314 39.14423860590131,-86.54227613477839 39.14433739551731,-86.54210956270059 39.14434499471281),LINESTRING(-86.5420703692705 39.14429939952757,-86.54200178076789 39.14426900272102,-86.54170783004234 39.14430699872719,-86.54174702347241 39.14446658172906,-86.54208016762803 39.14446658172906,-86.54209976434308 39.144360193101335),LINESTRING(-86.54513549940762 39.13998222528545,-86.54314864339705 39.13992942808605,-86.54202072890448 39.1398994557272,-86.538650514893 39.1398098980965,-86.53700909928338 39.13976628026347,-86.53642136569616 39.13975066223466),LINESTRING(-86.54513549940762 39.13993880727145,-86.54382931234173 39.14134264282694,-86.54181144809243 39.143400231932986,-86.54148750553061 39.14373054621527),LINESTRING(-86.5365799741256 39.14116173775446,-86.54381998243403 39.14136435140438),LINESTRING(-86.54314822908583 39.13993880727145,-86.54327884779241 39.14135711521266),LINESTRING(-86.54201931026455 39.13993157093316,-86.5421965785092 39.14201560561531),LINESTRING(-86.54117028867168 39.14188535525511,-86.54109564941076 39.141284753254325),LINESTRING(-86.54085307181279 39.14038745879154,-86.5407877624595 39.13909215064646),LINESTRING(-86.54006935957324 39.14193600820161,-86.53974281280674 39.13908491422117),LINESTRING(-86.53889379121387 39.14376672594673,-86.53889379121387 39.14310825192419,-86.53889379121387 39.14243529958108,-86.53889379121387 39.142203744599044,-86.5386512136159 39.13979408036471,-86.53852992481693 39.139055968512565),LINESTRING(-86.53772755276212 39.14187811911691,-86.5374383256261 39.13922964258572),LINESTRING(-86.53700914987586 39.13976513494768,-86.536981160153 39.139316479461655),LINESTRING(-86.53659863394084 39.14181299383978,-86.53654536599629 39.14116344500846,-86.53643069560377 39.13976513494768),LINESTRING(-86.53888446130632 39.14243529958108,-86.53676657227795 39.14237017481935,-86.53676657227795 39.143079307869755,-86.53887513139871 39.14310825192419),LINESTRING(-86.55239783809462 39.142042400944774,-86.55196671036381 39.14230078155481,-86.55138860727024 39.14237677567141,-86.5508304209238 39.14238078417148,-86.54927216204632 39.142391974484894,-86.54884206759071 39.14244979368982,-86.54853728523247 39.142490766692504,-86.54835754140025 39.14253639027905,-86.54799837556898 39.142627555674096,-86.54664620223149 39.14310631501661,-86.54631153039777 39.14316154095306,-86.54618567942812 39.14318230826359,-86.5446956161204 39.14314743951445,-86.54391246048392 39.14312911299933,-86.5435793163283 39.14317470894258,-86.54319147914794 39.14331932189461,-86.54256028714643 39.14355467398801,-86.54219774791825 39.14354707470716,-86.54181561197504 39.14340268821596),LINESTRING(-86.55180013828601 39.141578833355624,-86.55185892843112 39.14128245247761,-86.55176094485594 39.14092527386404,-86.55146699413041 39.14075808325211,-86.550986874612 39.14068968697819,-86.55078110910412 39.14139644527066,-86.55083010089172 39.142353977445055),LINESTRING(-86.54969349141962 39.143524276859836,-86.54939954069407 39.14350907829083,-86.54909579161101 39.1433114965952,-86.54901007680076 39.143170231155324,-86.54893901789072 39.14305311969491,-86.54884103431554 39.14244517030619),LINESTRING(-86.54899780803582 39.14317470894258,-86.54883123595802 39.143258301428546,-86.54890962281817 39.14337229102216,-86.54905659818094 39.14334189381523),LINESTRING(-86.54835111643963 39.142521164266924,-86.54815514928926 39.1421563925073),LINESTRING(-86.54733208725774 39.14285553671948,-86.54702833817468 39.14217159136837))
Duke Energy Work
628 S Smith Rd
August 1, 2024 to October 31, 2024
WO # 42444463, 1-2 day lane closure western lane on S Smith Rd to Replace overhead equipment on pole # 814-4287
External Project
LINESTRING(-86.48076549853556 39.1610209163147,-86.48072597126855 39.15936971296048)
Downtown Street Maintenance Project
4th Street from Madison Street to Indiana.
