Allen St. Bridge
Bridge between S Morton and S Walnut (150-156 W Allen St)
January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
B-Line Extension Project, from Adams St along Fountain, up Crescent Rd to 17th St.
Adams St along Fountain Dr., up Crescent Rd. to 17th St.
April 1, 2024 to November 15, 2024 daily until November 15, 2024
B-Line Extension Project. This project runs from Adams St along the north side of Fountain Dr., up the east side of Crescent Rd to 17th St. There will be lane restrictions throughout the project.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55154570965307 39.170728870443895,-86.55521901332583 39.17334679210555,-86.55670122308807 39.175225240685876),LINESTRING(-86.55673989032744 39.17525521592228,-86.55652078039554 39.17572481971655,-86.55659811290778 39.17904193408043))
Downtown Street Maintenance Project
6th Street from Walnut to near Indiana Ave.
August 26, 2024 to December 2, 2024
These areas will have lane and parking restrictions while milling, repaving, sidewalk, curb ramp and pavement markings are completed. Dates may vary.
Engineering
LINESTRING(-86.53363224373408 39.16561155500605,-86.52690403825018 39.165552529069174)
Downtown Street Maintenance Project
College from 4th Street to 11th Street
August 26, 2024 to December 6, 2024
These areas will have lane and parking restrictions while milling, repaving, sidewalk, curb ramp and pavement markings are completed. Dates may vary.
Engineering
LINESTRING(-86.5347999512804 39.17329156881223,-86.53484833322103 39.165571947686345)
Downtown Street Maintenance Project
Walnut Street from 3rd Street to 11th street.
August 26, 2024 to December 6, 2024
These areas will have lane and parking restrictions while milling, repaving, sidewalk, curb ramp and pavement markings are completed. Dates may vary.
Engineering
LINESTRING(-86.53356436993373 39.17321867995096,-86.53359843186503 39.164504105324795)
Downtown Street Maintenance Project
4th Street from Madison Street to Indiana.
August 26, 2024 to December 7, 2024
These areas will have lane and parking restrictions while milling, repaving, sidewalk, curb ramp and pavement markings are completed. Dates may vary.
Engineering
LINESTRING(-86.5374249646552 39.16555616012397,-86.52697360310442 39.16557286773963)
Rolling Lane Closure for Fiber Installation - AT&T
W Country Club Dr at S Madison St; S Rogers St between W Ralston Dr and W Watson St
August 30, 2024 to December 31, 2024
Lineal will be working for AT&T to install fiber to connect to existing infrastructure for about 2 weeks between September and December 2024.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53768325285297 39.13604253720001,-86.53709024499783 39.13601780782696,-86.53722414999739 39.1371207294211),LINESTRING(-86.53911157284814 39.13840167945304,-86.53844842427895 39.13837695090854,-86.53828263713665 39.136799251816626))
Conduit installation along S Walnut St Pike and E Winslow Rd
S Walnut St Pike & E Winslow Rd; S Henderson St & E Winslow Rd
September 23, 2024 to December 27, 2024
Lineal will be installing conduit for AT&T to connect some of their existing infrastructure at the intersections of E Winslow Rd, S Walnut St Pike, and S Henderson St. The work is estimated to take about 7 days to complete and will include a lane and sidewalk closure at the locations. The work is planned between September 2024 and December 2024.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52873739116825 39.13589253529207,-86.52881526461753 39.13599488412237,-86.52887777603895 39.13607704257987),LINESTRING(-86.52880758360358 39.13599840018847,-86.52684219541364 39.13605889434348),LINESTRING(-86.52695179841065 39.13439149649986,-86.52678625012067 39.13439716166707))
Flock Safety Camera Installation Along E Kirkwood Ave and N Walnut St
Intersections of E Kirkwood Ave/ S Dunn St, E Kirkwood Ave/ S Grant St, W Kirkwood Ave/ N Walnut St, and N Walnut St/E 7th St
October 23, 2024 to February 23, 2025
Flock Safety is working with the Bloomington Police Department to install live video feed cameras in the right-of-way to aid in BPD investigations. The cameras will be placed in 4 locations along E Kirkwood Ave and N Walnut St. The installation will require a lane closure at each location and is expected to take 5 days to complete.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53357133571649 39.1686589718461,-86.53357444106325 39.1685795228299,-86.53346575392663 39.1685795228299),LINESTRING(-86.52827554433638 39.16662837741421,-86.52827554433638 39.16655735276254,-86.52846807583555 39.166564575611716),LINESTRING(-86.52991059769879 39.16653703479517,-86.5298158846226 39.1665334233692,-86.52981743729597 39.16644554528119),LINESTRING(-86.5335836883135 39.166679163000026,-86.5335836883135 39.16660452697732,-86.53343773701573 39.166608138399596))
AT&T Fiber Installation at the Intersection of S Madison St & W Smith Ave
W Smith Ave & S Madison St
October 24, 2024 to January 31, 2025
AT&T will be installing underground fiber at the intersection of S Madison St and W Smith Ave between October 14, 2024 and January 2025. When work begins the installation will require the temporary closure of W Smith Ave during day time hours and will not last more than 3 days once started.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53753840412124 39.16287163325691,-86.53741892384477 39.16286931726947,-86.5372392830538 39.1628658351396),LINESTRING(-86.53741127766757 39.162987595502756,-86.53741875569426 39.162874532315385))
1st Street Reconstruction Project
S College Ave Between W 2nd Street to W 1st Street.
