Allen St. Bridge

Bridge between S Morton and S Walnut (150-156 W Allen St)

January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)

B-Line Extension Project, from Adams St along Fountain, up Crescent Rd to 17th St.

Adams St along Fountain Dr., up Crescent Rd. to 17th St.

April 1, 2024 to November 15, 2024 daily until November 15, 2024
B-Line Extension Project. This project runs from Adams St along the north side of Fountain Dr., up the east side of Crescent Rd to 17th St. There will be lane restrictions throughout the project.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55154570965307 39.170728870443895,-86.55521901332583 39.17334679210555,-86.55670122308807 39.175225240685876),LINESTRING(-86.55673989032744 39.17525521592228,-86.55652078039554 39.17572481971655,-86.55659811290778 39.17904193408043))

Flock Safety Camera Installation Along E Kirkwood Ave and N Walnut St

Intersections of E Kirkwood Ave/ S Dunn St, E Kirkwood Ave/ S Grant St, W Kirkwood Ave/ N Walnut St, and N Walnut St/E 7th St

October 23, 2024 to February 23, 2025
Flock Safety is working with the Bloomington Police Department to install live video feed cameras in the right-of-way to aid in BPD investigations. The cameras will be placed in 4 locations along E Kirkwood Ave and N Walnut St. The installation will require a lane closure at each location and is expected to take 5 days to complete.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53357133571649 39.1686589718461,-86.53357444106325 39.1685795228299,-86.53346575392663 39.1685795228299),LINESTRING(-86.52827554433638 39.16662837741421,-86.52827554433638 39.16655735276254,-86.52846807583555 39.166564575611716),LINESTRING(-86.52991059769879 39.16653703479517,-86.5298158846226 39.1665334233692,-86.52981743729597 39.16644554528119),LINESTRING(-86.5335836883135 39.166679163000026,-86.5335836883135 39.16660452697732,-86.53343773701573 39.166608138399596))

AT&T Fiber Installation at the Intersection of S Madison St & W Smith Ave

W Smith Ave & S Madison St

October 24, 2024 to January 31, 2025
AT&T will be installing underground fiber at the intersection of S Madison St and W Smith Ave between October 14, 2024 and January 2025. When work begins the installation will require the temporary closure of W Smith Ave during day time hours and will not last more than 3 days once started.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53753840412124 39.16287163325691,-86.53741892384477 39.16286931726947,-86.5372392830538 39.1628658351396),LINESTRING(-86.53741127766757 39.162987595502756,-86.53741875569426 39.162874532315385))

Duke Energy Pole Removal

1798 S Rogers Street

November 20, 2024 to February 18, 2025
Single day lane closure adjacent to 1798 S Rogers Street to remove two temporary poles MNI-13983 and MNI-11785 and install a new anchor. Closure will occur in the date range of 11/20/24 to 02/18/2025.
Engineering
LINESTRING(-86.5388618439407 39.147853213148636,-86.5388343177871 39.148829638985575)

Duke N Fee Ln Lane Closure & Pole Installation

825 N Fee Lane

December 2, 2024 to March 15, 2025
Duke Energy will be installing new pole off of N Fee Ln. 1-2 day Lane restrictions only along N Fee Lane adjacent to 825 N Fee Lane in the date range of 12/2/24-3/15/25.
Engineering
LINESTRING(-86.51889218280641 39.17404346449811,-86.51891578629485 39.17426054630877)

AT&T Fiber Installation along S Woodscrest Dr and E 3rd St

S Woodscrest at E 2nd St intersection heading north towards 410 S Woodscrest; E 3rd St at S College Mall Rd intersection

December 16, 2024 to February 28, 2025
AT&T will be installing fiber along S Woodscrest Dr and E 3rd St between 12/16/2024 and 2/28/2025 for 2-3 days max once begun. The work will involve a short sidewalk closure and temporary lane closures for equipment
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.5000792424787 39.16421410144247,-86.49890808733562 39.16422524306569,-86.49871768481235 39.16416396411611,-86.49837998977111 39.16416396411611,-86.49830095476145 39.16380464556485),LINESTRING(-86.50295732782295 39.160970161846706,-86.50245507079751 39.16096242467813,-86.5024650494139 39.1618754046973,-86.50246837561937 39.16244278743983))