August 26, 2024 to December 7, 2024
These areas will have lane and parking restrictions while milling, repaving, sidewalk, curb ramp and pavement markings are completed. Dates may vary.
Engineering
LINESTRING(-86.5374249646552 39.16555616012397,-86.52697360310442 39.16557286773963)
Lane and Sidewalk Closure for Fiber Installation at 1207 W 2nd St
1207 W 2nd St
August 26, 2024 to October 31, 2024
QC Communications will have a temporary lane closure on S Patterson Dr and a sidewalk closure along S Patterson Dr for 2 days for fiber installation work. The work is planned between August 26th, 2024 and October 31st, 2024.
Engineering
LINESTRING(-86.54843862813469 39.16073232825735,-86.54790691035276 39.160181635161564)
Downtown Street Maintenance Project
College from 4th Street to 11th Street
August 26, 2024 to December 6, 2024
These areas will have lane and parking restrictions while milling, repaving, sidewalk, curb ramp and pavement markings are completed. Dates may vary.
Engineering
LINESTRING(-86.5347999512804 39.17329156881223,-86.53484833322103 39.165571947686345)
Alley Closure for Fiber Installation
Alleyway west of 302 N Rogers St
August 26, 2024 to October 31, 2024
QC Communications will be closing the N-S alleyway between N Rogers St and B-Line Trail for fiber installation for 302 N Rogers St. The work is expected to take 2 days and will occur between August 26th, 2024 and October 31st, 2024.
Engineering
LINESTRING(-86.5380648865098 39.16862711996495,-86.53806802675007 39.16869528868389,-86.53804918530844 39.16904465233131)
Downtown Street Maintenance Project
Walnut Street from 3rd Street to 11th street.
August 26, 2024 to December 6, 2024
These areas will have lane and parking restrictions while milling, repaving, sidewalk, curb ramp and pavement markings are completed. Dates may vary.
Engineering
LINESTRING(-86.53356436993373 39.17321867995096,-86.53359843186503 39.164504105324795)
Downtown Street Maintenance Project
6th Street from Walnut to near Indiana Ave.
August 26, 2024 to December 2, 2024
These areas will have lane and parking restrictions while milling, repaving, sidewalk, curb ramp and pavement markings are completed. Dates may vary.
Engineering
LINESTRING(-86.53363224373408 39.16561155500605,-86.52690403825018 39.165552529069174)
Alley Closure for Utility Line Work
Alleyway north of E Atwater Ave between S Ballantine Rd and S Highland Ave
August 28, 2024 to October 30, 2024
Smithville will be working in the alleyway north of E Atwater Ave between Ballantine Rd and Highland Ave for a day between August 28th and October 30th to attach anchors to the existing line. The alleyway is the only closure required.
Engineering
LINESTRING(-86.5190771402814 39.16352127634349,-86.5185644503293 39.16352504423418)
Temporary Lane Restriction for Utility Pole Maintenance from Storm Damage
S Walnut St between E Burks Dr and E Rhorer Rd/W Gordon Pike
August 29, 2024 to November 28, 2024
Smithville will be on the shoulders of S Walnut St with the potential for a 30 minute lane closure between August 28th, 2024 and November 28th, 2024 while they reattach down guys to the poles after the recent storm damage. The work is not expected to take the full 3 month period, but only a few days.