November 4, 2024 to November 15, 2024 weekly on Monday, Tuesday, Wednesday, Thursday, Friday and Saturday until November 24, 2024
Lane restriction, installing new traffic signals.
Engineering
LINESTRING(-86.5349500292704 39.161149626511786,-86.53499382095859 39.15927189620692)
Duke Energy Gateway Project Lighting and Lane Closure
1919 N College Ave
November 20, 2024 to December 4, 2024
Closure of the eastern lane of N College Ave in order to bore underneath N Walnut St from pole 165-528 to Miller Showers Park and trench south along N College Ave as part of the Gateway Project. Closure and work will occur over a single day in the date range of 11/20/24 to 12/4/24.
Engineering
LINESTRING(-86.53453527482759 39.18452841628897,-86.53455487165158 39.18349044460268)
Duke Energy Pole Removal
1798 S Rogers Street
November 20, 2024 to February 18, 2025
Single day lane closure adjacent to 1798 S Rogers Street to remove two temporary poles MNI-13983 and MNI-11785 and install a new anchor. Closure will occur in the date range of 11/20/24 to 02/18/2025.
Engineering
LINESTRING(-86.5388618439407 39.147853213148636,-86.5388343177871 39.148829638985575)
Duke Energy Box Pad Lid Replacement
411 W 8th St
November 21, 2024 to December 9, 2024
3-day sidewalk and lane closure on W 8th St, adjacent to 411 W 8th St, for work replacing the lid of a box pad. The closures will occur between November 21, 2024, and December 9, 2024
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53856601474084 39.16947413518119,-86.53758098712383 39.16947413518119),LINESTRING(-86.53853908592829 39.169527976875514,-86.53764051397266 39.16953566854275))
Duke Energy Sidewalk and Lane closure
229 W 1st St
November 25, 2024 to December 9, 2024
Closure of the East-bound lane of W 1st St between S College Ave and S Morton St and closure of the sidewalk on the south side of W 1st St between S College Ave and S Morton St in order to replace overhead line across W 1st St and bore in ROW on the west side of S College Ave. Closures will occur for a single day in the date range of 11/25/2024 to 12/9/24,
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53615945064095 39.159383650246156,-86.53510909494968 39.15937883115012),LINESTRING(-86.5361780958773 39.15934027785548,-86.53510702330591 39.15933385233288))
Duke N Fee Ln Lane Closure & Pole Installation
825 N Fee Lane
December 2, 2024 to March 15, 2025
Duke Energy will be installing new pole off of N Fee Ln. 1-2 day Lane restrictions only along N Fee Lane adjacent to 825 N Fee Lane in the date range of 12/2/24-3/15/25.
Engineering
LINESTRING(-86.51889218280641 39.17404346449811,-86.51891578629485 39.17426054630877)
Sanitary Sewer Repair in front of 1403 W 8th St
1403 W 8th St
December 3, 2024 to December 6, 2024
Riverway Plumbing will be performing sanitary sewer repairs in front of 1403 W 8th St starting on 12/2/2024 and ending 12/6/2024. The work will involve a lane and sidewalk closure on the south side of W 8th St.
Engineering
LINESTRING(-86.55170040609484 39.16959997131735,-86.55095030034606 39.16960380987683)
1334 N Washington St Water Main
1334 N Washington
December 3, 2024 to December 4, 2024
2 day Lane closure on N Washington St adjacent to 1334 N Washington St to move the water main. Closure will occur from 12/03/2024 to 12/04/2024.
Engineering
LINESTRING(-86.53203545478132 39.18110283492527,-86.53210921552923 39.18050820349009)
Peterson Construction Crew Carwash Evening Lane Closure
235 S Pete Ellis DR
December 3, 2024 to December 6, 2024
Three days of evening lane closures on S Pete Ellis Dr driveway cut and utility relocation for Crew Carwash.
External Project
LINESTRING(-86.4949143450484 39.16475311825434,-86.49490561915393 39.1644058221265)
Gas Service Installation for 2214 E Maxwell Ln
2214 E Maxwell Ln
December 6, 2024
Centerpoint will be installing a new gas service for 2214 E Maxwell Ln and will have a lane closure for the duration of the work.