Utility Cabinet Install on east side of S Walnut St

S Walnut St just south of E Winslow Rd on the east side

December 16, 2024 to March 28, 2025
AT&T will be installing a utility cabinet on the east side of S Walnut St just south of E Winslow Rd that will take 2-3 days to install. The work is scheduled between 12/16/2024 and 3/28/2025. The work will primarily be on the road shoulder, but may include brief lane closures during the installation.
Engineering
LINESTRING(-86.53140196468983 39.134648252684315,-86.53139168876503 39.1347890677836,-86.53135058506582 39.134916598196554)

Fiber Relocation for Broadview Learning Center at 705 W Coolidge Dr

705 W Coolidge Dr to W Graham Dr to S Rogers St and south to just past W Ralston Dr.

December 16, 2024 to May 16, 2025
Smithville has scheduled fiber relocation along W Graham Dr, S Rogers St, and just east of S Brown Ave for the Broadview Learning Center. The work is planned between 12/16/2024 and 5/16/2025, but will only take about a week to complete once work begins in the area. Temporary lane closures are expected and a sidewalk closure on S Rogers St for no more than 3 days is expected.
Engineering
LINESTRING(-86.54165863152343 39.14048866259188,-86.54160294424052 39.14016276545618,-86.54160800672078 39.13988005828523,-86.53865151824567 39.139805454814706,-86.53840547566134 39.137843542006095)

204 E 17th St Alley Paving

204 E 17th St

December 23, 2024 to August 1, 2025
Pavement of the gravel alleyways to the south and east of 204 E 17th St. 2-week closure to pave the alleyways will occur in the date range of 12/23/2024-08/01/2025
Engineering
LINESTRING(-86.53167789778871 39.178935841290155,-86.53168594441574 39.17857614115957,-86.53198769292993 39.17857614115957)

AT&T Fiber Installation along N Smith Rd

N Smith Rd between E Grandview Dr and E Morningside Dr, Morningside Dr to E Saratoga Dr

December 30, 2024 to March 28, 2025
AT&T will be installing fiber along N Smith Rd from E Morningside Dr and E Saratoga Dr between 12/30/2024 and 3/28/2025. The work will take 2-3 days once started and will only include a lane closure during that time period. The sidewalks will not be impacted.
Engineering
LINESTRING(-86.48127986784151 39.168652953912726,-86.48124060360924 39.16624806013084,-86.48099193013813 39.16624298642836,-86.48045531896362 39.16638504995993,-86.48019355741508 39.16600452199816)

Duke Energy Pole Maintenance and Lane Closure

2333 E 3rd ST

January 1, 2025 to March 31, 2025
1-2 day lane closure on the east bound lane of E 3rd St adjacent to 2420 E 3rd St occuring between 1/1/25 and 3/31/25. Duke Energy will be replacing overhead equipment on pole # 168-648. No overnight closure will occur.
Engineering
LINESTRING(-86.50515985143561 39.1642149742589,-86.50417888918273 39.16421732606571)

Duke Energy Pole Maintenance and Lane Closure

300 W 1st St

January 1, 2025 to March 31, 2025
Duke Energy Will be replacing overhead equipment on pole # 152-631. 1-2 day lane closure on S Morton St between W 1st St and W 2nd St occuring between 1/1/25 and 3/31/25. No overnight closure will occur.
Engineering
LINESTRING(-86.53629041294062 39.15972695157808,-86.53628327644239 39.16022912794409)

Duke Energy Work

4000 N Kinser Pike

January 1, 2025 to January 31, 2025
WO # 47538323, 1-2 day lane closure for to replace overhead equipment on pole # 155-461.
External Project
LINESTRING(-86.54741228999647 39.21062850444568,-86.54743031227328 39.209586771065005)

Duke - S High St Lane Closure

2000 E Wexley Rd

January 1, 2025 09:00 am to 14:30 pm March 31, 2025
WO# 46628237. Replacing overhead equipment on pole # MNI-6099. 1-2 day lane closure of S High St south of E Wexley Rd in the date range of 01/01/2025 to 03/31/2025. No overnight closure.
Engineering
LINESTRING(-86.50816896765443 39.13690697494957,-86.50817648644521 39.13735456822633)

Duke W Smith Ave Bike Lane Closure

350 S Walnut ST

January 1, 2025 to March 31, 2025
WO#46628241. Replacing overhead equipment on pole # 764-554. 1-2 day lane closure of the east bound bike lane on the south side of W Smith Ave between S College Ave and S Walnut St. Vehicle lane to remain open. No overnight closure.
Engineering
LINESTRING(-86.53367690841516 39.16284345646315,-86.53486691439286 39.16283897746581)