Engineering
LINESTRING(-86.53137836111604 39.12665877608285,-86.53136833979904 39.121504382067144)
Rolling Lane Closure for Fiber Installation - AT&T
W Country Club Dr at S Madison St; S Rogers St between W Ralston Dr and W Watson St
August 30, 2024 to December 31, 2024
Lineal will be working for AT&T to install fiber to connect to existing infrastructure for about 2 weeks between September and December 2024.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53768325285297 39.13604253720001,-86.53709024499783 39.13601780782696,-86.53722414999739 39.1371207294211),LINESTRING(-86.53911157284814 39.13840167945304,-86.53844842427895 39.13837695090854,-86.53828263713665 39.136799251816626))
Bloomington Gateway Phase 1 - Old 37 at College & Walnut Road Closure
N Old State Rd 37 between N College Ave and N Walnut St
September 2, 2024 to November 15, 2024
The Bloomington Gateway Phase 1 Project will be closing the cut-thru of Old State Rd 37 between N College Ave and N Walnut St for their reconstruction of the median and roadway. Vehicles will be detoured to W 17th St and the Bypass and pedestrians will be detoured along College Ave and Walnut St for the duration of the project.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.5345684940967 39.183402760340044,-86.53429222656817 39.183399641758854,-86.53419030262559 39.18337261404943),LINESTRING(-86.53457251741023 39.18333830963414,-86.5341889615211 39.183353902552284))
Near West Side Neighborhood Traffic Calming Circle Closures
W 6th St and N Waldron St
September 16, 2024 to October 28, 2024
Street closures for mural designs on five traffic calming circles located on
W. 6th and W. 7th streets: 6th and Oak, 6th and Waldron, 7th and Oak, 7th and Waldron, 7th and Pine. 3-5 days each over 5 weeks, beginning 9/16/24 and ending on 10/28/24.
W 6th and Waldron roundabout - intersection closed from 9/16 through 9/20
W 6th and Oak roundabout - intersection closed from 9/23 through 9/27
W 7th and Waldron roundabout - intersection closed from 9/30 through 10/4
W 7th and Oak roundabout - intersection closed from 10/7 through 10/11
W 7th and Pine roundabout - intersection closed from 10/14 through 10/28
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.54378473073827 39.16863025596706,-86.54366743457176 39.168625819927655),LINESTRING(-86.5437767414241 39.16763180585767,-86.5437027124389 39.167634301275825),LINESTRING(-86.5437413363142 39.16766175093315,-86.54373811763064 39.16760352436111),LINESTRING(-86.54371320879198 39.16857924166632,-86.54372465212877 39.16866130810806),LINESTRING(-86.54850654410679 39.168655311796954,-86.54840666523575 39.168655311796954),LINESTRING(-86.5484637389541 39.168629500079334,-86.54845660467126 39.16868849830726),LINESTRING(-86.54694594729979 39.16864847784214,-86.54683838219486 39.168644851972374),LINESTRING(-86.54690408528283 39.16763500334204,-86.54680843925688 39.16763500334204),LINESTRING(-86.54688982629276 39.1686049678074,-86.54688982629276 39.16866298113496),LINESTRING(-86.54684969842509 39.167581204934294,-86.5468515738093 39.16766699156949))
W 3rd St Maintenance Project, from Franklin Rd to Patterson Dr
This project will have lane restrictions and sidewalk restrictions along W 3rd St between Franklin Rd and Patterson Dr.
September 23, 2024 to November 26, 2024 daily until September 27, 2024
This project includes replacing curb ramps and sidewalk areas along W 3rd St. It also includes the milling and resurfacing of all lanes of W 3rd St. There will also be lane markings reinstalled along W 3rd St. This is between Franklin Rd and Patterson Dr.
Engineering
LINESTRING(-86.57022929212846 39.16453550162967,-86.55195583143485 39.164370756674714)
Underground conduit installation across S Walnut St at E Miller Dr
S Walnut St at E Miller Dr
September 23, 2024 to October 30, 2024
Lineal will be installing underground conduit for AT&T along S Walnut St and then to E Miller Dr between 9/23/2024 and 10/30/2024. The work will include a shifting lane and sidewalk closure at the area and will take no more than 10 days to complete.