Engineering
LINESTRING(-86.50718784005461 39.15776618775473,-86.50673624911896 39.15776062952912)
2415 E 4th ST Sewer Line Repair
2415 E 4th ST
December 10, 2024 to December 11, 2024
2-day lane closure on E 4th St and adjacent to 2415 E 4th St to repair a sewer line. Work will occur on 12/10/24 and 12/11/24
Engineering
LINESTRING(-86.50432275986867 39.16568887391256,-86.50363823040593 39.165832657550595)
CBU Road Closure - E Discovery Pkwy
E Discovery Pkwy at 10th St
December 10, 2024 08:00 am to 15:00 pm
Please be advised that CBU crews will close E Discovery Pkwy at 10th St due to sewer repair. The crew will close the road no earlier than 8am and normal traffic flow is expected to resume at 3pm. Road signs will be in place.
Utilities
POINT(-86.49541162372057 39.17159882666431)
Temporary Lane and Sidewalk Restriction for Construction Access
515 N Grant
December 10, 2024
3-4 hour lane and sidewalk closure for Concrete placement on east side of N Grant adjacent to 515 N Grant. Use only, work to take place within property lines.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52983804832287 39.17129172877185,-86.5298398376007 39.17092551824871),LINESTRING(-86.5297843699875 39.171287567299316,-86.52978258070966 39.17091996958976))
620 S Park Ave Sewer Lateral Repair
620 S Park AVE
December 10, 2024 to December 12, 2024
Lane and sidewalk closure on E University St adjacent to 620 S Park Ave during working hours on 12/10/24 to repair a sewer lateral. The sidewalk and street will be excavated, the street cut will be plated overnight, and the removed sidewalk panel will be filled with crushed stone and compacted—sidewalk and pavement repairs to be completed on 12/11/24, with additional lane and sidewalk closures. The sidewalk and lane are to be reopened by 12/12/24.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52474839284405 39.16039181884136,-86.52403626635059 39.16038973910679),LINESTRING(-86.52473498179899 39.16042301485194,-86.52405370070919 39.1604178155178))
Duke Energy Lane and Sidewalk Closure
1200 W Grimes Ln
December 13, 2024 to January 3, 2025
Single-day closure of the northern lane and sidewalk of W Grimes Ln adjacent to 120 W Grimes Ln to Replace the riser on pole 761-710, install a new pad mount transformer and bore primary cable between new transformer and existing transformer 1D1. Work and closures will occur in the date range of 12/13/2024 to 01/03/2025
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.5356767315483 39.153388828260546,-86.53482305439523 39.15337562145396),LINESTRING(-86.5356767315483 39.15342019441627,-86.53482944100735 39.15340368591501))
AT&T Fiber Installation along S Woodscrest Dr and E 3rd St
S Woodscrest at E 2nd St intersection heading north towards 410 S Woodscrest; E 3rd St at S College Mall Rd intersection
December 16, 2024 to February 28, 2025
AT&T will be installing fiber along S Woodscrest Dr and E 3rd St between 12/16/2024 and 2/28/2025 for 2-3 days max once begun. The work will involve a short sidewalk closure and temporary lane closures for equipment
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.5000792424787 39.16421410144247,-86.49890808733562 39.16422524306569,-86.49871768481235 39.16416396411611,-86.49837998977111 39.16416396411611,-86.49830095476145 39.16380464556485),LINESTRING(-86.50295732782295 39.160970161846706,-86.50245507079751 39.16096242467813,-86.5024650494139 39.1618754046973,-86.50246837561937 39.16244278743983))
Residential Cable Connection Installation - 3148 S Coppertree Dr
3148 S Coppertree Dr
December 16, 2024 to January 16, 2025
Between 12/16/2024 and 1/16/2025, QC Communications will be installing a cable connection to the residence of 3148 S Coppertree Dr. The work is expected to take up to a day of work and will include boring underneath Coppertree Dr to the residence.
Engineering
LINESTRING(-86.50437633563978 39.13463022662313,-86.50431488161009 39.13467572763744)
Utility Cabinet Install on east side of S Walnut St
S Walnut St just south of E Winslow Rd on the east side
December 16, 2024 to March 28, 2025
AT&T will be installing a utility cabinet on the east side of S Walnut St just south of E Winslow Rd that will take 2-3 days to install. The work is scheduled between 12/16/2024 and 3/28/2025. The work will primarily be on the road shoulder, but may include brief lane closures during the installation.