E Weymouth Ln Lift Station

E Weymouth Ln

January 1, 2025 to February 28, 2025
Road and sidewalk closure on E Weymouth Ln to install a lift station on behalf of the City of Bloomington Utilities. The closures will last approximately two months. Local access will be maintained for the closures, and a sidewalk will remain open on the street. Kokosing Industrial will provide advance notice to homeowners affected by the closures through door hangers. The closures will begin on January 1, 2025, and end on February 28, 2025
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.47448619867475 39.174443691933334,-86.47303366642517 39.17383204414776),LINESTRING(-86.47442650185764 39.17450735674015,-86.47300195409574 39.17391407058781))

Duke Energy Overhead work and Pole Replacement

S Walnut St Pike

January 1, 2025 to March 31, 2025
Rolling lane closures and shoulder work along S Walnut St Pike between S Walnut St and E Winslow Rd to replace overhead equipment on six poles and replace two poles. Lane closures will occur over 3 days in the date range of 01/01/2025 to 03/31/2025.
Engineering
LINESTRING(-86.52980615723311 39.13724019435821,-86.52901702137609 39.1362388677575)

Lane and Sidewalk Closures for Duke Energy Work

E Hillside Dr

January 1, 2025 to March 31, 2025
WO# 42365068. Replacing 9 poles, Replacing overhead equipment on 36 poles, removing equipment from 1 pole, and installing equipment on 2 poles along B-Line Trail/S Walnut Street, E Hillside Drive/S Henderson Street, and S High Street in Bloomington, IN 47403 Permitted closures include: - 1 day of lane and sidewalk closures along the south side of E Hillside Dr between S Henderson St and S High St. - 1 day of lane and sidewalk closures along the east side of S High St between E Hillside Dr and E Southdowns Dr. - 1 day of lane and sidewalk closures along the east side of S Henderson St between E Hillside Dr and E Thornton Dr. Closures will occur in the date range of 01/01/2025 03/31/2025
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.50857144679036 39.150400530436286,-86.52699265985356 39.150509224305694),LINESTRING(-86.52699265985356 39.150509224305694,-86.53350015359871 39.15044711354375))

Duke Energy Pole Replacement - W Tapp Rd and W Graham Dr

Near 1722 W Tapp RD and near 913 W Graham Dr

January 1, 2025 to April 30, 2025
WO# 40995283. 1-2 hour closure of the southern lane of W Graham Dr near S Broadview Dr for a pole replacement. 1-2 hour closure of the northern lane of W Tapp Rd near S Boardwalk Cir for a pole replacement. Closures will occur in the date range of 01/01/2025 to 04/30/2025.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55877613398205 39.13654860840089,-86.55780002275073 39.1365412720169),LINESTRING(-86.54365036332634 39.13994197229269,-86.54247186295382 39.13991791829332))

Duke Energy Pole Relocation

1020 N Monroe St

January 17, 2025 to January 31, 2025
Single-day closure of the eastern lane, sidewalk, and crosswalk adjacent to 1020 N Monroe St to remove one pole, install a new pole 25 ft south of the original pole, and replace overhead wire to the new pole. Work will occur in the date range of 01/17/2025-01/31/2025.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.54727264892446 39.175707021371636,-86.54727495253911 39.1762123983045),LINESTRING(-86.54719202241155 39.176239184966335,-86.5471943260262 39.17553737105686))

Sanitary Replacement and Repair at 816 W Kirkwood Ave

816 W Kirkwood Ave

January 27, 2025 to January 31, 2025
Benjamin Franklin Plumbing is repairing and replacing the sanitary sewer lateral for the property of 816 W Kirkwood and will have a lane and sidewalk closure at the property for the work. The work is between 1/27/2025 and 1/31/2025.
Engineering
LINESTRING(-86.54297560045009 39.16667287053136,-86.54281737350554 39.16667287053136)

Street Repairs at 3rd & Bypass

E Third St & 45-46 Bypass/College Mall Rd

January 29, 2025 22:00 pm to 07:00 am January 30, 2025
Public Works Street division will work overnight to repair the road at 3rd & the bypass after a water main break. They will close the intersection from 10pm Wednesday 1/29/25 until 7am Thursday 1/30/25. Vehicles will only be able to turn right from all directions.
Street
LINESTRING(-86.49816255784596 39.16416875013931,-86.49821119751884 39.1643610824232,-86.4984106201776 39.16432714147015,-86.49837170843931 39.16413480909344,-86.49816255784596 39.16417252136563)