Engineering
LINESTRING(-86.53278077719492 39.14728964948995,-86.53266275999826 39.14691314644122,-86.53192649362369 39.146920426906036)
Conduit installation along S Walnut St Pike and E Winslow Rd
S Walnut St Pike & E Winslow Rd; S Henderson St & E Winslow Rd
September 23, 2024 to December 27, 2024
Lineal will be installing conduit for AT&T to connect some of their existing infrastructure at the intersections of E Winslow Rd, S Walnut St Pike, and S Henderson St. The work is estimated to take about 7 days to complete and will include a lane and sidewalk closure at the locations. The work is planned between September 2024 and December 2024.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52873739116825 39.13589253529207,-86.52881526461753 39.13599488412237,-86.52887777603895 39.13607704257987),LINESTRING(-86.52880758360358 39.13599840018847,-86.52684219541364 39.13605889434348),LINESTRING(-86.52695179841065 39.13439149649986,-86.52678625012067 39.13439716166707))
527 N Grant St Utility Extension
N Grant St From E 10th St to E 9th St
September 30, 2024 to October 20, 2024
Road closure on N Grant St between E 9th and E 10th St in addition to the closure of the western sidewalk. The closures will begin 09/30/2024 and finish 10/20/24. This request is to accommodate utility extension for a new building project at 527 N Grant St. The road closure is anticipated to only occur for 1 week in the date range.
Engineering
LINESTRING(-86.52976111748318 39.17162965251961,-86.52977327000572 39.17048967362132)
Duke Energy Lane Closure
1533 E Elliston Dr
October 1, 2024 to October 31, 2024
WO# 40290231, 1-2 day lane closure to replace equipment on pole # 276-436.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.5137934810275 39.129526706081464,-86.51400184084244 39.12954286899415,-86.51443344331624 39.12941818357194,-86.51465073283752 39.12943896449099,-86.51599614192826 39.13002775464861),LINESTRING(-86.51599614192826 39.13002544567718,-86.51599911849704 39.13003006361993))
Duke N Fee Ln Lane Closure & Pole Installation
825 N Fee Lane
October 1, 2024 to December 31, 2024
Duke Energy will be installing new pole off of N Fee Ln. 1-2 day Lane restrictions only along N Fee Lane adjacent to 825 N Fee Lane in the date range of 10/1/24-12/31/24.
Engineering
LINESTRING(-86.51889218280641 39.17404346449811,-86.51891578629485 39.17426054630877)
Duke Energy Work
1533 E Elliston Dr
October 1, 2024 to October 31, 2024
WO# 40290231, 1-2 day lane closure to replace equipment on pole # 276-436.
External Project
POINT(-86.5138650047762 39.12952797130703)
Duke Energy Sidewalk and Lane Closure
1351 W Tapp RD
October 1, 2024 to October 15, 2024
Sidewalk closure and lane restriction at the NW corner of W Tapp Rd and Rockport Rd for a duration of 2 days. Sidewalk closure on north side of W Tapp Rd across from 1351 W Tapp Rd for a duration of 1 day. Sidewalks will remain open overnight. Closures will occur in the date range of 10/1/24-10/15/24.
Police presence shall be required as part of traffic control.
Engineering
LINESTRING(-86.54847549658044 39.13659739770202,-86.54815972745054 39.13691513656582)
CBU Lane closure- Park and Woodlawn
Park and Woodlawn between 1st and 2nd
October 7, 2024 to October 18, 2024
Please be advised that CBU crews will close E University St between S Park Ave and S Woodlawn Ave due to sanitary sewer replacement. In addition, the northbound lane of Park will be closed on day 1 and the southbound lane of Woodlawn will be closed on the last day between 1st and 2nd. This project will start no earlier than 10/7/2024 and end no later than 10/18/2024. Road signs are in place.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.52401179066109 39.16107348540777,-86.52400530762122 39.16043759503356),LINESTRING(-86.52402475674081 39.1597539436348,-86.52400530762122 39.160440108445556),LINESTRING(-86.52264386924959 39.16021390100565,-86.52263090316987 39.16108856574212))
Retiring Gas Service on W Bloomfield Rd
1209 W 2nd St
October 7, 2024 to October 8, 2024
Centerpoint will be retiring a gas service in the straight lane of the W Bloomfield/S Patterson Dr intersection on the west side of the intersection. Traffic will be directed into the left and right turn lanes, with the run lane acting as the thru lane for the duration of the work.
Engineering
LINESTRING(-86.54884948377814 39.16058458220053,-86.54851511901605 39.16075620444212)
Milling and Resurfacing on S Cottonwood Cir
S Cottonwood Cir from E Buttonwood Ln to the dead end
October 7, 2024 06:00 am to 16:00 pm October 8, 2024
Lane restrictions and no parking on S Cottonwood Cir from E Buttonwood Ln to the dead end for milling and resurfacing.