Engineering
LINESTRING(-86.53140196468983 39.134648252684315,-86.53139168876503 39.1347890677836,-86.53135058506582 39.134916598196554)
Fiber Relocation for Broadview Learning Center at 705 W Coolidge Dr
705 W Coolidge Dr to W Graham Dr to S Rogers St and south to just past W Ralston Dr.
December 16, 2024 to May 16, 2025
Smithville has scheduled fiber relocation along W Graham Dr, S Rogers St, and just east of S Brown Ave for the Broadview Learning Center. The work is planned between 12/16/2024 and 5/16/2025, but will only take about a week to complete once work begins in the area. Temporary lane closures are expected and a sidewalk closure on S Rogers St for no more than 3 days is expected.
Engineering
LINESTRING(-86.54165863152343 39.14048866259188,-86.54160294424052 39.14016276545618,-86.54160800672078 39.13988005828523,-86.53865151824567 39.139805454814706,-86.53840547566134 39.137843542006095)
CBU Unscheduled Road Closure 12:45 pm today
617 S Fess Avenue both lanes between E 2nd St & E University St
December 18, 2024 12:44 pm to 16:45 pm daily for 10 times
CLOSING BOTH LANES AT 617 S FESS AVENUE BETWEEN E 2ND ST & E UNIVERSITY ST FOR APPROXIMATEL 4 HRS. TODAY 12/18 TO REPAIR A WATER SERVICE HIT.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.52592115478065 39.161306985743636,-86.52592803729522 39.160389101220034),LINESTRING(-86.52592115478065 39.161306985743636,-86.52592115478065 39.161306985743636),LINESTRING(-86.52592115478065 39.161296312736596,-86.52591427226609 39.160394437792576,-86.52592115478065 39.1613016492403))
CBU Road Closure - E 1st St
E 1st St between S Grant St and S Henderson St
December 19, 2024 09:00 am to 15:00 pm
Please be advised that CBU crews will close E 1st St between S Grant St and S Henderson St at 9am Thursday 12/19/2024 due to emergency water line repair. Normal traffic flow is expected to resume at 3pm. Road signs will be in place.
Utilities
LINESTRING(-86.52984304208131 39.15934765873837,-86.52715306208293 39.15932844280124)
CBU Alley Closure - 4th & Rogers
Alley between 410 & 412 W 4th St near Rogers intersection
December 19, 2024 09:00 am to 15:00 pm
Please be advised that CBU crews will close the alley between 410 & 412 W 4th St at 9am Thursday 12/19/2024 due to emergency water line repair. It is expected to be open by 3pm. 105 S Rogers St will lose water for about 30 minutes also
Utilities
LINESTRING(-86.53862875005888 39.16611973351607,-86.53807878138493 39.166118199653766,-86.53805701991138 39.16563811370932)
Alley Closure for Emergency Conduit Repair
Alleyway between E Grimes Ln and E Wilson St that is east of S Walnut St
December 19, 2024 to December 31, 2024
AT&T is repairing a section of conduit that was damaged between E Grimes Ln and E Wilson St east of S Walnut St in the following days. The work will involve an alley closure and will not impact the neighboring streets.
Engineering
LINESTRING(-86.53307361844308 39.153319431830994,-86.53309484548039 39.15154576898692)
204 E 17th St Alley Paving
204 E 17th St
December 23, 2024 to August 1, 2025
Pavement of the gravel alleyways to the south and east of 204 E 17th St. 2-week closure to pave the alleyways will occur in the date range of 12/23/2024-08/01/2025
Engineering
LINESTRING(-86.53167789778871 39.178935841290155,-86.53168594441574 39.17857614115957,-86.53198769292993 39.17857614115957)
Smithville Fiber Installation along S Union St from E 7th St to E 4th St
S Union St between E 7th St and E 4th St, E 4th St between S Union St and S Jefferson St
December 26, 2024 to January 24, 2025
Smithville will be installing new fiber conduit along S Union St and E 4th St to connect to the Fire Station #4 area.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.50945070068101 39.168069689466165,-86.50939072807897 39.16556813037789,-86.50714775276222 39.16560532893419),LINESTRING(-86.50659600482334 39.165549531092324,-86.50657201578252 39.164703258397594))
AT&T Fiber Installation along N Smith Rd
N Smith Rd between E Grandview Dr and E Morningside Dr, Morningside Dr to E Saratoga Dr
December 30, 2024 to March 28, 2025
AT&T will be installing fiber along N Smith Rd from E Morningside Dr and E Saratoga Dr between 12/30/2024 and 3/28/2025. The work will take 2-3 days once started and will only include a lane closure during that time period. The sidewalks will not be impacted.
Engineering
LINESTRING(-86.48127986784151 39.168652953912726,-86.48124060360924 39.16624806013084,-86.48099193013813 39.16624298642836,-86.48045531896362 39.16638504995993,-86.48019355741508 39.16600452199816)