Street
LINESTRING(-86.49822457250741 39.139246926335574,-86.49835488076953 39.13938560218787,-86.49837609374244 39.13944436305982,-86.49839427629065 39.13982043147905,-86.49840033714005 39.140001413689845,-86.49831851567312 39.140125985590515)
Milling and Resurfacing on Buttonwood Ln
E Buttonwood Ln and S Buttonwood Ln from S Sare Rd to the dead end
October 7, 2024 06:00 am to 16:00 pm October 8, 2024
Lane restrictions and no parking on E Buttonwood Ln and S Buttonwood Ln from S Sare Rd to the dead end for milling and resurfacing.
Street
LINESTRING(-86.49659301469815 39.13922902594567,-86.49732350665276 39.13923196159374,-86.49773984921755 39.139293610175145,-86.49790260131107 39.139322966623524,-86.49808049313421 39.13930241711094,-86.49822053563328 39.139226090297456,-86.49832651374068 39.13911747122788,-86.49837193292957 39.13897655975279,-86.49834543840268 39.13772008663088)
Milling and Resurfacing on S McCartney Ln
S McCartney Ln from S Sare Rd to S Sare Rd and S McCartney Ln from S McCartney Ln to the dead end.
October 7, 2024 06:00 am to 16:00 pm October 17, 2024
Lane restrictions and no parking on S McCartney Ln from S Sare Rd to S Sare Rd and S McCartney Ln from S McCartney Ln to the dead end for milling and resurfacing.
Street
GEOMETRYCOLLECTION(LINESTRING(-86.49752989293448 39.14585630648483,-86.49780965769214 39.145660334074535,-86.49792998662018 39.14556934669861,-86.49808942244982 39.14529871688518,-86.49810446356581 39.145212395087896,-86.4980834060034 39.145128406210546,-86.49795104418257 39.14500942179609,-86.49787283037936 39.14492543267659,-86.49777355901372 39.144608139542754,-86.49774648500494 39.144419162805605,-86.49769835343372 39.14430950940448,-86.49756599161289 39.14426751443966,-86.49705760189195 39.1442885119252,-86.49696133874953 39.14428384581785),LINESTRING(-86.49770737810333 39.14430950940448,-86.49782169058494 39.14434450518934,-86.49793299484337 39.14432350772054,-86.4980442991018 39.144276846656226,-86.498077389557 39.14423251861652,-86.4980713731106 39.14418585749195,-86.4980051922002 39.14410886656873,-86.49792397017379 39.14407853678799,-86.49776152612093 39.1441251979837,-86.49768632054091 39.14420452194548,-86.49769233698731 39.144297844139004),LINESTRING(-86.49786681393296 39.144934764805924,-86.4972350870608 39.14499542361651))
CBU Road Closure - University
University St between Park and Woodlawn;
October 7, 2024 to October 18, 2024
Please be advised that CBU crews will close E University St between S Park Ave and S Woodlawn Ave due to sanitary sewer replacement. In addition, the northbound lane of Park will be closed on day 1 and the southbound lane of Woodlawn will be closed on the last day between 1st and 2nd. This project will start no earlier than 10/7/2024 and end no later than 10/18/2024. Road signs are in place.
Utilities
LINESTRING(-86.52397866423327 39.160372256982214,-86.52269377049983 39.16036313351327)
Temporary Lane and Sidewalk Closures for Fiber Installation
233 S Pete Ellis Dr to 3015 E Longview Ave.
October 7, 2024 to October 18, 2024
Smithville will be extending fiber connection from existing handholes along Pete Ellis Dr and E Longview Ave between 10/7/24 and 10/18/24. The work will involve temporary lane and sidewalk closures while the crew installs new conduit ducts in the ground.
Engineering
LINESTRING(-86.49523911823984 39.16697117162374,-86.49498702889784 39.16691905238838,-86.49401788542755 39.1668929927562)
Alley Closure for Aerial Fiber Removal
Behind 200 E Kirkwood Ave in the alleyway between E Kirkwood Ave and E 4th St
October 7, 2024 to November 1, 2024
Smithville will be removing aerial fiber lines from utility poles behind 200 E Kirkwood Ave between October 3rd, 2024, and November 1st, 2024. All work will be within the alleyway and no lane or sidewalks will be closed.
Engineering
LINESTRING(-86.53232148215073 39.166079825957524,-86.53113473633039 39.16608153619177)
GeoSolutions Inc. S High St Soil Borings
S High St between E Arden Dr and E 2nd St
October 7, 2024 to October 18, 2024
GeoSolutions Inc. will be performing 14 Soil Borings for the geotechnical investigation for a Multi-Use Path along S High Street on the east side of the road, signal poles at S High St & E Moores Pike and S High St and E 2nd St intersections and retaining walls. Lane closures will occur along S High St between E Arden Dr and E 2nd St and within the time period of 10/07/24-10/18/24 for a total of 4 days. Closures will occur between 9:30 AM and 3:15 PM.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.50838863680828 39.14984102986037,-86.50835764639136 39.151403061580055),LINESTRING(-86.50839563155559 39.148852648954175,-86.50839003602982 39.148075943579386),LINESTRING(-86.50837136095126 39.15347735442694,-86.5084364736762 39.15558357594509),LINESTRING(-86.50843961323062 39.157876353517565,-86.5084318807015 39.15911141711638),LINESTRING(-86.50843188070152 39.16052607023022,-86.5084009523547 39.16150928945581))
Posh Hotel Construction Alley Closure
200 E Kirkwood
October 8, 2024 to October 15, 2024
Alley closure for footer construction of Posh Hotel.
External Project
LINESTRING(-86.53231773767287 39.166078922090094,-86.53198782596405 39.166079961873265)
Gas service repair at 1915 S Walnut St
1915 S Walnut St
October 9, 2024 to October 11, 2024
Centerpoint will be repairing the gas service at 1915 S Walnut St. The work will include a lane closure on E Miller Dr while they repair the service.
Engineering
LINESTRING(-86.53182813677228 39.14690366243798,-86.53089924057772 39.14690171017037)
Milling and Resurfacing on E Winston St
E Winston St from S Sare Rd to S Forrester St
October 9, 2024 06:00 am to 16:00 pm October 24, 2024
Lane restrictions and no parking on E Winston St from S Sare Rd to S Forrester St for milling and resurfacing.
Street
LINESTRING(-86.49697705409496 39.14510423661997,-86.49682515814834 39.145109249507215,-86.4966344802579 39.145124288166755,-86.49646965699668 39.14514935259217,-86.49622403801916 39.14521201361663,-86.49605275110065 39.145269661709875,-86.49555828131699 39.14552030504467,-86.49542577634229 39.1455729400316,-86.49518662102209 39.145628081404254,-86.4950993616485 39.145635600679014,-86.49353192475257 39.14565063922606,-86.49324334146479 39.145650639226034,-86.49311083649008 39.14563058782923,-86.49294924505752 39.145580459312214,-86.49276179899573 39.14546015072568,-86.49269069876539 39.14536741271661,-86.49260343939181 39.14523457157176,-86.4925840484199 39.145094210844434,-86.49263898950694 39.14481098209606,-86.49267130779347 39.14464054300797,-86.49268100327942 39.144500181096134,-86.49267130779347 39.1444149612274,-86.49260343939179 39.14424953412882,-86.49255496196203 39.14418436577117,-86.49244507978787 39.14409162608118,-86.4922834883553 39.144003899234974,-86.49213805606598 39.143963795497456,-86.49200878291992 39.14394374362013,-86.4916435147024 39.14394541090911,-86.49143990949736 39.14395794333285)
Duke Energy Lane & Sidewalk Closures on W. 2nd St
400 W 2nd
October 9, 2024 to November 1, 2024
Intermittent lane and sidewalk closures on W. 2nd St. between S Morton St. and S Rogers St. for the installation of temporary lighting for the city. The work will occur between 10/09/2024 and 11/01/24 and the intermittent closures will occur over one week in that range.
Engineering
LINESTRING(-86.5387038511786 39.161393332763936,-86.53628208781817 39.161393332763936)
S EAGLESON AVE ROAD CLOSING
CLOSING Both lanes of the 600 Block of S Eagleson Ave between E 2nd & E University Streets
October 9, 2024 daily for 10 times
City of Bloomington Utilities will close both lanes of the 600 block of S Eagleson Ave to repair a hit water main.
Utilities
LINESTRING(-86.51637773890165 39.160153163715876,-86.51638887572463 39.16102820329536)
Milling and Resurfacing on E Charles Ct
E Charles Ct from E Diana Ct to the dead end
October 10, 2024 06:00 am to 16:00 pm October 17, 2024
Lane restrictions and no parking on E Charles Ct for milling and resurfacing.
Street
LINESTRING(-86.49152127632472 39.14559266476007,-86.49152580679193 39.14517981812844)
Milling and Resurfacing on S Atlee Ct
S Atlee Ct cul-de-sac from E Winston St to the dead end
October 10, 2024 06:00 am to 16:00 pm October 17, 2024
Lane restrictions and no parking on S Atlee Ct for milling and resurfacing.
Street
LINESTRING(-86.49356026140713 39.14562315360024,-86.49355300632594 39.145291181383556)
Milling and Resurfacing on E Diana Ct
E Diana Ct from E Winston St to the dead end
October 10, 2024 06:00 am to 16:00 pm October 17, 2024
Lane restrictions and no parking on E Diana Ct for milling and resurfacing.
Street
LINESTRING(-86.49268858205558 39.14540498940457,-86.49236850238778 39.14555581655989,-86.49216794614024 39.145612376659784,-86.49190458945158 39.14562023222564,-86.49077620733163 39.145598236639074)
Milling and Resurfacing on S Thatcher Ct
S Thatcher Ct from E Winston St to the dead end
October 10, 2024 06:00 am to 16:00 pm October 17, 2024
Lane restrictions and no parking on S Thatcher Ct for milling and resurfacing.
Street
LINESTRING(-86.49606246386963 39.14529189271869,-86.4962920947387 39.14562720138437)
Milling and Resurfacing on S Churchill Ct
S Churchill Ct from E Winston St to the dead end
October 10, 2024 06:00 am to 16:00 pm October 17, 2024
Lane restrictions and no parking on S Churchill Ct for milling and resurfacing.
Street
LINESTRING(-86.4948665160616 39.14561929067051,-86.49485567696726 39.14521369060657)
Alley Closure for Dumpster Placement
E/W Alleyway just west of First Church of the Nazarene at 700 W Howe St
October 10, 2024 to October 11, 2024
The HAND Department will be performing work at a property near the Bloomington First Church of the Nazarene to remove contaminated soil from the residence off the E/W alleyway. A dumpster will be placed in the alleyway and the alley closed as they remove any soil.
Engineering
LINESTRING(-86.5422041002281 39.16285778274434,-86.54179191473557 39.16285657217733)
S Woodlawn Ave closure.
S Woodlawn Ave between 1st and 2nd streets.
October 13, 2024
CBU needs to close S Woodlawn Ave for the Sewer Replacement Project.
Utilities
LINESTRING(-86.5226298706687 39.161085632401154,-86.52262450569728 39.159330150821745)
Road Closed and No Parking on E 11th St for Tree Removal
E 11th St between N Dunn St and N Indiana Ave
October 14, 2024 06:00 am to 15:00 pm
Road Closed and No Parking on E 11th St between N Dunn St and N Indiana Ave for tree removal
Street
LINESTRING(-86.52702502058864 39.17346176475294,-86.52771300720096 39.17346384410098)
Aerial fiber installation along W 17th St & N Dunn St
W 17th St between N Jackson St and N College Ave, N Dunn St between E 14th St and E 16th St
October 14, 2024 to October 18, 2024
Smithville will be moving their aerial fiber lines from old utility poles to new poles along W 17th St and N Dunn St the week of October 14th. The work will involve a lane and sidewalk closure as they shift the fiber lines.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53958735202067 39.17897258518582,-86.53540393557545 39.17895316670615),LINESTRING(-86.5283167906428 39.17619824504925,-86.52833349090805 39.177751767346706))
Gas Service Repair at 2614 S Bryan St
2614 S Bryan St
October 14, 2024 to October 16, 2024
Centerpoint will have a lane closure as they repair the gas service at 2614 S Bryan St. The work will take 1 day with the lane closure present on Bryan St near W Watson St turn.
Engineering
LINESTRING(-86.53616758579356 39.13713071158119,-86.53616574180367 39.13764989686854)